
Table of contents
Table of contents
1 About this document ............................... 5
1.1 Target groups ................................. 5
1.2 Other applicable documents ................ 5
1.3 Warnings and symbols ....................... 6
2 General safety instructions ....................... 7
2.1 Intended use .................................. 7
2.2 General safety instructions .................. 8
2.2.1 Product safety ................................ 8
2.2.2 Obligations of the operating company ...... 8
2.2.3 Obligations of personnel ..................... 8
2.3 Specific hazards .............................. 9
2.3.1 Hazardous pumped liquids .................. 9
2.3.2 Potentially explosive atmospheres ... ....... 9
3 Layout and Function ............................... 10
3.1 Marking ....................................... 10
3.1.1 Name plate ................................... 10
3.1.2 ATEX type plate .............................. 10
3.1.3 Pump type code .............................. 11
3.1.4 – Mechanical seal type code ................ 11
3.2 Description .................................... 12
3.2.1 NX /BX pump ................................. 12
3.2.2 NX / BX ATEX pump ......................... 12
3.3 Assembly ..................................... 13
3.3.1 NX ............................................. 13
3.3.2 BX ............................................. 14
3.4 Shaft seals .................................... 15
3.4.1 Single-acting STÜBBE PTFE bellows-type
mechanical seal .............................. 15
3.4.2 Single-acting STÜBBE mechanical seal, type
UV2 ........................................... 17
3.4.3 Double-acting STÜBBE mechanical seal,
type UV3 / Metax G-SBA .................... 17
4 Transport, Storage and Disposal ................. 18
4.1 Transport ...................................... 18
4.1.1 Unpacking and inspection on delivery ...... 18
4.1.2 Lifting .......................................... 18
4.2 Storage ....................................... 19
4.3 Disposal ....................................... 19
5 Installation and connection ....................... 20
5.1 Preparing for installation ..................... 20
5.1.1 Check operating conditions ................. 20
5.1.2 Preparing the installation site ............... 20
5.1.3 Prepare foundation and surface ............ 20
5.2 Installing with foundation .................... 20
5.2.1 Place pump unit on the foundation ......... 20
5.2.2 Attaching pump unit .......................... 21
5.3 Installing without foundation ................. 21
5.4 Planning the electrical system .............. 22
5.5 Connecting the NX pump .................... 22
5.5.1 Preparing the connection (NX) .............. 22
5.5.2 Installing motor (NX) ......................... 22
5.5.3 Installing the coupling guard (NX) .......... 22
5.5.4 Making the electrical connections to the
motor (NX) .................................... 23
5.5.5 Check direction of rotation (NX) ............. 23
5.5.6 Removing the coupling guard (NX) ..... .... 24
5.5.7 Install the coupling (NX) ..................... 24
5.5.8 Align the motor (NX) ......................... 24
5.5.9 Aligning the coupling precisely (NX) ... .. .. . 25
5.5.10 Complete the connection (NX) .............. 25
5.6 Connecting the BX pump .................... 25
5.6.1 Preparing the connection (BX) .............. 25
5.6.2 Dismantle the motor and the motor-side
coupling (BX) ................................. 25
5.6.3 Make the electrical connections to the motor
(BX) ........................................... 26
5.6.4 Check direction of rotation (BX) ............. 26
5.6.5 Install the coupling (BX) ..................... 27
5.6.6 Installing motor (BX) ......................... 27
5.6.7 Complete the connection (BX) .............. 27
5.7 Planning pipelines ............................ 27
5.7.1 Specifying supports and flange
connections ................................... 27
5.7.2 Specifying nominal widths ................... 28
5.7.3 Specifying pipe lengths ...................... 28
5.7.4 Provide self-priming container .............. 28
5.7.5 Optimizing changes of cross section and
direction ....................................... 28
5.7.6 Planning expansion joints ................... 28
5.7.7 Planning a non-return valve ................. 28
5.7.8 Planning venting facilities and pressure
gauges ....................................... 28
5.7.9 Discharging leaks ............................ 29
5.7.10 Providing safety and control devices
(recommended) .............................. 29
5.8 Connecting the pipes ........................ 29
5.8.1 Keeping the piping clean .................... 29
5.8.2 Installing auxiliary pipes ..................... 29
5.8.3 Installing the suction pipework .............. 30
5.8.4 Installing the pressure pipe .................. 30
5.8.5 Inspection for stress-free pipe
connections ................................... 30
5.9 Performing the hydrostatic test .............. 30
6Operation ............................................ 31
6.1 Preparing for commissioning ................ 31
6.1.1 Check downtimes ............................ 31
6.1.2 Lubricate an oil-lubricated pump with
oil .............................................. 31
6.1.3 Filling and bleeding .......................... 31
6.1.4 Preparing auxiliary systems (if
present) ....................................... 31
6.2 Commissioning ............................... 31
6.2.1 Switching on .................................. 31
6.2.2 Switching off .................................. 32
6.3 Shutting down the pump ..................... 32
2 NX / BX BA-2019.04.17 EN 300 785