4
1. RECEIVING THE EQUIPMENT
The spa should reach its destination in its original packaging. Medidas
de embalaje son: 1920/1920/1310 mm. Once the packaging has
been removed, check the spa fully before it is installed and report
any anomaly.
Do not lift the spa using the filter equipment or the pipes.
Do not stand the spa on its edge. Always stand it on its legs.
During the installation, check that the interior of the spa is protected
by the covering included with the equipment.
The electrical installation and pipe connections must be carried out
by authorised installers.
2. PREPARING THE PLACE FOR THE INSTALLATION
The Broadway Round spa can function indoors and outdoors. It must
be installed on a firm base to prevent it from sinking.
When choosing the location for the spa, a series of requirements
must be taken into account:
- If you have decided to install the spa indoors, bear in mind the
thoroughfares required for transporting it to its final location.
- Proper electrical supply and ensured efficiency of the electrical
connection in respect of the equipment - for standard equip-
ment the rated power consumption is ab 6,1 kW, 230V AC 50 Hz
(3x4 mm2) with regard to the safety of the users, in all cases the supply
cable must be protected by means of a differential-current switch
with the standard rated switch off current of 30 mA).
- An earth connection compliant with current legislation is essential.
- Access to interior components through the side panels for post-
installation maintenance.
- You must also bear in mind how you are going to fill and empty
the spa. The floor must be level.
- There must be adequate ventilation in closed interior locations.
- You must bear in mind the materials used on the wall and ceilings,
since the humidity generated by the spa requires steam-resistant
materials.
- Due to unavoidable splashing, the floor must be highly-resistant
to water, such as tiles or plastic coverings. If carpets are used, they
must be treated to avoid bacteria from damp. Use special sailing
carpets or rugs. Parquet or wooden floors are not advisable unless
they have been duly treated for this kind of use, such as wood for
gardens or outdoor buildings. In any case, make sure that the floor
has a gradient of 2% towards a drain installed in the room.
3. POSITIONING THE SPA
-When installing the spa in a corner or next to a side wall, remember
to leave 0.5 metres or connection or installation work or fit trap doors
with a minimum size of 1700x700 mm for accessing all the sides for
post-installation maintenance.
In order to ensure proper operation conditions, the floor should be
very well levelled. All the bath legs should be on a solid and hard
surface. The total weight of the bath with water and four people is
about 1450 kg. The weight of the bath should be equally spread over
the 11 bath legs. The surface load is 582 kg/m2.
- This spa cannot be embedded. Do not obstruct access to the side
panels.
1765
1580
660
600
260
440
STANDARD
SETHEAT
4. ELECTRICAL CONNECTIONS
Broadway Round SPA requires at most ca. 6,1 kW of power. In both
cases, the minimum cross-section of the cord should be at least
3x4 mm2. In the case of tubs installed outdoors, a cord with insulation
resistant to deterioration caused by weather conditions is required.
Protect the cord against mechanical damage. If the insulation or
cord is damaged, always replace it due to the risk of electric shock.
For 3x4 mm2cords, protect the tub’s power cord with a C-type
residual current device and a trigger current of 32 A. For safety
reasons, always connect the tub’s power cord to the mains using
an electrical connection protected by a residual current device with
a rated cut-off current of 30 mA. It is recommended to check the
residual current device periodically, according to the guidelines for
testing and resetting such devices.
The SPA tub should be connected to the building’s electrical wiring
permanently. The electrical wiring should be equipped with the
appropriate manual cut-off mechanism, enabling the opening of
contacts on each power supply pole. In addition, equipotential
bondings must be made using the clamp located on the tub
support frame. The minimum cross-section of the equalizer power
cord is 4 mm2.