Mastech MS2201 User manual

3
3
3
3 PHASE
PHASE
PHASE
PHASE DIGITAL
DIGITAL
DIGITAL
DIGITAL POWER
POWER
POWER
POWER CLAMP
CLAMP
CLAMP
CLAMP METER
METER
METER
METER
Safety
Safety
Safety
Safety Precautions
Precautions
Precautions
Precautions
·Read these operation instructions thoroughly and completely before operating your meter. Pay
particular attention to WARNING. The instructions in these warnings must be followed.
·You must be careful when working with voltages above 30V AC. Keep fingers behind the probe
barriers while measuring.
·Never use the meter to measure voltages that might exceed the maximum allowable input value of
any function measurement mode.
·Always inspect your meter and test leads before every use. If any abnormal conditions exist: broken
test leads, cracked cases, LCD not reading, etc, do not attempt to take any measurement.
·Using the meter with the equipped test leads is only conform to safety requirements. If you need
instead broken test leads, you must replaced with the same as type and electric specification.
·Never touch a voltage source when the test leads are plugged into a current jack.
·Do not expose the instrument to direct sunlight, extreme temperature
or moisture.
READ
READ
READ
READ THE
THE
THE
THE INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS BEFORE
BEFORE
BEFORE
BEFORE
USING
USING
USING
USING THE
THE
THE
THE INSTRUMENT
INSTRUMENT
INSTRUMENT
INSTRUMENT
WARNING
WARNING
WARNING
WARNING

Safety
Safety
Safety
Safety Information
Information
Information
Information
Three -phase digital power clamp meter has been designed according to IEC1010-1 and
IEC1010-2-032 concerning safety requirements for electrical measuring instruments and
handheld clamps with pollution degree 2, overvoltage category ( 600V CAT Ⅲ) .
Safety
Safety
Safety
Safety Symbols
Symbols
Symbols
Symbols
Important safety information, refer to the operating manual
Dangerous voltage may be present.
Earth ground
Double insulation ( Protection class Ⅱ)
Battery
General
General
General
General Description
Description
Description
Description
Three-phase digital power clamp meter is a handheld aptitude meter with power measurement, it is
incorporate d current meter and power measurement instrument. The meter is composed of three
channels: voltage, current, power and single chip Microcontroller. It has powerful measuring and
data processing software, and complete to measure, calculate and display of the 8 parameters :
Voltage, Current, Active Power, Power Factor, Apparent Power, Reactive Power, Active Energy,
Frequency. It has Stable capability, easy operation. It is especially suitable for measurement and
overhaul of the electric power equipment and the power-supply circuit on the spot. The structure of
the instrument is pincers , it is very small, very light and portable, make measurement easy and fast.
To
the power measurement user, the digital power clamp meter which is used completely in
three-phase system is one of the best instrument.
F
F
F
F eature
eature
eature
eature
1. For power measurement of 3 - phase 3-wire circuit, 3 -phase 4- wire circuit , single - phase circuit.
2.
2.
2.
2. The instrument can complete the true RMS value measurement. If there is nonsinusoidal AC
current input signal, it can accurately measure the active current.
3. Using autorange switch circuit and modulus transducer which has 8000
count and high resolution, the instrument has high accuracy and easy operation.
4. Minimum current of Active Energy measurement is 0.5A , it can
m easure expending energy per hour of gener a l electrical equipment .
Measurement and display five parameters of power: Active Power, Apparent Power, Power Factor,
Reactive Power, Active Energy.
5. Double display two parameters on each menu a n d store 28 groups of
measurement parameter .
6. M easure five power parameters of each phase and total power value in
three -phase measurement mode respectively .
7. M ultifunctional button control , there are double scales analogue bar

graph to display fluctuation of voltage and current.
8. W ith PC RS 232 C interface and special WINDOWS data graphics
software.
9. D isplay measurement time and select tested voltage signal be power
supply for the clamp at one time in Active Energy measurement mode,
so the instrument can measure for long .
10. The instrument is a portable clamp meter. It is very light and
convenient to carrying .
Meter
Meter
Meter
Meter Layout
Layout
Layout
Layout
( Figure 1 )
1 . Clamp Jaws Ф50mm
2 . HOLD Button
Holds the display reading and “ " symbol is shown in the LCD display, press this button again,
the meter return to normal measurement mode.
3 . Function Selector Rotary Switch
Rotate the selector to any measurement function.
4 . Function Selector Buttons
To
select the measurement object.
5 . Input terminal
DC
DC
DC
DC
6
min
min
min
min
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
kWh
kWh
kWh
kWh
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
60204010 30 80
MR
MR
MR
MR
MEM
MEM
MEM
MEM
PF
PF
PF
PF
MIN
MIN
MIN
MIN
MAX
MAX
MAX
MAX
RS232
CAL
CAL
CAL
CAL
AC
AC
AC
AC
0
20
Time
Time
Time
Time
FREQ
FREQ
FREQ
FREQ
h
h
h
h
V3
V3
V3
V3V1
V1
V1
V1
V2
V2
V2
V2
MAX
MAX
MAX
MAX MIN
MIN
MIN
MIN
4
100
40
Hz
Hz
Hz
Hz
5
7
HOLD
HOLD
HOLD
HOLD
CLEAR
CLEAR
CLEAR
CLEAR
P
P
P
P
OFF
OFF
OFF
OFFMS2203
MS2203
MS2203
MS2203
MR
EX
-
DIGITAL POWER CLAMP
DIGITAL POWER CLAMP
DIGITAL POWER CLAMP
DIGITAL POWER CLAMP
OFF
OFF
OFF
OFF
1
RS232
RS232
RS232
RS232
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
W
Ture RMS
Ture RMS
Ture RMS
Ture RMS
AUTO RAN GE
AUTO RAN GE
AUTO RAN GE
AUTO RAN GE
3
kW / PF
kW / PF
kW / PF
kW / PF
V / Hz
V / Hz
V / Hz
V / Hz
2
A
A
A
A
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
W
W
W
W 3W
W
W
W 321
P
P
P
P
2
3
600kW
600kW
600kW
600kW
MAX
MAX
MAX
MAX
1000A
1000A
1000A
1000A
1
I
I
I
II
I
I
I
600V
600V
600V
600V
CAT.I
CAT.I
CAT.I
CAT.I
MAX
MAX
MAX
MAX
600V
MAX
8
RS232
~
3
3
3
3
OPTICAL INTERFACE

