
6/248
Building Technologies Division Basic Documentation LMV36... CC1P7544en
Infrastructure & Citiies Sector Contents 25.09.2013
4.5.1 Terminal output Inputs...................................................................................37
4.5.2 Terminal output Outputs ................................................................................37
4.5.3 Cable lengths.................................................................................................38
4.5.4 Cross-sectional areas ....................................................................................38
4.5.5 Electrical connections of actuators ................................................................38
4.5.6 Environmental conditions...............................................................................38
5Dimensions...................................................................................................39
5.1 LMV36............................................................................................................39
5.2 AGM60...........................................................................................................40
6Display and diagnostics..............................................................................41
7Basic unit......................................................................................................42
7.1 Description of inputs and outputs...................................................................42
7.2 Flame detectors .............................................................................................43
7.2.1 Loss of flame..................................................................................................44
7.2.2 Extraneous light .............................................................................................44
7.2.3 No flame at the end of safety time (TSA).......................................................45
7.2.4 Flame intensity...............................................................................................45
7.2.5 Supervision of flame detector ........................................................................45
7.3 Digital inputs ..................................................................................................46
7.3.1 Safety loop X3–04 (optional pressure switch-max (Pmax)), pin 1 and 2 .......46
7.3.2 (Burner flange) X3–03, pin 1 and 2................................................................47
7.3.3 Input for external controller (ON / OFF) X5–03, pin 1....................................47
7.3.4 Air pressure switch (APS) X3–02...................................................................48
7.3.5 Gas pressure switch for gas valve proving (P LT) X9-04...............................49
7.3.6 Gas pressure switch-min (Pmin), start release gas X5–01............................50
7.3.7 Oil pressure switch-min (Pmin) X9-04 (X5–01 on AGM60...) ........................51
7.3.8 Setting the time for checking the pressure switch..........................................52
7.3.9 Gas / oil pressure switch-max (Pmax) / or POC contact, start release
oil X5–02........................................................................................................53
7.3.10 Fuel selection.................................................................................................56
7.3.11 Reset X8-04, pin 1 .........................................................................................56
7.4 Digital outputs ................................................................................................57
7.4.1 Output alarm type No-SI X3–05 pin 2 ............................................................57
7.4.2 Fan motor contactor type SI X3–05, pin 1 .....................................................57
7.4.3 Fan continuous purging X3–05, pin 3 ............................................................57
7.4.4 Output ignition (Z) type SI (IGNITION) X4–02 ...............................................58
7.4.5 Outputs fuel valves type SI (V1...V3 / PV) X8–02, X7-01, X7-02...................59
7.4.6 Output safety valve (SV) type SI X6–03 / magnetic clutch ............................61
7.4.7 Output for indication of operation X8-04 pin 2 ...............................................61
7.5 Program sequence.........................................................................................62
7.5.1 Time parameters............................................................................................62
7.5.2 Valve proving .................................................................................................64
7.5.3 Valve proving with separate pressure switch (P LT) X9-04 ...........................65
7.5.4 Valve proving via gas pressure switch-min X5-01 .........................................66
7.5.4.1. Lockout phase (phase 00) .............................................................................66
7.5.4.2. Safety phase (phase 02)................................................................................67
7.5.5 Special functions during the program sequence............................................68
7.5.5.1. Reset / manual lockout ..................................................................................68