1
2
3
6
9
Before assembly
•We recommend that time is taken to
read the instructions before starting
assembly, then follow the easy step by
step guide. The instruction sheet is only
a guide to the assembly.
Certain items may not be shown
to scale.
•Check all components prior to assembly
•This product should be assembled
by no less than two people
•Drill all components where indicated
x 2 pre-drill
5
4
7
11
8
Recommended tools for assembly
•Cross head screw driver
•Hammer
•Saw
•Sharp knife
•Drill and 3mm drill bit
Large Dog Kennel
Assembly Instructions
English SS293B
No. Components Qty.
1Floor 1
2Front panel 1
3Right-hand side panel 1
4Left-hand side panel 1
5Back panel 1
6Lid 1
7Lid stay 1
8Roof felt 1
9Side bargeboard 2
10 Front/back bargeboard 2
No. Fixing Kit Qty.
11 T-hinges 2
12 50mm screws 9
13 40mm screws 14
14 25mm screws 14
15 30mm nails 18
16 10mm felt nails 50
Important Note:
This kennel does not come with a pre cut
door way. The assembler must cut the
door way into either the front panel or
right-hand side panel before assembly.
Drill pilot holes
with a 3mm drill
bit for each screw
in this section.
3mm
Drill
40mm
40mm
40mm
6. Secure walls to floor
Secure the front and back panels to the floor using 4 x 40mm screws for each. screw through the shiplap of the panels
into the floor bearer. Secure each end panel using 3 x 40mm screws. screw through the shiplap into the ends of each
floor bearer.
30mm
30mm
30mm
30mm
7.Bargeboard
Attach the side bargeboards to each side of the lid using 4 x 30mm nails for each board. Then fit the front and rear
bargeboards using 5 x 30mm nails for each board.
Important information
Shiplap buildings come ready stained but this is only a preparatory treatment. To VALIDATE the guarantee, the building must be properly
treated with a recognised external wood preserver WITHIN 3 MONTHS of assembly and RE-TREATED ANNUALLY thereafter.
Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building. Placing the
building on a concrete pad or slab base is acceptable provided that the building is not allowed to sit in pooled water during wet conditions.
If the building is to sit on soil or grass it MUST be erected on pressure treated wooden 50mm x 50mm or similar bearers (These are
not supplied in the kit). Rowlinson Garden Products recommend using pressure treated bearers with all buildings on any type of base.
Timber Information.
As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry
spells the material may lose some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain
there will be a certain amount of swelling throughout the wooden panels. This process can not be avoided. If you have problems with
certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the building or the amount of air passing over the
building. During hot spells spray water directly onto the panels with the aid of a garden hose.
If in doubt of any aspect regarding the assembly, use or safety of your building please contact us:
Help Line: (Normal Office Hours) 01829 261 121
Email: support@rowgar.co.uk
ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane
Wardle Nr. Nantwich
Cheshire
CW5 6BN
www.rowgar.co.uk
10
2015 © Rowlinson Garden Products Ltd
We constantly improve the quality of our products, occasionally
the components may differ from the components shown and are
only correct at time of printing. We reserve the right to change the
specification of our products without prior notice.