V1 : The input terminal for the first phase, using the yellow test lead
to connect.
V 2: The input terminal for the second phase, using the green test lead to connect.
V3 : The input terminal for the third phase, using the red test lead to
connect.
COM : Common terminal, the earth input terminal for all measure- -ment modes, using the black
test lead to connect.
6. LCD Display
4 digits display, 7 segment LCD to display function mode, measured
value and symbols.
7. Trigger
Press the lever to open the transformer. When the lever is released, the jaws will close again.
8. RS232 C Data Interface
Your clamp meter can use a serial interface cable to communicate with a computer. Refer to
Figure 18 for complete instructions.
Using
Using
Using
Using the
the
the
the Selector
Selector
Selector
Selector
Turn the meter on by rotating the selector to any function as following . (
(
(
( Table
Table
Table
Table 1.
1.
1.
1. Introducing
Introducing
Introducing
Introducing The
The
The
The
Selector
Selector
Selector
Selector )
ITEM
ITEM
ITEM
ITEM DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
OFF POWER
POWER
POWER
POWER OFF.
OFF.
OFF.
OFF. Turn the meter off
EX- P EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL POWER
POWER
POWER
POWER SUPPLY .
SUPPLY .
SUPPLY .
SUPPLY . No use battery, select tested
voltage signal be power supply for Active Energy measure-
-ment for long at one time .
MR RECALL
RECALL
RECALL
RECALL DATA.
DATA.
DATA.
DATA. Recall saved data in the meter memory.
∑WTOTAL
TOTAL
TOTAL
TOTAL POWER.
POWER.
POWER.
POWER. For display total power value of three phase
(
(
(
( Table
Table
Table
Table 1.
1.
1.
1. Introducing
Introducing
Introducing
Introducing The
The
The
The Selector
Selector
Selector
Selector )
)
)
)
ITEM
ITEM
ITEM
ITEM DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
Φ3THIRD
THIRD
THIRD
THIRD MEASUREMENT
MEASUREMENT
MEASUREMENT
MEASUREMENT CHANNEL.
CHANNEL.
CHANNEL.
CHANNEL. For V3 input terminal
measurement
Φ2SECOND
SECOND
SECOND
SECOND MEASUREMENT
MEASUREMENT
MEASUREMENT
MEASUREMENT CHANNEL.
CHANNEL.
CHANNEL.
CHANNEL. For V2 input terminal
measurement
Φ1FIRST
FIRST
FIRST
FIRST MEASUREMENT
MEASUREMENT
MEASUREMENT
MEASUREMENT CHANNEL.
CHANNEL.
CHANNEL.
CHANNEL. For V1 input terminal
measurement
Using
Using
Using
Using the
the
the
the buttons
buttons
buttons
buttons
(
(
(
( Table
Table
Table
Table 2.
2.
2.
2. Function
Function
Function
Function Button
Button
Button
Button )
)
)
)
ITEM
ITEM
ITEM
ITEM DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
1
kW / PF
kW / PF
kW / PF
kW / PF
Active Power, Power Factor Measurement Button.

2
Apparent Power, Reactive Power Measurement
Button.
3
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
Active Energy, Time Measurement Button
4
Power Summation Button
5
V / Hz
V / Hz
V / Hz
V / Hz
Voltage, Frequency Measurement Button
6
A
A
A
A
Current Measurement Button
7
RS232
RS232
RS232
RS232
Data Transmit Button
8
CLEAR
CLEAR
CLEAR
CLEAR
Clear Memory Button
9
Backlight Button
10
MAX
MAX
MAX
MAX
Maximum Value Button/ Previous Record Button
11
MIN
MIN
MIN
MIN
Minimum Value Button / Next Record Button
12
SAVE
SAVE
SAVE
SAVE
Data Save Button
1.
kW / PF
kW / PF
kW / PF
kW / PF
Active Power, Power Factor Measurement Button
Press
kW / PF
kW / PF
kW / PF
kW / PF
button to measure Active Power and Power Factor in measurement mode. Then
the LCD shows Active Power reading in the primary display and Power Factor reading in the
secondary display.
2.
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
Apparent power, Reactive Power measurement button
Press
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
button to measure Apparent Power and Reactive Power in measurement mode.
Then the LCD shows Apparent Power reading in the primary display and Reactive Power
reading in the secondary display.
3.
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
Active Energy, Time Measurement Button
Press
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
button to measure Active Energy in measurement mode. Then the LCD shows
Active Energy reading in the primary display and measurement time of the Active Energy in the
secondary display.
4.Power Summation Button
Press button to sum up the measured value of current one phase in three phase
measurement mode; then measure the second phase and press the button to sum up
again; press the
button for the third phase after you getting the measured
value of the third phase on the display. So the meter will calculate the sum in this three phase
system automatically, you will rotate the selector to ∑W at one time, then the display shows the
total power value.
5.Voltage Measurement Button
Press button to measure voltage of the circuit and display the measured value in the
LCD display.
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
V / Hz
V / Hz
V / Hz
V / Hz
V / Hz
V / Hz
V / Hz
V / Hz

6.
A
A
A
A
Current Measurement Button
Press
A
A
A
A
button to measure current of the circuit and display
the measurement value in the LCD display.
7.
RS232
RS232
RS232
RS232
Data Transmit Button
Press
RS232
RS232
RS232
RS232
button to transmit measured data to a computer by
special interface cable, you can record current measured value and
print reports and data trend curve drawing.
Before press the
RS232
RS232
RS232
RS232
button to transmittal measured data, you
must connect RS232C interface cable to the clamp meter and a computer, the communication
function is working.
8.
CLEAR
CLEAR
CLEAR
CLEAR
Clear Memory Button
Press
CLEAR
CLEAR
CLEAR
CLEAR
button for three seconds to erase all measured data
in the meter memory in the measurement mode.
9. Backlight Button
Press button to turn the backlight on or off. When the back-
-light turned on over five seconds, it will turn off automatically .
10.
MAX
MAX
MAX
MAX
Maximum Value Measurement Button / Previous Record
Button
Press
MAX
MAX
MAX
MAX
button to measure maximum value in measurement
mode. The display shows current maximum value in the secondary
display.
When you turn the selector to MR, press
MAX
MAX
MAX
MAX
button to recall
previous memory location and display the data on the LCD. Once
pressing this button, the clamp meter recalls a memory location
previous current location.
11.
MIN
MIN
MIN
MIN
Minimum Value Measurement Button / Next Record Button
Press
MIN
MIN
MIN
MIN
button to measure minimum value in measurement
mode, the display shows current minimum value in the secondary
display.
–
–
–
–8–
–
–
–
When you turn the selector to MR, press
MIN
MIN
MIN
MIN
button to recall
next memory location and display the data on the LCD. Once
pressing this button, the clamp meter recalls a memory location next
current location.
12.
SAVE
SAVE
SAVE
SAVE
Data Save Button
Press
SAVE
SAVE
SAVE
SAVE
button to save current measured data to the meter in
measured mode. The meter can save 28 groups of measured data into the meter at most.

Lcd
Lcd
Lcd
Lcd Display
Display
Display
Display
( F igure 2 )
1. Dangerous voltage symbol
2. Data holding symbol
3. First phase symbol
4. Second phase symbol
5. Third phase symbol
6. Three phase total power symbol
7. External power supply symbol
8. Battery symbol
9. Voltage unit ( V) , current unit ( A) , Apparent Power unit (kVA )
( For primary display )
10. Active power unit (kW ) 、Active Energy unit (kWh)
11.
4 digit display ( For primary display )
12. Frequency unit
13. Voltage unit ( V) , current unit ( A) , Apparent Power unit (kVA ) ,
Reactive Power unit (kVAr ) ( For secondary display )
1 4 . Time unit : hour(h ) 、minute(min)
1 5. Overflow symbol
1 6. 1 00 graduate scale
17. 40 graduate scale
18. Bar graph
19. 4 digit display ( For secondary display )
20. Frequency unit
21. Time symbol
22. N egative sign of scale
23. Number of memory location symbol
24. Recall data symbol
25. Save data symbol

