manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Sun Power
  6. •
  7. Solar Panel
  8. •
  9. Sun Power Equinox X Series Datasheet

Sun Power Equinox X Series Datasheet

This manual suits for next models

2

Other Sun Power Solar Panel manuals

Sun Power SPR-315E-WHT-D Setup guide

Sun Power

Sun Power SPR-315E-WHT-D Setup guide

Sun Power SPR-MAX6-450-E3-AC Setup guide

Sun Power

Sun Power SPR-MAX6-450-E3-AC Setup guide

Sun Power PERFORMANCE P6-COM-S-BF User manual

Sun Power

Sun Power PERFORMANCE P6-COM-S-BF User manual

Sun Power Equinox SPR-X21-335-BLK-C-AC Setup guide

Sun Power

Sun Power Equinox SPR-X21-335-BLK-C-AC Setup guide

Sun Power X Series User manual

Sun Power

Sun Power X Series User manual

Sun Power SPR-E-Flex-110 Setup guide

Sun Power

Sun Power SPR-E-Flex-110 Setup guide

Sun Power SPR-E Series Setup guide

Sun Power

Sun Power SPR-E Series Setup guide

Sun Power E Series Setup guide

Sun Power

Sun Power E Series Setup guide

Sun Power E Series Setup guide

Sun Power

Sun Power E Series Setup guide

Sun Power SPR-E-Flex-50 Setup guide

Sun Power

Sun Power SPR-E-Flex-50 Setup guide

Sun Power BPS SP40 User manual

Sun Power

Sun Power BPS SP40 User manual

Sun Power Equinox SPR-X21-335-BLK-C-AC User manual

Sun Power

Sun Power Equinox SPR-X21-335-BLK-C-AC User manual

Popular Solar Panel manuals by other brands

O.N 23.8757.15 user manual

O.N

O.N 23.8757.15 user manual

PV-ezRack DFendr installation guide

PV-ezRack

PV-ezRack DFendr installation guide

Navitron HFC-2 installation instructions

Navitron

Navitron HFC-2 installation instructions

AXITEC 60-CELL installation manual

AXITEC

AXITEC 60-CELL installation manual

thermital TSOL 20 N BLU installation instructions

thermital

thermital TSOL 20 N BLU installation instructions

moovo KSM001 Installation and use instructions and warnings

moovo

moovo KSM001 Installation and use instructions and warnings

AZO Digital MPPT-3000 operating manual

AZO Digital

AZO Digital MPPT-3000 operating manual

Clenergy PV-ezRack SolarTripod installation guide

Clenergy

Clenergy PV-ezRack SolarTripod installation guide

Beretta SCF-20N installation manual

Beretta

Beretta SCF-20N installation manual

Solarland Portable Series Instruction handbook

Solarland

Solarland Portable Series Instruction handbook

Ubiquiti sunMAX user guide

Ubiquiti

Ubiquiti sunMAX user guide

Sonnenkraft GK5-HP manual

Sonnenkraft

Sonnenkraft GK5-HP manual

REC TwinPeak 2S Mono 72 Series installation instructions

REC

REC TwinPeak 2S Mono 72 Series installation instructions

Flexsolar C100 Instruction manual & warranty

Flexsolar

Flexsolar C100 Instruction manual & warranty

Energizer HardCase Sunpack 120W user guide

Energizer

Energizer HardCase Sunpack 120W user guide

solarwatt EasyIn 60M Series installation instructions

solarwatt

solarwatt EasyIn 60M Series installation instructions

Mission Solar Energy MONO Series Installation and user manual

Mission Solar Energy

Mission Solar Energy MONO Series Installation and user manual

Wiedenmann Favorit XP Translation of original operating instructions

Wiedenmann

Wiedenmann Favorit XP Translation of original operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

