Installation Operation Method 安装操作法
1, Install the material holder, holder (pressing rod) and supporting foot in the position
shown in Photo 1 (auxiliary tool: inner hexagon), and connect the air compressor to the
machine.
将放轴、压杆、撑脚等按图1所示位置安装(辅助具:六),空压机管接机
。
2, Film is mounted on the material holder and material limiter 2 is mounted at the position
shown in Photo 1. (attached to the film)
将膜装上放轴,放限位2安装于图1所示位置(与膜贴合)。
3, Connect the power cord to turn on the power supply, and the film bypasses the holder,
passes through the air outlet pipe and pulls into the traction wheel. Press the IN-material
(Green button), and then press the start button to start inflating the film when the film is
pulled out of the machine.
接上电源线开启电源,膜绕过压杆,穿过出管并拉牵引轮内,按点动进键,待膜
拉机外再按启动键开始吹膜。
4, According to different air column material and size to adjust the air volume, no fixed
criteria, need to adjust and record by yourself.
根据同柱材尺进调整,固定准则,需调整记录。
Attention 注意事项
1, External air compressor is needed for air column machine, and the pressure of air
compressor must be greater than the pressure adjusted on the barometer of air column
machine. If it is found that the continuous increase air pressure the air column is still not
full, check whether the pressure of external air compressor is enough, and the external
air compressor is generally around 5kg/cm².
柱机需外接源,源压必须于柱机压表上所调整的压,如发现持续加
压柱仍饱满,检查外接源压是否够,外接源般在5kg/cm²左右。
2, If it is found that one of the air column bags is occasionally insufficient to inflate or
cannot inflate, please contact the material supplier of the air column bag to check the
bag intake valve.
如发现柱袋偶尔有根柱吹饱或者吹起来请联系柱袋材提供检查袋进
阀。
3, Coiled material inevitably has joints in it, so it can not be off duty for a long time when it
is inflated.
卷难免有接头在内,充时可时间脱岗。
4, Regularly check the blade wear condition, if found raw edge please replace the blade.
定期检查磨损情况,如发现边请换。
Prohibition: Equipment is forbidden to run without material!!!
禁:设备禁缺运!!!