26. Minimum value symbol
27. Power factor symbol
28. Maximum value symbol
29. RS232 C interface symbol
30. Calibrate symbol
31. Negative symbol
32. AC symbol
33.
33.
33.
33. DC symbol
Making
Making
Making
Making Measurements
Measurements
Measurements
Measurements
M
M
M
M easuring
easuring
easuring
easuring AC
AC
AC
AC V
V
V
V oltage
oltage
oltage
oltage
( Figure 3. Voltage Measurements )
1. Turn the selector to one of Φ1 , Φ2 , Φ3 , refer to Table 3 to connect the test leads to input
terminals: Insert the black test lead into the COM input terminal and one corresponding color
test lead into the corresponding input terminal.( Figure 3 )
(Table
Table
Table
Table 3
3
3
3 Input
Input
Input
Input Terminal
Terminal
Terminal
Terminal Connections
Connections
Connections
Connections )
SELECTOR
SELECTOR
SELECTOR
SELECTOR INPUT
INPUT
INPUT
INPUT TERMINAL
TERMINAL
TERMINAL
TERMINAL (+
+
+
+)INPUT
INPUT
INPUT
INPUT TERMINAL
TERMINAL
TERMINAL
TERMINAL (-
-
-
-)Phase
Phase
Phase
Phase
Φ1 V1 jack Yellow lead COM jack Black lead First phase
Φ2 V2 jack Green lead COM jack Black lead Second phase
Φ3 V3 jack Red lead COM jack Black lead Third phase
2. Connect test leads to the load, press
V / Hz
V / Hz
V / Hz
V / Hz
button, voltage measured value is displayed in
the primary display and current frequency value of voltage is shown in the secondary display.
3. In voltage measurement mode, press
MAX
MAX
MAX
MAX
button, the LCD displays “ MAX “ symbol, then
maximum value(T RMS ) is shown in the secondary display. Press
MAX
MAX
MAX
MAX
button again, the
V
V
V
VAC
AC
AC
AC
MEM
MEM
MEM
MEM
3010 200
FREQ
FREQ
FREQ
FREQ
FREQ
FREQ
FREQ
FREQ
MEM
MEM
MEM
MEM
AC
AC
AC
AC
1
20 40 60 800
40
V1
V1
V1
V1
V3
V3
V3
V3V2
V2
V2
V2
MIN
MIN
MIN
MIN
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
MAX
MAX
MAX
MAX
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
Ture RMS
Ture RMS
Ture RMS
Ture RMS
AC
AC
AC
AC
kW / PF
kW / PF
kW / PF
kW / PF
V / Hz
V / Hz
V / Hz
V / Hz
100
Hz
Hz
Hz
Hz
Hz
Hz
Hz
Hz
V
V
V
V
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
1000A
1000A
1000A
1000A
MEM
MEM
MEM
MEM
1
-
OFF
OFF
OFF
OFF
P
P
P
P
2
1
OFF
OFF
OFF
OFF
HOLD
HOLD
HOLD
HOLD
V
V
V
V
Hz
Hz
Hz
Hz
MAX
MAX
MAX
MAX
I
I
I
I I
I
I
I
CAT.I
CAT.I
CAT.I
CAT.I
600V
600V
600V
600V
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
RS232
RS232
RS232
RS232
CLEAR
CLEAR
CLEAR
CLEAR
10 20 30 40
W
FREQ
FREQ
FREQ
FREQ
3
0
MR
EX
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
A
A
A
A
Yellow
Black
V1
V1
V1
V1
V
AC
Circuit
1

“ MAX ” symbol is disappeared, the secondary display return to current frequency value .
4. Press
MIN
MIN
MIN
MIN
button, the LCD displays “ MIN ” symbol, then minimum value(T RMS ) is shown
in the secondary display. Press
MIN
MIN
MIN
MIN
button again, the “ MIN ” symbol is disappeared, the
secondary display return to current frequency value.
5. For input voltage exceeds 600V , the display will show ” OL ” symbol and the bar graph is
full.( Figure 4 )
(Figure 4. Voltage Exceeds 600V )
6. For input voltage exceeds 30V , the display will show “ ” for safety.
7. There are two modes to show the bar graph in the LCD. You can observe fluctuation range of
measured voltage. The first mode is 0-2 0 -4 0 -6 0 -8 0 -10 0, the second is 0 -1 0 -2 0 -3 0 -4 0 .
Measuring
Measuring
Measuring
Measuring AC
AC
AC
AC Current
Current
Current
Current
( Figure 5. Current Measurements )
1. Turn the selector to one of Φ1 , Φ2 , Φ3 .
2. Press the trigger to hook the clamp jaw around one conductor to be measured. Press
Black
Circuit
Hz
Hz
Hz
Hz
V
V
V
V
MEM
MEM
MEM
MEM
0 80604020
1
FREQ
FREQ
FREQ
FREQ
AC
AC
AC
AC
MAX
MAX
MAX
MAX
V2
V2
V2
V2
100
V1
V1
V1
V1
SAVE
SAVE
SAVE
SAVE
COM
COM
COM
COM
MIN
MIN
MIN
MIN
V3
V3
V3
V3
A
A
A
A
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
EX
3
10
2
P
P
P
P
-
0
MEM
MEM
MEM
MEM
V / Hz
V / Hz
V / Hz
V / Hz
kW / PF
kW / PF
kW / PF
kW / PF
1000A
1000A
1000A
1000A
600kW
600kW
600kW
600kW
MAX
MAX
MAX
MAX
AC
AC
AC
AC
Ture RMS
Ture RMS
Ture RMS
Ture RMS
MR
FREQ
FREQ
FREQ
FREQ
W
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
1
403020
CLEAR
CLEAR
CLEAR
CLEAR
RS232
RS232
RS232
RS232
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
600V
600V
600V
600V
CAT.I
CAT.I
CAT.I
CAT.I
I
I
I
II
I
I
I
MAX
MAX
MAX
MAX
Hz
Hz
Hz
Hz
V
V
V
V
HOLD
HOLD
HOLD
HOLD
OFF
OFF
OFF
OFF
1
OFF
OFF
OFF
OFF
Yellow
AC
V
V1
V1
V1
V1
CLEAR
CLEAR
CLEAR
CLEAR
W
RS232
AC
AC
AC
AC
MEM
MEM
MEM
MEM
3
0 2010
A
A
A
A
4030
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
0
MEM
MEM
MEM
MEM
V / Hz
V / Hz
V / Hz
V / Hz
kW / PF
kW / PF
kW / PF
kW / PF
Ture RMS
Ture RMS
Ture RMS
Ture RMS
AC
AC
AC
AC
RS232
10 20 30
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
A
A
A
A
2
3
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
RS232
RS232
RS232
RS232
1
OFF
OFF
OFF
OFF
3
V1
V1
V1
V1
V2
V2
V2
V2 V3
V3
V3
V3
MIN
MIN
MIN
MIN
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
MR
-EX
OFF
OFF
OFF
OFF
P
P
P
P
1000A
1000A
1000A
1000A
MAX
MAX
MAX
MAX
40
A
A
A
A
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
1
2
3
Earth wire
Tested conductor
CAT.I
CAT.I
CAT.I
CAT.I
I
I
I
I I
I
I
I
HOLD
HOLD
HOLD
HOLD
MAX
MAX
MAX
MAX
600V
600V
600V
600V

