Contents
1 INSTALLING THE SERIAL BOARD ............................................................................................................................................6
2 MODBUS INTERFACE.................................................................................................................................................................8
2.1 Components required .........................................................................................................................................................8
2.2 Installing the serial interface board.....................................................................................................................................8
2.3 Setting supervisor parameters............................................................................................................................................8
2.3.1 MODBUS RTU ...................................................................................................................................................................8
2.3.2 MODBUS Over IP...............................................................................................................................................................9
2.4 Setting up the supervisor network ......................................................................................................................................9
2.5 Interface database............................................................................................................................................................10
3. BACNET INTERFACE................................................................................................................................................................14
3.1 Components required .......................................................................................................................................................14
3.2 Installing the BACNET system serial interface board.......................................................................................................14
3.3 Setting supervisor parameters..........................................................................................................................................14
3.3.1 BACNET MS/TP ...............................................................................................................................................................14
3.3.2 BACNET Over IP..............................................................................................................................................................15
3.4 Setting up the supervisor network ....................................................................................................................................15
3.5 Interface database............................................................................................................................................................15
3.6 Meaning of variables ........................................................................................................................................................18
3.7 Instructions on configuration of the BACNET TCP/IP board on the PC ...........................................................................19
3.7.1 PC settings .......................................................................................................................................................................19
3.7.2 Starting the BACNET TCP/IP board with the factory settings ..........................................................................................20
3.7.3 Access the BACNET TCP/IP board via the PC ................................................................................................................21
3.7.4 Configuring the board for the BACNET protocol ..............................................................................................................23
4. MITSUBISHI ELECTRIC SYSTEM INTERFACE .......................................................................................................................24
4.1 Components required .......................................................................................................................................................24
4.2 Installing the serial board..................................................................................................................................................25
4.3 Manager3000+ - setting the serial line parameters ..........................................................................................................25
4.4 Setting up the supervisor network ....................................................................................................................................25
5. ANNEXES...................................................................................................................................................................................26
5.1 AWG (American Wire Gauge) conversion table ...............................................................................................................26