SunPower Equinox™ Installation Quick Start Guide
Specifications
Required Documents:
Follow these documents as well:
• InvisiMount Installation Guide
508988 RevJ
• PVS6 Installation QSG #531566
RevA
Reference Material:
• SunPower Pro Tips YouTube
videos:
www.youtube.com/user/
sunpower/videos
• Equinox Installation Guide
Before You Begin:
A. Select the correct trunk cable:
1. Mark the array footprint on the roof.
2. Locate rafters and determine attachment points.
3. Install roof attachments.
4. Install rails.
5. Level rails.
6. Torque attachment hardware.
7. Stage the trunk cable atop the rails according to circuit
layout; add terminator (if not yet installed) to the circuit end.
8. Install the Rooftop Transition Flashing (if composition
shingle roof); or equivalent.
9. Install the Rail-Mounted J-Box (RMJ), or equivalent, and
wire the non-terminator end of the trunk cable into it,
transitioning to the building wiring and equipment ground
conductor (EGC).
10.Attach a ground lug assembly to the rail, adjacent to the
RMJ.
11.Attach a 6 AWG copper ground wire to the lug, and connect
it to the EGC inside the RMJ using the included cable gland.
Install the cover on the RMJ.
Module and Orientation Trunk Cable #
• E-Series Portrait
• X-Series Portrait
• E-Series Landscape
• X-Series Landscape
531573
A-Series Portrait 531572
A-Series Landscape 532458
B. Prepare the trunk cable:
• Determine the array circuit layout,
noting the number of connectors that
will NOT plug into a module (due to
row transition or irregular array shape),
then cut a section of trunk cable that
has one connector per module PLUS
that number. Add a sealing cap to each
skipped connector.
• Add a terminator (C.) to the trunk cable
where the circuit will end (you may
instead do this on the roof after you
stage the trunk cable).
C. Add a terminator:
1. Remove 1/2”of outer sheathing from one
end of the trunk cable—DO NOT remove
the black and red insulation on the two
conductors. Very slightly separate the two
conductors.
2. Slide the nut over the cable, with its
threads facing away.
3. Fit the cable end into the terminator and
carefully insert it such that each of the two
conductors is internally separated by the
terminator. (Ensure that the white inner
grommet stays in place.)
4. Use a screwdriver through its end to
stabilize the terminator, and then tighten
the nut only—DO NOT ROTATE THE
TERMINATOR!
5. Use cable clips to manage the terminated
end of the trunk cable such that it is not
visible and does not contact the roof.
Important! Terminators are single use
only!
To install:
SunPower Equinox™ Installation Quick Start Guide
Specifications
© 2019 SunPower Corporation. All rights reserved. SunPower, the SunPower logo, Equinox™,
and InvisiMount™ are trademarks or registered trademarks of SunPower Corporation. All
other trademarks are the property of their respective owners.
533528 RevA
13. Install cable management clips on module frames as shown.
14. Transport modules to roof.
15. Remove the microinverter (MI) serial number sticker
and place it on your array layout diagram (ALD).
16. Remove the module serial number sticker and place it
on your ALD.
17. On each module, carefully raise the MI away from the backsheet
until each side clicks into position.
18. Position the rst module of rst row (the lower row in
a two-row array) on the rails, connect the trunk cable, and align the
module on the rails with the marked array footprint.
19. Attach the end clamps to the rst module.
20. Place the second module next to the rst, raise its MI,
and connect the trunk cable. Add mid clamps.
21. Continue installing modules till the end of the row,
cutting rails as necessary for the last module.
22. Complete wire management of the rst row by tting
the trunk cable into the pre-positioned cable clips.
23. Install two row-to-row spacers per module, on the
upper edge of each of the rst row's modules.
24. Install the second (upper) row by repeating
Steps 15–21 of this QSG.
25. Install a row-to-row grounding clip between the two
rows, at one end of the array.
If you need to make a connector:
1. Slide the nut over the cut cable end.
2. Ensure that the grommet is in place inside
the cover, and then slide the cover over the
cable end.
3. Remove 1 1/16” from the cable's outer
sheathing.
4. Strip 3/8”from the red conductor and from
the black conductor.
5. Load the two terminals into the 12 GA slot of
crimp tool, ush with the slots.
6. Fit the exposed conductors into the
terminals and crimp them—DO NOT CRIMP
OVER THE INSULATION!
7. Insert the terminals into the connector body
until each clicks into place, and then tug on
them to ensure they are secure.
8. Slide the cover over the body until you feel it
click into place.
9. Tighten the nut to 62 in-lb (7 N-m).
Important! When the connector is fully
assembled, the cable outer sheathing must
extend completely through the gasket inside
the cover, and the gasket must fully cover the
sheathing in order to prevent moisture from
entering the connector.
Note: For non-standard cable
transitions use a 90° clip.
E-Series and X-Series AC Modules
A-Series AC Modules
OR