A
A
A
A
button, the primary display reading is current value(RMS) of the conductor. ( Figure
5 )
3.
To
measure the maximum value of current, press
MAX
MAX
MAX
MAX
button, the maximum value is
shown in the secondary display. Press
MAX
MAX
MAX
MAX
button again to cancel maximum value
measurement. ( Figure 6 )
4.
To
measure the minimum value of current, press
MIN
MIN
MIN
MIN
button, the minimum value is
shown in the secondary display. Press
MIN
MIN
MIN
MIN
button again to cancel minimum value
measurement.
5. For current exceeds 1000A(RMS), the display will show “ OL ” symbol. ( Figure 7 )
6. There are two modes to show the bar graph. You can observe the fluctuation range of
measured current. The first mode is 0-2 0 -4 0 -6 0 -8 0 -10 0, the second is 0 -1 0 -2 0 -3 0 -4 0 .( Figure
5 and Figure 6 )
( Figure 6. Maximum Value Of Current Measurements )
( Figure7. Current Exceeds 1000A )
80
AC
AC
AC
AC
MEM
MEM
MEM
MEM
MAX
MAX
MAX
MAX
6040200
3
W
100
A
A
A
A
A
A
A
A
100
3
80604020
AC
AC
AC
AC
MEM
MEM
MEM
MEM
0
MAX
MAX
MAX
MAX
A
A
A
A
A
A
A
A
SAVE
SAVE
SAVE
SAVE
COM
COM
COM
COM
MAX
MAX
MAX
MAX MIN
MIN
MIN
MIN
V3
V3
V3
V3V2
V2
V2
V2V1
V1
V1
V1
CLEAR
CLEAR
CLEAR
CLEAR
OFF
OFF
OFF
OFF
1
RS232
RS232
RS232
RS232
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
3
2
A
A
A
A
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
Ture RMS
Ture RMS
Ture RMS
Ture RMS
kW / PF
kW / PF
kW / PF
kW / PF
V / Hz
V / Hz
V / Hz
V / Hz
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
600V
600V
600V
600V
MAX
MAX
MAX
MAX MAX
MAX
MAX
MAX
1000A
1000A
1000A
1000A
HOLD
HOLD
HOLD
HOLD
P
P
P
P
OFF
OFF
OFF
OFF
EX
-
MR
I
I
I
II
I
I
ICAT.I
CAT.I
CAT.I
CAT.I
600kW
600kW
600kW
600kW
Earth wire
Tested conductor
3
2
1
MAX
MAX
MAX
MAX
CAT.I
CAT.I
CAT.I
CAT.I
600V
600V
600V
600V
W
60
AC
AC
AC
AC
MEM
MEM
MEM
MEM
40200
A
A
A
A
10080
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
RS232
RS232
RS232
RS232
CLEAR
CLEAR
CLEAR
CLEAR
A
A
A
A
0
V2
V2
V2
V2 V3
V3
V3
V3
MIN
MIN
MIN
MINMAX
MAX
MAX
MAX
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
A
A
A
A
2
3
1
OFF
OFF
OFF
OFF
3
20 40 60 80 100
V1
V1
V1
V1
kW / PF
kW / PF
kW / PF
kW / PF
AUTO RAN GE
AUTO RAN GE
AUTO RAN GE
AUTO RAN GE
Ture RMS
Ture RMS
Ture RMS
Ture RMS
V / Hz
V / Hz
V / Hz
V / Hz
MEM
MEM
MEM
MEM
AC
AC
AC
AC
RS232
3
MR
-
EX
OFF
OFF
OFF
OFF
P
P
P
P
HOLD
HOLD
HOLD
HOLD
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
1000A
1000A
1000A
1000A
Earth wire
Tested conductor
3
1
2
I
I
I
I I
I
I
I

Measuring
Measuring
Measuring
Measuring Single-Phase
Single-Phase
Single-Phase
Single-Phase Circuit
Circuit
Circuit
Circuit
(Figure 8. Single-phase Power Measurements )
1. Hook the clamp jaws around the conductor of the loading or the circuit. The clamped
conductor is one phase which you want to test in the three-phase circuit.
2. Turn the selector to one of Φ1 , Φ2 , Φ3 , and refer to Table 3 to connect test leads into input
terminals which is corresponding to the position of the selector. ( Figure 8 )
3. After right connection, you can measure five power parameters of single-phase circuit (Active
Power, Power Factor, Apparent Power, Reactive Power, Active Energy):
( 1 . ) Active Power(kW) and Power Factor (PF) (Figure 8 )
a.
a.
a.
a. Press
kW / PF
kW / PF
kW / PF
kW / PF
button, the Active Power value is shown in the primary display and
the Power Factor value, “ PF ” symbol are shown in the secondary display. W hen the
Power Factor value is negative, the loading is capacitive.
b. The maximum measurement range of Active Power is 600 k W . For exceeding the
maximum value, the “ OL ” symbol will be shown in the display. If test voltage
exceeds 600V or the test current exceeds 1000A , the “ OL ” symbol will be shown in
the display too. And the bar graph is full.(Figure 9 ) The minimum input voltage is
20V and the minimum input current is 5 A , if it less than the minimum input voltage
and minimum input current, the Active Power value is “ 0.00k W ” .
c. Press
MAX
MAX
MAX
MAX
button, the maximum value of Active Power is shown in the
secondary display.
d. Press
MIN
MIN
MIN
MIN
button, the minimum value of Active Power is shown in the
secondary display. 。
e. The bar graph “ 0-20-40-60-80-100 ” is shown.
2
0 0
MEM
MEM
MEM
MEM
PF
PF
PF
PF
20
AC
AC
AC
AC
kW
kW
kW
kW
40 60 80 100
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
kW / PF
kW / PF
kW / PF
kW / PF
MIN
MIN
MIN
MIN
6040
V2
V2
V2
V2
2
MAX
MAX
MAX
MAX
20
V1
V1
V1
V1
PF
PF
PF
PF
AC
AC
AC
AC
MEM
MEM
MEM
MEM
0 0
V3
V3
V3
V3
V / Hz
V / Hz
V / Hz
V / Hz
A
A
A
A
RS232
RS232
RS232
RS232
Black
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
10080
kW
kW
kW
kW
CLEAR
CLEAR
CLEAR
CLEAR
Green
Tested conductor
1
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
2
EX
3
-
P
P
P
P
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
W
MR
Ture RMS
Ture RMS
Ture RMS
Ture RMS
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
1000A
1000A
1000A
1000A
HOLD
HOLD
HOLD
HOLD
MAX
MAX
MAX
MAX
I
I
I
I I
I
I
ICAT.I
CAT.I
CAT.I
CAT.I
600V
600V
600V
600V
Earth wire

