6
Proceed to glue the nubs of the three main vertical girders (E 1-2) and (F) into the
slots of the floor slab (A). All that is needed for a proper sturdy assembly is some
glue where any two parts touch each other. The lugs that fit into the slots stop any
movement, but the glue holds all the parts together. The girders must therefore have
glue at the bottom where the girders touch the floor slab (only a little bit of glue is
required) and where they touch each other. Gently press down on the girders to
ensure a snug fit. Ensure that all the girders are plumb and square before the glue
fully sets.
Proceed to glue the seat supports (K 1-2) into the corresponding slots near the back
of the floor slab (A). Next the nubs of the 8 combination-back rests (M 1-8) and the
39 individual backrests (N 1-39) can be glued into the slots of the seats (G 1-4).
Press down firmly on the backrests to ensure a snug fit. Now the seats (G 1-4) with
the backrests can be glued to the two supports (K 1-2) and the girders (E 1-2).
Access to the pavilion is from the back via a staircase. This staircase is free
standing. Proceed to glue the nubs on the one side of the 13 steps (Q 1-13) into the
slots of one of the sides (J 1-2). Next, you can consider to fit all the lugs on the other
end of the treads loosely into the corresponding slots of the second side (J 1-2)
without applying any glue. It should now be easy to remove one after the other nub,
glue it and replace it and then move on to the next one. It is advised to start from
one end and work your way to the other end by matching lugs and slots one by one,
almost like closing a zipper tooth by tooth. Once all the lugs are snugly into their
matching slots, it is time to apply some gentle pressure on the top side of the
assembly to ensure a snug fit. At this stage, before the glue sets, it is important to
assure that the whole step ladder is aligned and as square as possible.
Next the safety railing around the front of the stand can be assembled. Start by
gluing the nubs of the 16 posts (R 1-16), into the slots in the floor slab (A). Proceed
to glue the eight straight horizontal beams (H 1-8) into the slots of the posts. Four of
these fit onto the three posts at the left rear side and four onto the three posts at the
right rear side of the floor slab. The railing is on the outside of the posts. Next 4 of
the curved railings (H 1-8) can be glued to the five posts on the left side of the floor
and the other 4 curved railings (H 1-8) can be glued to the five posts on the right side
of the floor. These railing are also on the outside of the posts.
The roof (D) has a slot at the back that fits over the girder (F). The roof can be glued
where it makes contact with the girder or it can stay loose.
Lastly there is a billboard (L) that fits onto the back of girder (F) to hide the nubs from
sight. NOTE: If you are going to use the artwork supplied this billboard should not be
glued on.
With that the assembly of the pavilion is completed.