
KRB-5200h
Table of Contents
1. OUTERVIEW .........................................................................................................................................1
2. RECEIVINGANDHANDLING...................................................................................................................2
2.1 Unpacking Precautions...................................................................................................................2
2.2 Transportation Precautions.............................................................................................................2
2.3 Storage Precautions .......................................................................................................................2
3. INSTALLATION.......................................................................................................................................4
3.1 Installing Rear-Connected ACB......................................................................................................4
3.2 Installing Plug-in ACB.....................................................................................................................6
3.3 Connection and Specifications of Accessories...............................................................................9
3.3.1 Undervoltage Trip Device (UVT)..............................................................................................9
3.3.2 Shunt Trip Device (SHT)........................................................................................................10
3.3.3 Auxiliary Switch (AX) and Alarm Switch (AL).........................................................................11
3.3.4 Motor Operator.......................................................................................................................12
4. OPERATION.........................................................................................................................................13
4.1 Direct-Manual Operation...............................................................................................................13
4.2 External-Manual Operation...........................................................................................................15
4.3 Motorized Operation .....................................................................................................................17
4.3.1 Motorized Operator...................................................................................................................17
4.3.2 Manual Operation.....................................................................................................................19
5. OVERCURRENTTRIPDEVICE.............................................................................................................20
5.1 Setting Change .............................................................................................................................20
5.2 OCR Field Tests ...........................................................................................................................21
5.2.1 Tests with Current Applied to the Main Circuit ......................................................................21
5.2.2 Tests with Current Applied to the OCR Test Terminal ..........................................................23
5.2.3 Tests Using OCR Checker (type ANS1)................................................................................25
5.3 Operation Characteristic Curves...................................................................................................26
6. PRECAUTIONSONTEMPERATURE-RISETEST...................................................................................27
7. PRECAUTIONSONINSULATIONRESISTANCETESTANDDIELECTRICWITHSTANDVOLTAGETEST .27
7.1 Insulation Resistance Measurement.............................................................................................27
7.2 Dielectric Withstand Voltage Test.................................................................................................27
7.2.1 Main Circuit............................................................................................................................27
7.2.2 Auxiliary and Control Circuits.................................................................................................27
8. MAINTENANCEANDINSPECTION........................................................................................................28
8.1 Guideline of Inspection Interval ....................................................................................................28
8.2 Inspection Procedures..................................................................................................................29
9. TROUBLESHOOTING...........................................................................................................................31