(Figure 9.Current Exceeds 1000A Or Voltage Exceeds 600V )
( 2 . ) Apparent Power (kVA)and Reactive Power ( kVAr )
a. Press
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
button, the Apparent Power value is shown in the primary display,
Reactive Power value and the bar graph “ 0-2 0 -4 0 -6 0 -8 0 -10 0 ” are shown in the
secondary display. (Figure 1 0 )
(Figure 10.Apparent power measurements )
b. For input voltage less than 20V and input current less than 5A , Apparent Power
value is “ 0 . 00 k
VA
” .
c. Press
MAX
MAX
MAX
MAX
button, the maximum value of Apparent
Power is shown in the secondary display.
d. Press
MIN
MIN
MIN
MIN
button, the minimum value of Apparent
Power is shown in the secondary display.
e. Reactive Power is not direct measuring parameter of power, k VAr
2
= k
VA
2
- k W
2
is a
200 0
MEM
MEM
MEM
MEM
10040 60 80
PF
PF
PF
PF
AC
AC
AC
AC
2
kW
kW
kW
kW
V3
V3
V3
V3V2
V2
V2
V2
MAX
MAX
MAX
MAX
V1
V1
V1
V1
MIN
MIN
MIN
MIN
Black
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
OFF
OFF
OFF
OFF
RS232
RS232
RS232
RS232
EX
3
MR
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
W
Ture RMS
Ture RMS
Ture RMS
Ture RMS
1
OFF
OFF
OFF
OFF
2
-
P
P
P
P
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
1000A
1000A
1000A
1000A
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVArkW / PF
kW / PF
kW / PF
kW / PF
PF
PF
PF
PF
AC
AC
AC
AC
MEM
MEM
MEM
MEM
0 0
V / Hz
V / Hz
V / Hz
V / Hz
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
6040
2
20
A
A
A
A
HOLD
HOLD
HOLD
HOLD
MAX
MAX
MAX
MAX
I
I
I
I I
I
I
I
CAT.I
CAT.I
CAT.I
CAT.I
600V
600V
600V
600V
10080
kW
kW
kW
kW
CLEAR
CLEAR
CLEAR
CLEAR
Green
Earth wire
Tested conductor
3
AC
AC
AC
AC
MEM
MEM
MEM
MEM
200 0 6040 10080
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
CLEAR
CLEAR
CLEAR
CLEAR
60
MIN
MIN
MIN
MIN
80 100
SAVE
SAVE
SAVE
SAVE
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
A
A
A
A
V / Hz
V / Hz
V / Hz
V / Hz
0 0
MEM
MEM
MEM
MEM
AC
AC
AC
AC
20
MAX
MAX
MAX
MAX
3
40
kW / PF
kW / PF
kW / PF
kW / PF
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
RS232
RS232
RS232
RS232
V3
V3
V3
V3
COM
COM
COM
COM
V1
V1
V1
V1
V2
V2
V2
V2
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
OFF
OFF
OFF
OFF
600V
600V
600V
600V
CAT.I
CAT.I
CAT.I
CAT.I
I
I
I
II
I
I
I
MAX
MAX
MAX
MAX
HOLD
HOLD
HOLD
HOLD
1000A
1000A
1000A
1000A
600kW
600kW
600kW
600kW
MAX
MAX
MAX
MAX
Ture RMS
Ture RMS
Ture RMS
Ture RMS
MR
W
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
P
P
P
P
-
3
EX
2
1
OFF
OFF
OFF
OFF
Black
Red
Earth wire
Tested conductor

formula to calculate Reactive Power value. The value is calculated and shown
according to measured voltage, current and Active Power in software.
(3.) Active Energy (kWh) and Time (hmin )
a. In Active Energy measurement mode, voltage signal must be input into V1 and COM
terminal of the clamp meter (Figure 11) , and the selector must be turned to Φ1 .S o
the Active Energy measurement function is valid ,
( Figure11. Active Energy measurements)
b. Press
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
button, starting value of the Active Energy is “ 0 . 000kW h ” and is
shown in the primary display at first, Active Energy measured time and the bar graph
“ 0-2 0- 4 0- 6 0 -8 0 -10 0 ” is shown in the secondary display. For the time is longer, the
measured value of Active Energy is larger. If you need read the Active Energy value
sometime, press the HOLD button, so the measured value display and the display of
the measured time are locked, but the Active Energy measurement is continuing
and timing in the clamp meter. After reading the display, press HOLD button again to
exit date hold and continue to measure, Active Energy value still add up. Active
energy measurement don ’ t stop until select other measurement function.
c. The
MAX
MAX
MAX
MAX
button and
MIN
MIN
MIN
MIN
button is invalid in Active Energy measurement
mode.
d. The maximum value of Active Energy is “ 9999 kWh ” . If Active Energy value exceeds
the maximum value , the display will show “ OL ” symbol.
e. Active energy measurement is viable in single-phase circuit because you only
measure current of one phase at one time, so you can not measure three-phase
Active Energy. If you need measure Active Energy for long during measurement, you
are suggested that you can use EX- P function, the meter will work no using the
battery but test voltage signal as power supply.
3
AC
AC
AC
AC
MEM
MEM
MEM
MEM
40 600 0
20 80 100
kWh
kWh
kWh
kWh
min
min
min
min
h
h
h
h
RS232
RS232
RS232
RS232
40
MAX
MAX
MAX
MAX
20
AC
AC
AC
AC
MEM
MEM
MEM
MEM
0 0
V / Hz
V / Hz
V / Hz
V / Hz
A
A
A
A
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
SAVE
SAVE
SAVE
SAVE
10080
kWh
kWh
kWh
kWh
MIN
MIN
MIN
MIN
60
CLEAR
CLEAR
CLEAR
CLEAR
3
kW / PF
kW / PF
kW / PF
kW / PF
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
V2
V2
V2
V2V1
V1
V1
V1
COM
COM
COM
COM
V3
V3
V3
V3
h
h
h
h
min
min
min
min
Black
Yellow
OFF
OFF
OFF
OFF
1
2
EX
3
-
P
P
P
P
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
W
MR
Ture RMS
Ture RMS
Ture RMS
Ture RMS
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
1000A
1000A
1000A
1000A
HOLD
HOLD
HOLD
HOLD
I
I
I
I
CAT.I
CAT.I
CAT.I
CAT.I
OFF
OFF
OFF
OFF
MAX
MAX
MAX
MAX
I
I
I
I
600V
600V
600V
600V
Earth wire
Tested conductor

