
PAC-3 Assembly ©2009 MadCow Rocketry™ 3
Ensureringsareclearofthenslots
Step 4 – Fin Assembly
Testteachofthensintotheprecutnslots.Thenshouldseatrmlyagainstthe
motortube-sandeachnifnecessary.ThePAC-3nsconsistoftheaftns,whichare
Tshaped,andtheforwardnswhicharewedgeshaped.BeginwiththeaftTshaped
nsandapplysomeepoxytotheendofthentangthatwillcontactthemotortube(the
topoftheT).Also,spreadathinlayerofepoxyoneachsideofthentang.Slidethe
nintoplaceandcheckthealignment.Continuerecheckingthenalignmentuntilyou
aresuretheepoxyhasset.Cleananyexcessepoxyfromaroundthenjoint.Repeat
fortheremainingaftns.Next,attachtheremaining4forwardnsensuringtheyare
alignedwiththe4aftnsandtheyareseatedagainsttheaftendoftheslot(slidall
thewaybackasfarastheycango).Last,applyepoxylletstobothsidesofeachn.
Carefullysmooththeepoxylletswithyourngerbeforetheepoxysets.Alloweachllet
tosetbeforerotatingtheairframeforthenextllet.
Step 6 – Launch Lug Attachment
Mark the CG point along the launch lug line you made in a previous step. Make sure you
measure the CG point from the tip of the nose cone and NOT the end of the body tube.
Apply a small amount of epoxy on the launch lug line about ¾” long on the CG mark.
Press one of the launch lugs into the epoxy and ensure that it is aligned with the launch
lugline.Youcansitedownthetubeandlookthroughthelaunchlugtomakesureitis
straight. Similarly epoxy the second launch lug about 1/2” from the aft end of the body
tube. Site down both launch lugs and make sure they are both aligned. If you have a ¼”
launch rod, you can use this to ensure that both lugs are aligned properly.
Step 5 – Forward Section Assembly
Insert the eyebolt through the hole in the center of the bulkhead and secure using the
washer and nut. IMPORTANT: Apply some epoxy to the nut and eyebolt threads
to ensure the nut doesn’t come loose later. Apply some epoxy to the inside of the
coupler and push the bulkhead in so there is about a 1/8” to ¼” of coupler exposed. After
theepoxyhasset,applyalletofepoxyaroundtheinsideedgeofthecouplerbulkhead
joint.Nextmarkthecoupler2”fromtheforwardedge.Applysomeepoxytotheinside
of the forward body tube section and slide the coupler up to the mark. There should
be 3” of coupler exposed.
Make sure the coupler is
straight and the body tubes
are aligned properly when
they are assembled later.
over the forward centering ring) Spread some more epoxy on the inside edge of the
body tube before sliding the rear centering ring into the body tube. Continue sliding the
assembly inside the body tube until the aft end of the motor tube is even with the aft
endofthebodytube.It’sagoodideatotesttanineachslotherebeforetheepoxy
sets. Hold the body tube with the motor
tube assembly down until the epoxy sets.
Make sure the weight of the motor assembly
doesn’t cause it to slide out of alignment.
Next, epoxy one of the couplers into the
forward end of the aft body tube leaving 2 5/8” of the coupler exposed. The coupler will
coverpartoftheforwardnslots-makesuretheuncoveredsectionofthenslotislong
enoughfortheforwardntangs.Itisagoodideatotestttheforwardnsintoeach
slot before the coupler glue dries. When the coupler epoxy dries, attach the long middle
sectionofthebodytubetotheaftbodytube.Last,usingadoorjamorsmallsectionof
anglestock,pencilalinehalfwaybetweentwoofthensthatextendsfromthefrontto
the back of the body tube. This line will be used later to align the launch lugs.