Energize/Startup
Procedures
Pre-startup Procedures:
1. Double-check all wiring connections.
Ensure all torque values are met.
See Wiring Data.
2. Inspect the enclosure to ensure no debris or
tools have been left inside.
3. Disconnect all AC loads at the backup (or
critical) load panel.
4. Disconnect the AC input at the source.
De-energize/Shutdown
Procedures
To de-energize or shut down the OutBack Power devices:
1. Turn off (open) the AC circuit breakers.
2. Turn off (open) the DC circuit breakers for the battery.
Wait 5 minutes for the devices to internally discharge themselves.
3. Turn off (open) the PV circuit breakers.
4. Turn off (open) the GFDI circuit breaker.
5. Verify 0 Vdc on the first DC bus of the inverter by placing the
voltmeter leads on and .
6. Verify 0 Vdc on the second DC bus by placing the voltmeter leads on
and .
7. Verify 0 Vdc on one PV circuit by placing the voltmeter leads on
and .
8. Verify 0 Vdc on the other PV circuit by placing the voltmeter leads on
and .
9. Verify 0 Vac on the AC output circuit breakers by placing the
voltmeter leads on and .
900-0159-01-01 REV D
Do not copy or distribute without permission.
1
2
3
4
43
WARNING: Lethal Voltage
Review the system configuration to identify all
possible sources of energy. Ensure ALL
sources of power are disconnected before
performing any installation or maintenance on
this equipment. Confirm that the terminals are
de-energized using a validated voltmeter (rated
for a minimum 1000 Vac and 1000 Vdc) to
verify the de-energized condition.
WARNING: Lethal Voltage
The numbered steps will remove power from
the inverter and charge controllers. However,
sources of energy may still be present inside
the GSLC and other locations. To ensure
absolute safety, disconnect ALL power
connections at the source.
1b 1c
1b
1d
Test points 2c and 2d refer to the
right terminal of each circuit breaker.
2c
1b
2d
1b
WARNING: Burn Hazard
Internal parts can become hot
during operation. Do not
remove the cover during
operation or touch any internal
parts. Be sure to allow them
sufficient time to cool down
before attempting to perform any
maintenance.
Functional
Test Points
Battery Voltage Test Points
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
PV Voltage Test Points
1a 1b 1c 1d
3 4
2a 2b 2c 2d 1b
CAUTION: Fire Hazard
Before energizing, confirm that all hardware
is installed as shown on the Installation
page. Stacking battery terminal hardware in
any other order can overheat the terminals.
Functional
Test Points
Battery Voltage Test Points
GRID IN Voltage Test Points
(Terminal bus bar = TBB)
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
PV Voltage Test Points
GEN IN Voltage Test Points
(Terminal bus bar = TBB)
4
1a 1b
3 4
2c2a 2b 2d 1b
To energize or start the OutBack Power devices:
1. Using a digital voltmeter (DVM), verify 48 Vdc
on the DC input terminals by placing the DVM leads
on and .
Confirm that the battery voltage is correct for the
inverter and charge controller models.
Confirm the polarity.
2. Turn on (close) the GFDI circuit breaker.
3. Verify that the PV input for each charge controller
is in the correct range of open-circuit voltage and
confirm the polarity by:
a) placing the DVM leads on and , and
b) placing the DVM leads on and .
4. Turn on (close) the PV input circuit breakers.
5. Turn on (close) the DC circuit breakers from the battery bank to the inverter.
6. If the inverter is in the Off state, turn it On. (See NOTES.)
7. Turn on (close) the AC output circuit breakers.
8. Verify 230 Vac on the AC OUTPUT TBB by placing the DVM leads on and .
9. Start the generator (if used). Verify 230 Vac on the terminals of the AC input sources.
10. Turn on the AC input feed to the GSLC (if used).
11. Verify 230 Vac on the GRID INTBB by placing the DVM leads on and .
12. Verify 230 Vac on the GEN INTBB by placing the DVM leads on and .
13. Turn on (close) the AC input circuit breakers.
14. Turn on the AC disconnects at the backup (or critical) load panel and test the loads.
1
2
3
4
5
4 3
5 3
6 3
1a 1b
6
CAUTION: Equipment Damage
Incorrect polarity will damage the equipment.
1b2a
1b2b
!
!
NOTES:
For instructions on turning
on the inverter, see the
MATE3s system display
Overview Guide.
If a system display is
not present, the inverter
must be turned off or on
using an external switch
or the J3 jumper. See
the Installation Manual
for more instructions.
If any of these tests do not
function as described, or for
other troubleshooting, see
the Operator’s Manual.
413
In23. 2V0.0A
Out27.6V0.0A
0.000kW0.0kWH
AUX:OFF Sleeping
In23. 2V0.0A
Out27.6V0.0A
0.000kW0.0kWH
AUX:OFF Sleeping
1b
1a
1
2
3
5
3
64 5
2b
2a
6
3 5
3 6
Bypass Interlock
Plate Position Key
The AC bypass allows a source
to power the loads directly.
The Radian inverter can be
shut down for maintenance or
other reasons.
Normal
(bypass plate
down position)
Bypass
(bypass plate
up position)
ON
OFF
OFF
ON
1
2
3
4
1b
1c 1d
2c
2d
4
3