NOTE:
NOTE:
NOTE:
NOTE: When
When
When
When you
you
you
you turn
turn
turn
turn the
the
the
the selector
selector
selector
selector to
to
to
to EX
EX
EX
EX -P
P
P
P to
to
to
to measure
measure
measure
measure voltage
voltage
voltage
voltage or
or
or
or power
power
power
power parameter,
parameter,
parameter,
parameter, the
the
the
the
input
input
input
input voltage
voltage
voltage
voltage of
of
of
of V1
V1
V1
V1 jack
jack
jack
jack must
must
must
must less
less
less
less than
than
than
than 250V,
250V,
250V,
250V, otherwise
otherwise
otherwise
otherwise the
the
the
the fuse
fuse
fuse
fuse will
will
will
will be
be
be
be blown.
blown.
blown.
blown.
Measuring
Measuring
Measuring
Measuring Three
Three
Three
Three –
–
–
– Phase
Phase
Phase
Phase Four-Wire
Four-Wire
Four-Wire
Four-Wire Circuit
Circuit
Circuit
Circuit
Three-phase
Three-phase
Three-phase
Three-phase power
power
power
power parameter
parameter
parameter
parameter means
means
means
means total
total
total
total Active
Active
Active
Active Power,
Power,
Power,
Power, total
total
total
total Reactive
Reactive
Reactive
Reactive Power,
Power,
Power,
Power, total
total
total
total
Apparent
Apparent
Apparent
Apparent Power,
Power,
Power,
Power, total
total
total
total Power
Power
Power
Power Factor.
Factor.
Factor.
Factor. The
The
The
The clamp
clamp
clamp
clamp meter
meter
meter
meter can
can
can
can not
not
not
not measure
measure
measure
measure three-phase
three-phase
three-phase
three-phase
Active
Active
Active
Active Energy.
Energy.
Energy.
Energy. The
The
The
The measurement
measurement
measurement
measurement method
method
method
method of
of
of
of three-phase
three-phase
three-phase
three-phase power
power
power
power parameter
parameter
parameter
parameter is
is
is
is that
that
that
that you
you
you
you
measure
measure
measure
measure power
power
power
power parameter
parameter
parameter
parameter of
of
of
of each
each
each
each phase
phase
phase
phase conductor
conductor
conductor
conductor respectively
respectively
respectively
respectively at
at
at
at first,
first,
first,
first, then
then
then
then calculate
calculate
calculate
calculate
three-phase
three-phase
three-phase
three-phase power
power
power
power parameter
parameter
parameter
parameter in
in
in
in the
the
the
the meter.
meter.
meter.
meter. For
For
For
For a
a
a
a balance
balance
balance
balance load,
load,
load,
load, the
the
the
the measured
measured
measured
measured data
data
data
data is
is
is
is
accurate,
accurate,
accurate,
accurate, if
if
if
if power
power
power
power parameter
parameter
parameter
parameter f
f
f
f luctuate
luctuate
luctuate
luctuate s
s
s
s larger,
larger,
larger,
larger, then
then
then
then the
the
the
the error
error
error
error of
of
of
of total
total
total
total power
power
power
power parameter
parameter
parameter
parameter
increases
increases
increases
increases more.
more.
more.
more.
1. Refer to Table 3, connect yellow test lead, green test lead, red test lead to every phase live
wire of the three-phase circuit and V1 jack, V2 jack, V3 jack of the meter respectively, connect
black test lead to zero conductor of the circuit and COM jack of the meter.
2. Turn the selector to Φ1 at first ( to first phase measurement ) , hook the clamp jaw around the
first phase conductor of the tested circuit, press
kW / PF
kW / PF
kW / PF
kW / PF
button to measure Active Power (kW)
and Power Factor (PF). the measured value are shown in the LCD then
press button to sum power parameter of this phase; press
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
button again to
measure Apparent Power and Reactive Power, after the result is shown in the LCD, press
button to sum power parameter of this phase. So power parameter measurement is
completed in the first phase. If you need save the result, you can press
SAVE
SAVE
SAVE
SAVE
button to do
it. ( Figure 12 )
( Figure 12.The First Phase Power Measurements )
AC
AC
AC
AC
MEM
MEM
MEM
MEM
MEM
MEM
MEM
MEM
PF
PF
PF
PF
1
6040200 0
20 60400 0
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
10080
10080
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
20
MAX
MAX
MAX
MAX
1
V2
V2
V2
V2
40 60 80 100
SAVE
SAVE
SAVE
SAVE
COM
COM
COM
COM
MIN
MIN
MIN
MIN
kW
kW
kW
kW
V3
V3
V3
V3
CLEAR
CLEAR
CLEAR
CLEAR
RS232
RS232
RS232
RS232
A
A
A
A
kW / PF
kW / PF
kW / PF
kW / PF
0 0
MEM
MEM
MEM
MEM
AC
AC
AC
AC
PF
PF
PF
PF
V1
V1
V1
V1
V / Hz
V / Hz
V / Hz
V / Hz
AC
AC
AC
AC
1
kW
kW
kW
kW
600V
600V
600V
600V
CAT.I
CAT.I
CAT.I
CAT.I
I
I
I
II
I
I
I
MAX
MAX
MAX
MAX
P
P
P
P
-
3
EX
2
OFF
OFF
OFF
OFF
HOLD
HOLD
HOLD
HOLD
OFF
OFF
OFF
OFF
1
1000A
1000A
1000A
1000A
600kW
600kW
600kW
600kW
MAX
MAX
MAX
MAX
Ture RMS
Ture RMS
Ture RMS
Ture RMS
MR
W
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
Green RedBlack Yellow
Tested conductor
1
2
Earth wire
3

3. Turn the selector to Φ2 (to the second phase measurement), hook the clamp jaw around the second
phase conductor of the tested circuit, press
kW / PF
kW / PF
kW / PF
kW / PF
button and
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
button to measure power
parameter respectively, when measured result is shown every time, you must press button to
sum in turn. The operation is same as the first phase measurement. (Figure 13)
4. Turn the selector to Φ3( to the third phase measurement),hook the clamp jaw around the
third phase conductor of the tested circuit, press
kW / PF
kW / PF
kW / PF
kW / PF
button and
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
button to
measure power
parameter respectively, when measured result is shown every time, you must press
button to sum in turn. The operation is same as the first phase measurement. ( Figure
14)
( Figure 13.The Second Power Measurements )
( Figure 14. The Third Phase Power Measurements )
2
2
AC
AC
AC
AC
0 0
MEM
MEM
MEM
MEM
PF
PF
PF
PF
MEM
MEM
MEM
MEM
0 0
AC
AC
AC
AC
Earth wire
1
2
3
100
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
80604020
10020 806040
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
20
MAX
MAX
MAX
MAX
2
V2
V2
V2
V2
A
A
A
A
kW / PF
kW / PF
kW / PF
kW / PF
0 0
MEM
MEM
MEM
MEM
AC
AC
AC
AC
PF
PF
PF
PF
V1
V1
V1
V1
V / Hz
V / Hz
V / Hz
V / Hz
Black
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
40 60 80 100
SAVE
SAVE
SAVE
SAVE
COM
COM
COM
COM
MIN
MIN
MIN
MIN
kW
kW
kW
kW
V3
V3
V3
V3
CLEAR
CLEAR
CLEAR
CLEARRS23 2
RS232
RS232
RS232
YellowRed
Green
P
P
P
P
kW
kW
kW
kW
-
3
EX
2
1000A
1000A
1000A
1000A
600kW
600kW
600kW
600kW
MAX
MAX
MAX
MAX
Ture RMS
Ture RMS
Ture RMS
Ture RMS
MR
W
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
Tested conductor
600V
600V
600V
600V
CAT.I
CAT.I
CAT.I
CAT.I
I
I
I
II
I
I
I
MAX
MAX
MAX
MAX
OFF
OFF
OFF
OFF
HOLD
HOLD
HOLD
HOLD
OFF
OFF
OFF
OFF
1
MEM
MEM
MEM
MEM
AC
AC
AC
AC
MEM
MEM
MEM
MEM
PF
PF
PF
PF
3
20 40 600 0
40 600
200
80
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
100
80 100
AC
AC
AC
AC
3
kW
kW
kW
kW
Green
3
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
kW / PF
kW / PF
kW / PF
kW / PF
V3
V3
V3
V3
kW
kW
kW
kW
MIN
MIN
MIN
MIN
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
100806040
V1
V1
V1
V1
V2
V2
V2
V2
MAX
MAX
MAX
MAX
PF
PF
PF
PF
AC
AC
AC
AC
MEM
MEM
MEM
MEM
0 200
A
A
A
A
V / Hz
V / Hz
V / Hz
V / Hz
RS232
RS232
RS232
RS232
CLEAR
CLEAR
CLEAR
CLEAR
RedBlack
Yellow
Tested conductor
1
OFF
OFF
OFF
OFF
HOLD
HOLD
HOLD
HOLD
MAX
MAX
MAX
MAX
I
I
I
I I
I
I
I
CAT.I
CAT.I
CAT.I
CAT.I
600V
600V
600V
600V
OFF
OFF
OFF
OFF
AUTO RANG E
AUTO RANG E
AUTO RANG E
AUTO RANG E
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
1000A
1000A
1000A
1000A
2
EX
Ture RMS
Ture RMS
Ture RMS
Ture RMS
W
3
MR
-
P
P
P
P
1
Earth wire
3
2

