Stonehealth DOFF III User manual

ORIGINAL INSTRUCTIONS 1
ORIGINAL INSTRUCTIONS
SUPERHEATED WATER / STEAM CLEANING SYSTEM
USER
GUIDE

ORIGINAL INSTRUCTIONS 2
INDEX
3Safety informa on
7Site Requirements
4Safety Informa on Checklist
8Quick Setup Guide
5Specifi ca on
14 Rou ne Maintenance
15 DOFFIII Remote Control
15 DOFFIII Control Screen
16 DOFFIII Smart Technology
6Checklist of Parts Required
17 Declara on of Conformity

ORIGINAL INSTRUCTIONS 3
Safety Informa on
CONSIDERATIONS WHEN USING THE DOFFIII SYSTEM
Only Stonehealth inducted and authorised operators may use the equipment. A nominated person
adjacent, other than the Operator, should be aware of how to safely shut down the system in
unforeseen circumstances. Whilst personnel working in the vicinity need not be inducted into the
working of the system, they should be made aware of the poten al hazards – heat, ven la on, the
temperature of metal/rubber components etc.
DOFFIII with arrows iden fying the loca on of
the Water Outlet and Water Inlet valves.
Symbols in this sec on are displayed in
accordance with CE requirements.
Water outlet
Water inlet
Emergency stop
Safety valve
(behind protec ve panel)
Manual pressure relief
(located between the wheel
and the frame)
Overload reset x2
(side of control box)
DOFFIII Control Panel with arrows iden fying
the loca on of the Overload Reset and the
Emergency Stop.
DOFFIII with arrows iden fying the loca on of
the Pressure Relief and Safety Valve.

ORIGINAL INSTRUCTIONS 4
Safety Informa on Checklist
Equipment should be placed in a well ven lated area away from fl ammable materials.
The exhaust must not be covered or obscured.
The normal fuel for the DOFFIII is light gas oil or motor vehicle diesel (white diesel), or (28
second) domes c central hea ng oil. Never Petrol, Gasoline or Spirit Fuels!
Visually check all equipment before use, if damage is noted the equipment should not be used.
Maintain access of an appropriate fi re ex nguisher.
Switch off equipment when not a ended.
Use only extension cables and hoses provided with the equipment.
The plug must be accessible in case of an emergency.
Acid Descaler supplied with product should be handled with care: see product Health & Safety
Data Sheet.
It may be required to make use of a generator supply. The capacity of the generator should
ideally be 3KVA (cont).
The DOFFIII system is manufactured to ‘CE’ requirements. Any interference or modifi ca on to
the product may render the ‘CE’ mark and any warranty null and void.
In the event of accident or breakdown: Release the trigger, operate the emergency stop, switch
off the pump and disconnect electrical supply.
The equipment is available as standard in 110Volt 50Hz (60Hz to order) and must only be
connected to an appropriate supply.
Whilst Stonehealth have made every eff ort to give appropriate general guidance the equipment
must comply with and be used in accordance with any regula on appropriate to the site on which it
is in use.

ORIGINAL INSTRUCTIONS 5
Specifi ca on
110VVoltage
74KWHeater Output
100 BarRated Pressure
16ACurrent
50Hz
(or local requirement for interna onal market)
Frequency
1400WHotbox
POWER CONSUMPTION
MASS
127.5KgHotbox
5L/minFlow Rate
150 Degrees CRated Temp
X5IP Ra ng
Noise level at operator posi on is 77 +-2dB.
Ambient temperature range for opera on
and storage is 5 Degrees C to 40 Degrees C.
(or local requirement for interna onal market)
POWER CONSUMPTION

ORIGINAL INSTRUCTIONS
6
Contaminated fuel and inadequate electrical or
water supplies cause the majority of all failures.
Site Requirements
YOU WILL NEED:
Clean, cold water supply with a posi ve pressure. Approximately 10 Litres per minute fl ow
Suitable PPE for the task being performed
110 volt 50hz/60hz AC 16 Amp supply
Clean uncontaminated fuel – Diesel, Paraffi n, Kerosene, Hea ng Oil
NEVER PETROL OR GASOLINE
Or 3KVA (cont) Generator 110 volt as above

ORIGINAL INSTRUCTIONS 7
Hotbox
DOFFIII lance x2
DOFFIII extension hose
25 litres of DOFFIII descaler
Remote
DOFFIII hose
Jerry can x2
DOFFIII Trigger
De-scaler hose
Transformer 110V
Extension cable 4
5
6
7
8
9
10
1
2
3
Checklist of Parts Required
5
6
11
1
2
3
4
7
8
9
10
11
DOFFIII extension hose
6

ORIGINAL INSTRUCTIONS 8
Quick Setup Guide
Please note that the Transformer is for 110V
systems only.
Using the DOFFIII Extension Cable (4), connect power supply to the DOFFIII.
2
Connect a water supply to the DOFFIII Water Inlet.
1
4

