2. Mechanical Installation
2.1 General Installation Guidelines for Weigh Modules
1. Themountingsurfaceforthebaseandtopplatemustbelevel.Afterinstallation,
the top and bottom plates must be level within ±0.5°. If the mounting surfaces
are not level, then shims and or grout may be used to level the mount.
If possible, check that the module is level when the vessel is fully loaded
because excessive deflections in legs and supporting structures may cause
additionalside forces which greatly affect accuracy. Deflectionof the mount’s
top or base plate due to loading should not exceed ±.5°. Reinforcement of legs
or other support structures may be necessary to correct this. Vessels with long
legsshouldhavecrossbracingappliedbetweenadjacentlegstokeepthemfrom
spreading under load.
2. Compression mounting systems use three, four, or more mounts. More than
eight-module systems should be avoided as even weight distribution becomes
extremelydifficulttoachieve.Theloadoneachmoduleshouldvarybynomore
than 20%. During installation, add shims where necessary to achieve correct
load distribution.
3. Iftheactualloadcellsareusedduringinstallationoftheweighmodule,extreme
care must be taken to prevent overload damage. A tank or hopper weighing
several tons can exert huge forces when dropped only a fraction of an inch.
Dummy load cells can be used during installation.
4. It is crucial that all piping or conduit be hori-
zontal and flexible. If flexible piping is not
used,makesurethedistancefromthevesselto
the first pipe support is 20-30 times the pipe
diameter.In smaller, lower capacity tanks and
hoppers,isolatingtheresultantforcesbecomes
extremely critical. For details, see our Weigh
Modules & Vessel Weighing Systems manual,
PN 43918.
5. Load cells should not be installed in the mod-
ules until all welding is completed. The heat generated from welding current
passing through a load cell can damage the adhesive holding the strain gauge
to the body. If possible, use a dummy load cell when welding to maintain
finished height. If welding is unavoidable after load cell installation, connect
the ground in such a way that the current does not flow through the load cell.
Forexample,if weldingonthe moduletopplate, thegroundmust beconnected
to the vessel, not to the mount base or support structure. Also, protect the load
cell and cable from weld splatter.
6. Whenpossible,useonly“hermeticallysealed”loadcellsinwashdownapplica-
tions. “Environmentally protected” load cells are not suitable for such
applications and will be damaged. If tanks and surrounding equipment are
LEVEL ±0.5°
FLEXIBLE PIPING
J-BOX