5. After above every phase measurement, turn the selector to ∑W ,
then the display shows total Active Power value and Power Factor
value of the three-phase load (Figure 15). After display for three seconds, the display
switches to show total Apparent Power value and total Reactive Power value
automatically(Figure 16). The total Apparent Power value is in the primary display and the
total Reactive Power value is in the secondary display. The display switches automatically
every three seconds until you turn the meter to other function.
( Figure15. Total Active Power Of Three-Phase )
( Figure16. Total Apparent Power Of Three-Phase )
Measuring
Measuring
Measuring
Measuring Three-Phase
Three-Phase
Three-Phase
Three-Phase Three-Wire
Three-Wire
Three-Wire
Three-Wire Circuit
Circuit
Circuit
Circuit
In three-phase three-wire circuit, the operation of the selector and function button is same as
the operation in three-phase four-wire circuit except the connection of test leads.(Figure 17)
MEM
MEM
MEM
MEM
AC
AC
AC
AC
PF
PF
PF
PF
3
W321
20 60400 0
10080
kW
kW
kW
kW
kW
kW
kW
kW
PF
PF
PF
PF
123
W
P
P
P
P
-
3
EX
2
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
OFF
OFF
OFF
OFF
HOLD
HOLD
HOLD
HOLD
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
OFF
OFF
OFF
OFF
1
20
MAX
MAX
MAX
MAX
V2
V2
V2
V2
40 60 80 100
SAVE
SAVE
SAVE
SAVE
COM
COM
COM
COM
MIN
MIN
MIN
MIN
kW
kW
kW
kW
V3
V3
V3
V3
3
CLEAR
CLEAR
CLEAR
CLEARRS232
RS232
RS232
RS232
A
A
A
A
Ture RMS
Ture RMS
Ture RMS
Ture RMS
kW / PF
kW / PF
kW / PF
kW / PF
0 0
MEM
MEM
MEM
MEM
AC
AC
AC
AC
PF
PF
PF
PF
V1
V1
V1
V1
V / Hz
V / Hz
V / Hz
V / Hz
MR
W
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
Black Red
Green Yellow
Tested conductor
Earth wire
1
2
3
600V
600V
600V
600V
CAT.I
CAT.I
CAT.I
CAT.I
I
I
I
II
I
I
I
MAX
MAX
MAX
MAX
1000A
1000A
1000A
1000A
600kW
600kW
600kW
600kW
MAX
MAX
MAX
MAX
20
2
AC
AC
AC
AC
0 0
MEM
MEM
MEM
MEM
1
OFF
OFF
OFF
OFF
RS232
RS232
RS232
RS232
MIN
MIN
MIN
MIN
kWh
kWh
kWh
kWh
TIME
TIME
TIME
TIME
W
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
100
40 60 80
3
W
3
W
MR
EX
-
P
P
P
P
A
A
A
A
3
40
V2
V2
V2
V2
MAX
MAX
MAX
MAX
20
1
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
2
3
321
V / Hz
V / Hz
V / Hz
V / Hz
V1
V1
V1
V1
AC
AC
AC
AC
MEM
MEM
MEM
MEM
kW / PF
kW / PF
kW / PF
kW / PF
Ture RMS
Ture RMS
Ture RMS
Ture RMS
PF
PF
PF
PF
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
0 0
Yellow
Black
Red
Green
HOLD
HOLD
HOLD
HOLD
CLEAR
CLEAR
CLEAR
CLEAR
V3
V3
V3
V3
COM
COM
COM
COM
SAVE
SAVE
SAVE
SAVE
1008060
OFF
OFF
OFF
OFF
kVA
kVA
kVA
kVA
kVAr
kVAr
kVAr
kVAr
Earth wire
3
2
1
MAX
MAX
MAX
MAX
600kW
600kW
600kW
600kW
1000A
1000A
1000A
1000A
Tested conductor
MAX
MAX
MAX
MAX
I
I
I
I I
I
I
I
CAT.I
CAT.I
CAT.I
CAT.I
600V
600V
600V
600V

( Figure 17.Power Measurements Of Three-Phase Three-Wire)
Saving
Saving
Saving
Saving Measurement
Measurement
Measurement
Measurement
In measurement mode, you can press
SAVE
SAVE
SAVE
SAVE
button to save the present display to a memory
location. The meter can store 28 groups of measurement date.
When the meter has saved 28 groups of date, you press
SAVE
SAVE
SAVE
SAVE
button to save again, the
display shows “ FUL ” symbol to prompt full memory in the meter now. You must press
CLEAR
CLEAR
CLEAR
CLEAR
button to clear the memory and continue saving new date.
Recalling
Recalling
Recalling
Recalling Memory
Memory
Memory
Memory
If something is saved in the meter memory, use following procedure
to display of a memory location:
1. Turn the selector to MR .
2. The display shows “ MR ” and “ HOLD ” symbol, location number and date in current
memory location.
3. Press
MAX
MAX
MAX
MAX
button and
MIN
MIN
MIN
MIN
button to cycle through memory location.
RS232C
RS232C
RS232C
RS232C Data
Data
Data
Data Interface
Interface
Interface
Interface
Connect RS232C interface cable to the clamp meter as shown in Figure 18, then rotate the
interface cable deasil to lock it in the meter. Connect the other plug of the interface cable to a
serial port of a computer. Then the meter can transmit measured data to computer by the
infrared photoelectricity RS232C interface in real-time mode. If you want to take out the
interface cable from the meter, first you must rotate the cable widdershins to unlock it, then you
can pull out it .
You will install the special data record software into the computer according to README.TEXT
file in SETUP disk. When the meter is in measurement mode, press
RS232
RS232
RS232
RS232
button, you can
record and
print the measured data of the meter in real time mode in the W INDOW S. The software can
40
AC
AC
AC
AC
1
20
MEM
MEM
MEM
MEM
0 0
PF
PF
PF
PF
100
60 80
kW
kW
kW
kW
Tested conductor
Red
HOLD
HOLD
HOLD
HOLD
SAVE
SAVE
SAVE
SAVE
COM
COM
COM
COM
kW
kW
kW
kW
CLEAR
CLEAR
CLEAR
CLEAR
P
P
P
P
-
3
EX
2
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
1
MR
W
Ture RMS
Ture RMS
Ture RMS
Ture RMS
AUTO RANGE
AUTO RANGE
AUTO RANGE
AUTO RANGE
MAX
MAX
MAX
MAX
V2
V2
V2
V2
MIN
MIN
MIN
MIN
V3
V3
V3
V3
80
kVAr
kVAr
kVAr
kVAr
kVA
kVA
kVA
kVA
TIME
TIME
TIME
TIME
kWh
kWh
kWh
kWh
20
1
40 60
RS232
RS232
RS232
RS232
A
A
A
A
0 0
V1
V1
V1
V1
MEM
MEM
MEM
MEM
AC
AC
AC
AC
PF
PF
PF
PF
kW / PF
kW / PF
kW / PF
kW / PF
V / Hz
V / Hz
V / Hz
V / Hz
100
Yellow
Green
3
1000A
1000A
1000A
1000A
600kW
600kW
600kW
600kW
MAX
MAX
MAX
MAX
600V
600V
600V
600V
CAT.I
CAT.I
CAT.I
CAT.I
I
I
I
II
I
I
I
MAX
MAX
MAX
MAX
1
2