ORIGINAL INSTRUCTIONS 9
Quick Setup Guide
Connect the DOFFIII Trigger (7) to the other end of the DOFFIII Hose (5).
4
Connect the DOFFIII Hose (5) to the water outlet.
3
5
5
7

ORIGINAL INSTRUCTIONS 10
Quick Setup Guide
To power up the DOFFIII, pull out emergency stop bu on out fully, then press the ON/OFF bu on.
6
Connect the fuel connectors to the DOFFIII Jerry Can. Always use clean, uncontaminated
fuel – Diesel, Paraffi n, Kerosene, Hea ng Oil. NEVER PETROL OR GASOLINE
5
9

ORIGINAL INSTRUCTIONS 11
Quick Setup Guide
8
Connect the DOFFIII Trigger (7) to Lance (8). Follow the on-screen instruc ons to adjust DOFFIII
pressure and temperature. To change output pressure, adjust pressure knob.
Press the run bu on and pull the DOFFIII Trigger, wait for the water to run clear.
7
7
8

ORIGINAL INSTRUCTIONS 12
10
Quick Setup Guide
In hard water areas, the DOFFIII will require descaling. Add 1L of the DOFFIII Descaling (11)
solu on to 10L of water. Use the menu of the DOFFIII control panel to select ‘Descale Mode’.
9
The DOFFIII Remote Control is designed to operate up to 50 meters from the system. Press
bu on 1 to switch on the system and bu on 2 to cool the system and switch it off .
11

ORIGINAL INSTRUCTIONS 13
Quick Setup Guide
Avoid frequent ON/OFF of the switch and trigger.
12
11
Connect the Descale Hose (10) and place the other end of the Hose into a bucket.
Always remove the Lance (8) before descaling. Pull the DOFFIII Trigger over the bucket to descale.
10

ORIGINAL INSTRUCTIONS 14
DOFFIII Remote Control
The DOFFIII Remote Control is
designed to operate up to 50 meters
from the system. Simply press bu on
1 to switch on the system and bu on
2 to cool the system and switch it off .
If the DOFFIII is operated with the
remote control, it will remember its
last preset temperature and pressure.
The remote controller requires 3x AAA
ba eries which are included.
FUNCTIONS Start-up or
Shutdown from up to
50M
1
Single Operator
USE
2
Giving you
FLEXIBILITY
3
NEW FEATURE
NEW FEATURE
Control Screen
FUNCTIONS
Use the Le / Right / and Select bu ons to
navigate the menus within the system.
Power up
and Power down
1
Ac vate
descaling mode
3
Monitor running
Temperature and Pressure
2
Change language
4
The screen is a HTT
Graphic LCD, An -glare
display module.
5

ORIGINAL INSTRUCTIONS 15
Smart Technology
LOW FUEL WARNING
Visual and audible warnings are provided to the operator of low fuel level; it will also warn
if a blockage is detected in the fuel system.
AUTO FLUSH
The DOFFIII will fl ush itself on start up before the boiler engages to avoid system blockages.
DESCALE ASSIST
Within the main menu the operator can select descale which will automa cally take them
through the descale process by following the on-screen instruc ons and prompts.
UNDER/OVER PRESSURE ALERT
If low pressure is detected in the system the operator will receive a visual warning.
If overpressure is detected the system will shut down and require restar ng a er the
system is made safe.
2
3
4
5
The DOFFIII has many built in features to protect the operator and the system such as over-
heat, over-pressure and service status. It also has a mode to assist the operator with the Descale
procedure within the main menu.
1
NEW FEATURE
OVERHEAT PROTECTION
If for any reason the DOFFIII was in an overheat situa on the machine will automa cally cool
itself down and provide the operator with a visual warning, the DOFFIII will also give an audible
warning to the operator if a set amount of me elapses without pulling the trigger (only when at
opera ng temperature).
Under/Over
PRESSURE
ALERT
5
Descale
ASSIST
2
Overheat
PROTECTION
1
Auto
FLUSH
4
Low Fuel
WARNING
3

