
3
The Terminator ZP/FAK-1 Split Bulkhead Entry Kit is designed to
make a waterproof seal over the end of TubeTrace and terminate
Thermon electric heat trace in an approved juncon box. Review
Instrucons prior to installaon. Kit will make one connecon.
INSTALLATION PROCEDURES
Installaon Precauons
• To minimize the potenal for arcing on electrical heat tracing
and re caused by product damage or improper installaon,
use ground-fault protecon.
• Installaon must comply with Thermon requirements and be
installed in accordance with any applicable naonal and local
codes.
• Component approvals and performance rangs are based on
the use of Thermon specied parts only. User supplied power
connecon ngs must be listed or cered for intended use.
• De-energize all power sources before opening enclosure.
• Keep ends of bundles, heat tracing and kit components dry
before and during installaon.
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper personal protecve equipment, or PPE, should be
ulized during installaon. Contact Thermon if you have any
addional quesons.
Terminator ZP Cercaons/Approvals
2. Trim heat tracing to within 305 mm–381 mm
(12”–15”) of the end of the insulation. If
self regulating heat trace proceed to step
3. For Zone-type heat trace continue with
indencaon of bus connecon on step 2a.
1. Remove outer jacket and insulaon from tubing
bundle as included from end of the tubing
bundle. Ensure sucient heat trace is available
for electrical connection. See instructions
included with heat trace PETK kit (purchased
separately).
2a. Strip back bundle insulaon 38 mm (1-1/2”)
to 76 mm (3”) beyond bus connecon heat
tracing. If bus connecon indentaon is less
than 305 mm–381 mm (12”–15”) from end of
the heat tracing, proceed stripping the bundle
insulaon to the next indentaon.
3. Wrap tubes and heat tracing with pass of heat
reecve tape (25% overlap). Then wrap with 3
passes of glass ber tape (50% overlap), or unl
ber tape is equal to original bundle insulaon
thickness.
4. Complete with additional passes of heat
reecve tape.
Trim as Required
for Connecon
Tubing Bundle
Tubing
Heat Tracing
Tubing
Self-Regulang Heat Tracing
Heat Tracing
305 mm–381 mm
(12”–15”)
Insulaon
Zone Type Heat Tracing
Tubing
Bus Connecon
Indentaons
(Zone Heater Only)
305 mm–381 mm
(12”–15”)
Insulaon
Glass Fiber Tape
Heat Reecve Tape
Heat Tracing
5. Cut FAK-1 top and base ends to match outside
diameter of tubing bundle and remove end
pieces.
Heat Reecve Tape
Glass Fiber Tape
Heat Tracing
Tubing
CAUTION (Found on TubeTrace SE/ME bundles)
Do not cut or damage the heat
trace or sampling tube.
Tubing Bundle
Cut and Remove
to t
Heat Tracing
Field Drilled
(By Others)
IP66/Type 4X -60°C ≤ Ta ≤ +55°C
Listed Heat Tracing Cable System 137M
Ordinary & Hazardous Locaons
Class I, Division 2, Groups A, B, C, & D
Class II, Division 2, Groups F & G, Class III
Class I, Zone 1, AEx eb IIC T4-T6
09.2238691,-G,-S, Ex e IIC T4-T6
FMG 10.0022X Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C
1725 II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C FM 10ATEX0058X