
P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproong treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
IMPORTANT: Pre-drill before xing screws.
Step 3
Parts Needed - No.4 QTY 1
- No.5 QTY 2 5
5
4
Place the Left Gable (No.4) and the Plain
Panel (No.5) onto the oor. Secure the
gable to the plain panel at the corner
using 3x50mm screws.
Fix the second Plain Panel (No.5) to the
rst using 3x50mm screws in an
alternating pattern
Do not secure the building to the oor
until the roof is tted.
Position the panels so there is equal
spacing between the oor and cladding
6x50mm Screws
50mm
screw
Pre drill
hole
a
a
a
a
a
a
a
IMPORTANT: Pre-drill before xing screws.
2
3
Step 4
Parts Needed - No.2 QTY 1
- No.3 QTY 1
Place the Window Panel (No.2) and the Right
Gable (No.3) onto the oor, secure at the
corners using 3x50mm screws per corner.
Do not secure the building to the oor until
the roof is tted.
Position the panels so there is equal spacing
between the oor and cladding
6x50mm Screws
50mm
screw
Pre drill
hole
a
a
a
a
a
a
**Please note: the front panels are
interchangable and can be
positioned on either side of the
building. Decide which works best
before assembly**
a
IMPORTANT: Pre-drill before xing screws.
Step 5
Parts Needed - No.1 QTY 1
1
Place the Door panel (No.1) onto
the oor and x at the corner
using 3x50mm screws. Fix the
Door panel to the Window panel
using 3x50mm screws in an
alternating pattern.
Do not secure the building to the
oor until the roof is tted.
Position the panels so there is
equal spacing between the oor
and cladding
6x50mm Screws
50mm
screw
Pre drill
hole
a
a
a
a
a
a
a
IMPORTANT: Pre-drill before xing screws.
Step 6
Parts needed - No.9 QTY 2
Pre drill
hole
30mm
screw
Align the ridge bars (No.9) between
the front and back of the building,
732mm from the gable to the ridge
bar. Secure 2x60mm screws per
Ridge bar, ensuring to go through
the panel framing and into the ridge
bar.
*Ensure the ridge bar is ush with
the top framing of the gable tops.
4x60mm Screws
9
9
732mm 732mm