ORIGINAL INSTRUCTIONS 16
Rou ne Maintenance
Always fl ush system through COLD WITHOUT LANCE ON TRIGGER UNIT before using the
DOFFIII.
Nozzles can wear which will aff ect the performance of the machine. Replace nozzle if spray jet
becomes defused or defi ned jets appear at the edges of the spray.
Periodically apply silicone grease to seals, threads and couplings.
Always cool down DOFFIII system when not in use (we recommend cooling for any break in
opera on of more than 2 minutes).
Stonehealth stock a full range of spare parts. Due to the nature of the system, we recommend
only using parts supplied by Stonehealth and will need to be fi ed by a competent person.
Always use the DOFFIII System as per the Stonehealth
Approved Induc on Training and Safety recommenda ons.
Spare parts, accessories and chemicals are available
to order online at store.stonehealth.com or by
contac ng the Stonehealth team on 01453 540 600.
Spare parts
DOFFIII Induc on video can be
accessed online, visit the Stonehealth
Contractors website support page.
Induc on video
In hard water areas we
recommend descaling every
two days of opera on. For
descaling procedure please
refer to your training or visit
the Stonehealth Contractors
website support page.
Check the oil level daily in
the sight-glass window. This
must be done with the pump
switched off and the pump
cold or having rested for a
minimum of 10 minutes.
Check inlet fi lter for debris
daily.
DESCALE OIL LEVEL PUMP INLET FILTER

ORIGINAL INSTRUCTIONS 17
EC Declara on of Conformity
WHAT DOES A DECLARATION OF CONFORMITY MEAN?
It is a formal declara on by a manufacturer, or the manufacturer’s representa ve, that the product
to which it applies meets all relevant requirements of all product safety direc ves applicable to that
product. It is a sign that a product has been designed and constructed for compliance with relevant
essen al requirements, and has been through the appropriate conformity assessment processes.
A Declara on of Conformity is not a guarantee for safety. However, when properly drawn up
along with CE marking on the product, conformity of the product with the Direc ve(s) quoted on
the Declara on of Conformity may be presumed by suppliers in the distribu on chain and by the
end customer, provided there are no obvious or known defects. Addi onally, market surveillance
authori es, must presume that CE marked products, accompanied by a Declara on of Conformity
comply with the provisions of the Direc ve(s) men oned, unless they have evidence to the contrary
(for example by examining or tes ng the product).
Products subject to more than one Direc ve may come with a single Declara on of Conformity
declaring conformity with two or more Direc ves, or there may be several Declara ons, one for
each Direc ve. However, where a CE marked product is incorporated in another, such as a safety
interlock in a machine, the Declara on of Conformity for the fi nal product may only declare
conformity of the overall fi nal product. In this case the Declara on(s) for any CE marked
component parts should form part of the technical fi le for the complete product.

ORIGINAL INSTRUCTIONS 18
UK/
EC Declaration of Conformity
In accordance with EN ISO 17050-1:2004
in accordance with the following Directives:
hereby declare under our sole responsibility that:
is in conformity with the applicable requirements of the following documents:
Noise measurements have been made in accordance with Directive 2000/14/EC Annex III.B.27 with internal control of
production (Schedule 8/Annex V). The declared noise values are as follows:
I hereby declare that the equipment named above has been designed to comply with the relevant sections of the above
referenced specifications and is in accordance with the requirements of the Directives.
Signed by: ...........................................................................................................................................................................
The technical documentation for the machinery is available from the above address.
We Stonehealth Ltd
of G4/5 Draycott Business Park, Cam, Dursley, Gloucestershire, GL11 5DQ, UK
2004/108/EC The Electromagnetic Compatibility Directive
2006/42/EC The Machinery Directive
2000/14/EC The Noise Emission in the Environment by Equipment for Use Outdoors Directive
2011/65/EU The Restriction of Hazardous Substances Directive
Equipment
Model
Specialist Steam Cleaning Equipment.
DOFFIII
Serial Number D3– as per dash name plate.
Ref. No. Title Edition/date
BS EN ISO 12100 Safety of machinery. General principles for design. Risk assessment and risk reduction 2010
BS EN 60335-2-79 Household and similar electrical appliances. Safety. Particular requirements for high
pressure cleaners and steam cleaners
2012
BS EN 61000-6-1 Electromagnetic compatibility (EMC). Generic standards. Immunity for residential,
commercial and light-industrial environments
2007
BS EN 61000-6-3 Electromagnetic compatibility (EMC). Generic standards. Emission standard for
residential, commercial and light-industrial environments
2007 +
A1:2011
Measured sound power level Guaranteed sound power level
89 dB Lwa 92 dB Lwa
Name: Mr Brian Crowe
Position: Executive Chairman
Done at: Stonehealth Cam
On: 01/12/2023 Document ref. No.
6162/15D1904

ORIGINAL INSTRUCTIONS 19

ORIGINAL INSTRUCTIONS 20
As RIBA/CPD Registered Providers, Stonehealth’s exper se contributes to the conserva on of historical buildings. It supports
conserva on and environmental organisa ons, including the Na onal Trust, English Heritage, Historic Scotland, CADW and other
worldwide conserva on bodies. Stonehealth is proud of its reputa on in providing solu ons with integrity and se ng new standards
of restora on and technology excellence in the stone industry.
USER GUIDE
Stonehealth Ltd | G4/5 | Drayco Business Park | Cam | Dursley | GL11 5DQ
Table of contents
Other Stonehealth Cleaning Equipment manuals