record, plot, print data and curve.
( Figure 18. RS232C Interface Cable Connection )
Input
Input
Input
Input Voltage
Voltage
Voltage
Voltage And
And
And
And Current
Current
Current
Current
When the meter is in power measurement mode, if input voltage exceeds 600V (T RMS )or
current exceeds 1000A ( T RMS ), the meter will display “ OL ” symbol, and bar graph is full.
When input voltage exceeds 30V , the “ ” symbol is shown in the display for safety.
Backlight
Backlight
Backlight
Backlight Display
Display
Display
Display
When press button, backlight of LCD display is on. After
lighting for 4 seconds the backlight is self-off.
Sketch
Sketch
Sketch
Sketch Of
Of
Of
Of Safety
Safety
Safety
Safety Holding
Holding
Holding
Holding
Use the wrist-webbing to prevent a accidentally drop as shown in Figure 19.
( Figure 19 )
RS232-C
INTERFACE
INTERFACE
INTERFACE
INTERFACE
OPTICAL
OPTICAL
OPTICAL
OPTICAL
COMPUTER
OPTICAL INTERFACE
3
3
3
3
~
RS232
MAX
600V
IEC1010-1
IEC1010-2-032
600V CAT .III
POLLUTIO N DEG REE 2
WARN ING
OPEN
PLEASE READ MANUAL FO R SAF ETY.TO AVO ID
ELECTRICAL SHOCK NEVER CONNECT THE TEST
LEADS TO THE INPUT JACKS WHICH ARE NO T
FORR ELATED MEASURING AND REMOVE ALL
INPUTS BEFORE OPENING CASE.
BATTE RIES : 4 X 1.5 V SIZE AA

Curve
Curve
Curve
Curve Diagram
Diagram
Diagram
Diagram Of
Of
Of
Of Power
Power
Power
Power
(
(
(
( PF
PF
PF
PF =
=
=
= KW
KW
KW
KW /
/
/
/ KVA
KVA
KVA
KVA )
)
)
)
( Figure 2 0. PF=1)
( Figure 2 1 )
( Figure 22 )
Low
Low
Low
Low Voltage
Voltage
Voltage
Voltage Indication
Indication
Indication
Indication
The " " symbol is shown on the top right of the LCD display, when the batteries is weak, you
need replace new batteries or use the EX- P function of the meter now. Turn the selector to
EX- P , the meter use the measured voltage signal as power supply to work.
But the meter only measure single-phase circuit and can not work in three-phase circuit in this
power source mode.
Replacing
Replacing
Replacing
Replacing Batteries
Batteries
Batteries
Batteries
X
PEAK VALUE
IMAX =14A
ACTIVE POWER
PEAK VALUE OF POWER
180 °
EMAX =141V
+E
+I
+P
-E
-I
-P
90 °
2000W
PEAK VALUE
1000W
POWER
2000W
360 °
180 °
PEAK VALUE
P
45 °
-E
-I
-P
θ
45 °
90 °
θ
45 °
VMAX
+V
+I
+P
X
225 °
270 °
ACTIVE POWER
500W
IMAX
KW= I R
2
360 °
IMAX
+i
θ-E
-I
-P
θ
kW = I R
-i
180 °
2
-V
X
+V
+V
+I
+P
VMAX
P
360 °

WARNING
WARNING
WARNING
WARNING
To
To
To
To avoid
avoid
avoid
avoid electrical
electrical
electrical
electrical shock
shock
shock
shock ,
,
,
, the
the
the
the instrument
instrument
instrument
instrument must
must
must
must be
be
be
be power
power
power
power off
off
off
off and
and
and
and disconnect
disconnect
disconnect
disconnect
the
the
the
the lest
lest
lest
lest leads
leads
leads
leads or
or
or
or any
any
any
any input
input
input
input signals
signals
signals
signals before
before
before
before replacing
replacing
replacing
replacing the
the
the
the batteries.
batteries.
batteries.
batteries. Never
Never
Never
Never use
use
use
use
the
the
the
the instrument
instrument
instrument
instrument unless
unless
unless
unless the
the
the
the back
back
back
back cover
cover
cover
cover of
of
of
of the
the
the
the instrument
instrument
instrument
instrument is
is
is
is fastened
fastened
fastened
fastened
completely.
completely.
completely.
completely. Replace
Replace
Replace
Replace only
only
only
only with
with
with
with same
same
same
same type
type
type
type or
or
or
or rating
rating
rating
rating batteries.
batteries.
batteries.
batteries.
( Figure 23. Open The Battery Cover )
When the LCD displays the “ ” symbol, the batteries must be
replaced to maintain proper operation. Use the following procedure
to replace the batteries:
1. Disconnect test leads from any signals, turn the rotary function switch to OFF, and remove
the test leads from the input terminals.
2.Open the battery cover and remove the battery cover. Because there is a locked design in
the battery cover. Don ’ t force the
battery cover open, otherwise the cover is broken. Refer to Figure 23 for opening it: Insert
a coin into the groove of the battery cover, press the coin down, then open the cover.
3.Remove batteries and replace with new batteries which is the same type or rating.
4.Reinstall the battery cover.
SPECIFICATIONS
SPECIFICATIONS
SPECIFICATIONS
SPECIFICATIONS
AC
AC
AC
AC VOLTAGE
VOLTAGE
VOLTAGE
VOLTAGE RMS
RMS
RMS
RMS
RANGE ACCURACY RESOLUTION INPUT IMPEDANCE
100 V ±(1.2%+5) 0.1V
10 M Ω
(10 Pf SHUNT )300V ±(1.2%+5) 0.1V
600V ±(1.2%+5) 0.1V
Max. Overload Voltage :750V (RMS)
PLEASE RE AD MANUAL F OR SAFETY .TO AVOID
ELECTRICAL SHOCK NEVER CONNECT THE TE ST
LEADS TO THE INPUT JACKS WHICH ARE NOT
FORRE LATED MEASURING AND REMOVE ALL
INPUTS BEFORE O PENING CASE.
BATT ER IE S : 4 X 1.5 V SIZE AA
WARNING
OPEN
600V CAT.III
IEC1010-1
POLLUTION D EGRE E 2
IEC1010-2-032
PLEASE READ MANUAL FOR
ELECTRICAL SHOT
WARNING
OPEN
Coin
Table of contents
Other Mastech Measuring Instrument manuals

Mastech
Mastech MS6701 User manual

Mastech
Mastech MS5900 User manual

Mastech
Mastech MS2109A User manual

Mastech
Mastech MS8221C User manual

Mastech
Mastech MS6900 User manual

Mastech
Mastech MS2140A User manual

Mastech
Mastech MS2015B User manual

Mastech
Mastech MS2025A User manual

Mastech
Mastech MS2030A User manual

Mastech
Mastech MS2015A User manual

Mastech
Mastech MS2208 User manual

Mastech
Mastech MS8238G User manual

Mastech
Mastech MS2102 User manual

Mastech
Mastech MS6508 User manual

Mastech
Mastech MS8239D User manual

Mastech
Mastech MS6580 User manual

Mastech
Mastech MS2016A User manual

Mastech
Mastech MS2108 User manual

Mastech
Mastech MS8212A User manual

Mastech
Mastech MS2203 User manual