manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Reliance Foundry
  6. •
  7. Outdoor Light
  8. •
  9. Reliance Foundry R-8471 User manual

Reliance Foundry R-8471 User manual

This manual suits for next models

1

Other Reliance Foundry Outdoor Light manuals

Reliance Foundry R-7593 User manual

Reliance Foundry

Reliance Foundry R-7593 User manual

Reliance Foundry R-7593 User manual

Reliance Foundry

Reliance Foundry R-7593 User manual

Reliance Foundry R-7535 User manual

Reliance Foundry

Reliance Foundry R-7535 User manual

Reliance Foundry R-8464 User manual

Reliance Foundry

Reliance Foundry R-8464 User manual

Reliance Foundry R-7593 User manual

Reliance Foundry

Reliance Foundry R-7593 User manual

Reliance Foundry R-7530 User manual

Reliance Foundry

Reliance Foundry R-7530 User manual

Reliance Foundry R-7539 User manual

Reliance Foundry

Reliance Foundry R-7539 User manual

Reliance Foundry Concrete Bollard User manual

Reliance Foundry

Reliance Foundry Concrete Bollard User manual

Reliance Foundry R-7835 User manual

Reliance Foundry

Reliance Foundry R-7835 User manual

Popular Outdoor Light manuals by other brands

Kichler Lighting HELEN 37536 instructions

Kichler Lighting

Kichler Lighting HELEN 37536 instructions

Thorn OXANE L installation instructions

Thorn

Thorn OXANE L installation instructions

esotec Solar Globe Light multicolor 20 operating instructions

esotec

esotec Solar Globe Light multicolor 20 operating instructions

mitzi HL200201 ELLIS Assembly and mounting instructions

mitzi

mitzi HL200201 ELLIS Assembly and mounting instructions

HEPER TILA S AFX 3 Module Installation & maintenance instructions

HEPER

HEPER TILA S AFX 3 Module Installation & maintenance instructions

Designplan TRON 180 installation instructions

Designplan

Designplan TRON 180 installation instructions

Sealey LED37 instructions

Sealey

Sealey LED37 instructions

nordlux VEJERS Mounting instruction

nordlux

nordlux VEJERS Mounting instruction

SImx ELITE LED LHTC637 installation instructions

SImx

SImx ELITE LED LHTC637 installation instructions

GEV CAROLINE 10833 manual

GEV

GEV CAROLINE 10833 manual

WE-EF PFL540 LED Installation and maintenance instructions

WE-EF

WE-EF PFL540 LED Installation and maintenance instructions

HEPER DOGO Side LW6048.585-US Installation & maintenance instructions

HEPER

HEPER DOGO Side LW6048.585-US Installation & maintenance instructions

BEGA 84 253 Installation and technical information

BEGA

BEGA 84 253 Installation and technical information

HEPER LW8034.003-US Installation & maintenance instructions

HEPER

HEPER LW8034.003-US Installation & maintenance instructions

HEPER MINIMO Installation & maintenance instructions

HEPER

HEPER MINIMO Installation & maintenance instructions

LIGMAN BAMBOO 3 installation manual

LIGMAN

LIGMAN BAMBOO 3 installation manual

Maretti TUBE CUBE WALL 14.4998.04 quick start guide

Maretti

Maretti TUBE CUBE WALL 14.4998.04 quick start guide

Maxim Lighting Carriage House VX 40428WGOB installation instructions

Maxim Lighting

Maxim Lighting Carriage House VX 40428WGOB installation instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

1-877-789-3245 | info@reliance-foundry.com | www.reliance-foundry.com
Retractable Bollard Installaon R-8471/R-8472
Parts List
Installaon Equipment
#PART QTY
1Retractable Bollard Assembly 1
2Retractable Bollard Receiver 1
3Key 1
4Reecve Tape 1
Auger Measuring Tape
Level Chalk/Marker
Dirt Tamper
To protect the nish, keep bollards in original
packaging unl exact moment of installaon.
Handle with care to avoid scratching or
damaging bollard surfaces.
Once scratched, bollards cannot be repaired
to original form without re-nishing the enre
surface.
Consider local soil condions before proceeding
with bollard installaon.
Before Installaon
STEP 1: Study the site plans and mark the intended
locaon of each bollard on the plan.
STEP 2: Always check for hazards such as water pipes,
gas lines, and underground wiring before digging.
STEP 3: Dig a hole to a minimum depth of 54". The
diameter of the hole should extend to a minimum of 14".
SECTION AP-AP
SCALE 0.3 : 1
AP
AP
PARTS LIST
DESCRIPTION
PART
NUMBER
QTY
ITEM
R8471
Retract
able
Bollard
Assem
bly
R8471
11
R8471
R
Retract
able
Bollard
Receiv
er
R8471
R
1
2
Option
al
Reflect
ive
Tape,
Max.
1-1/8"
Width
Reflect
ive
Tape
(Optio
nal)
1
3
1
2
4
3
54" min.
14" min.
STEP 4: Center the auger on the installaon mark and
bore a hole to the required depth and diameter.
STEP 5: Ensure the area is properly formed to create a
perimeter that will hold wet concrete. Use a dirt tamper**
to compact the soil below the intended surface.
** Dirt tamping is not required if working on undisturbed soil
1-877-789-3245 | info@reliance-foundry.com | www.reliance-foundry.com
R-8471/R-8472
Retractable Bollard Installaon
Inspect the installaon. Abrasions should be covered
as soon as possible. For damage repair or other
servicing needs, please refer to
hp://www.reliance-foundry.com/wp-content/
uploads/retractable-bollard-service-guide.pdf
STEP 6: Back ll the drilled hole with drain rock so that when
the bollard assembly is placed in the site, the top edge of the
receiver will sit at approximately 1/4" above grade.
Install the Bollard Assembly
STEP 7: Keep the bollard assembly in its protecve packaging.
When ready to install, remove the protecve packaging.
STEP 8: Place the bollard assembly in the center of the
installaon hole. Ensure that the top edge of the receiver sits
at approximately 1/4" above grade. This will allow a slight
berm to be created with concrete.
STEP 9: Extend or raise the bollard from the bollard assembly
to its upright posion. Hold a level against it and ensure that
the bollard is plumb.
STEP 10: Back ll around the receiver up to approximately
18" with the frost line in mind. Fill from the boom tamp to
ensure the bollard is stable and sll plumb.
STEP 11: Turn the key to collapse the bollard back into the
bollard assembly, ensuring not to disrupt the assembly’s
posion. Note: For the R-8471/R-8471-RA models, the key
is used only used for collapsing the bollard into the bollard
assembly. For the R-8472/R-8472-RA models, the key is used
for both extending and collapsing the bollard from the bollard
assembly.
Pour the Concrete
STEP 12: Mix the concrete. Check that the proper rao of
water and concrete mix is used—the concrete should have a
similar texture to moldable clay.
STEP 13: Pour the concrete evenly into the site. The concrete
should be slightly raised towards the top edge of the receiver
to create a slight berm. Avoid disrupng the bollard assembly.
STEP 14: Allow the concrete to cure for a minimum of
2–3 days. Note: Moisture in the environment and cool
temperatures can signicantly slow the process.
1/4"
18"
STEP 9
STEP 8
STEP 10
STEP 13