
11
4−4.Cautioninthesystemengineering
Unstablepowerandnoisemaycauseerrorofperformanceandalarm.
Forthesystemtousethisunit,itisrequiredtomakedesignbasedonthis
manualdescriptions.
(1)Stablepowerused
Whilethesystemgetsstableatpowerfailure,theexternaloutputandalarmcontactmaybe
onandthecareforitmustbetaken.Insuchcase,usethestandbybatteryortakeanappropriate
actioninthereceiverside.
Supplythefollowingpowertothisunit.
Powervoltage 100〜240VAC,50/60Hz
Powerfailure
tolerancetime
Approx50msec.
(Forpowerfailureof50msec,itre-starts)
Towarrantthecontinuousoperation,installthestandbybattery
outside.
Others
Donotcontactwithpowerinvolvinghighpowerloadandhigh
frequencynoise.
Accordingtorequirement,uselinefilterandseparateitfrom
noisesource.
(2)Designingtoconsiderradiation
Wheninstalltheclosedself-standingcontrolpanel,mountthefansintheupperandlowerpart.
(3)Lightningmeasures
Lightningsurge
Thereistheproblem“Lightning”.Whenmakeoutdoorwiringofcableatfactoryorplantsetcor
whenmakeaparallelwiringinthesameductwiththecableinfromoutdoorevenattheindoor
wiring.Ifthelightningisahugegenerationsource,thecableisareceptionantennaandthereis
thecasethatcableconnectinginstrumentisbroken.Itisimpossibletopreventthegenerationof
lightning.Ifthecableshouldputinmetaltubeorlaidintheunderground,itisimpossibletoprevent
theinductivelightningsurgegeneratingfromthethunder.
Lightning
measures
Thereisnotthecompletecountermeasureforitbutthefollowingmethodcanbeconsidered.
Makethesuitabletreatmentaccordingly.
a) Thetransmissionsignalrouteisarrangedforconnectionbytheopticalfibercableetc.
b) Countermeasurebythelightingarrester(Cablesafetyretainer).Thereisthewaytoinstall
the lightning arrester just before the field apparatus and the central control station. The
positionofthelightningarresterinstallationisateachpointofcablelaidoutfromtheoutdoor
totheindoor.Thelightningarresterbuildsinthecircuittoremovethesurgevoltagetobethe
sourceforthedamageoffieldapparatus(Protectionresistor,zerodiodeetc.)andisdesigned
toprotecttheapparatus.Butasthesignalmaybeattenuatedduetothelightningarrester,
checktheactionanditisrequiredtouse.
Grounding Surgenoiseshallbegeneratedfromthethunderlightningorexceptit.
Toprotectdetectorfromthesecause,besuretomakegrounding.
*Inthelightningrod,thereisthecircuittoremovethesurgevoltagetobeacauseofdamage
fromfieldinstruments.
Byinstallingthelightningrod,thesignalmaybeattenuated. Wheninstallthelightningrod,it
isrequiredtochecktheperformanceinadvance.
CAUTION