TotalGym.com
U.S. Customer Service: 858.586.6080
Part # 55200-02
©2010 Total Gym Global Corp. All rights reserved. Total Gym is a registered trademark of TGG Corp. Unauthorized duplication of this booklet is punishable by law.
GTS®: Designed in the United States of America. Manufactured in Taiwan. Covered by one or more of U.S. Pat. Nos. 5,967,955; 6,921,355; 7,270,628; 7,766,801;
D493,853; Australia Des. Pat. No. 154471; European Des. Pat. Nos. 000068788-0001 to 0006; New Zealand Des. Pat. No. 403803; Japan Des. Pat. No. 1203066;
Russia Des. Pat. No. 56172, Taiwan Des. Pat. No. D100334; and other patents pending.
When the fixed pin is inserted into the hole gently move the folding platform
to the right. Then lower the right side of the folding platform down to align the
right pull-pin into the plate on the right lower rail as shown below. You may
need to pull the right pull-pin.
Fixed pin
When both left and right pull-pins are engaged into the rails, rotate the folding
platform away from the glideboard until the lower pull-pin on the left side pops
into the rail hole. To fold the platform for storage, simply disengage the lower
left pull-pin and fold the platform (the squat stand will be attached).
Lower
pull pin
TELESCOPING SQUAT STAND ATTACHMENT
Lift the release lever on the
back of the telescoping squat
stand. Align the squat stand
receptacle posts over the
folding platform posts. Slide
the squat stand down and align
it with one of the three levels
indicated by the holes in the
posts. Release the lever to lock
the squat stand into place.
Inspect the lever and pull up on the squat stand handle to insure the squat
stand is locked in on both sides.
INSTALLING THE HANDLES
Open the hardware box and remove the
handles and threaded quick links
as shown. Install them on each end of
the cable.
ALMOST FINISHED
When the assembly is finished, look for extra parts to ensure no steps were
missed. Inspect your Total Gym® for defects and contact Customer Service if
you feel you have any problems. Before using your new Total Gym, read the
safety and usage instructions in the Owners Guide.
YOUR TOTAL GYM GTS® IS NOW READY TO USE.
Cable and Pulley Use Position: Raise the LAT bars to use the pulleys and
cable. Rotate each LAT bar up and parallel with the tower, ensuring the pull
pin engages in the hole of the tower cross arm on both sides.
Changing the Pulley Pin Position: Squeeze the pulley clamp and move it to
the desired position along the LAT bar. Be sure the pulley clamp engages one
of the pin positions on the back of the LAT bar.
FOLDING FOOT HOLDER INSTALLATION
Your Total Gym GTS® arrives with the folding foot holder, which needs to be installed.
Remove the folding foot holder from the box and install it on the upper rails.
Place the rails at or above
level 10 so you have room to
install the folding foot holder
from underneath the rails.
Aim one pin into the hole of a
rail while holding the folding
foot holder upper bar even
with the middle of the rails.
Continue to hold the folding
foot holder upper bar even
with the middle of the rails.
Pull the pin on the other side.
Align and insert it into the
hole in the opposite rail,
and release the pin. Ensure
both pins are fully engaged in
the rails.
Folding Foot Holder Use Position: Pull up on the
upper bar to engage the folding foot holder for use.
Depress the lever where indicated to fold down when
not in use.
TELESCOPING SQUAT STAND ASSEMBLY
There are two attachments that make up the telescoping squat stand assembly—the folding
platform attachment and the squat stand attachment.
FOLDING PLATFORM ATTACHMENT
Stand at the base of the rails facing the tower. Hold the folding platform with a hand on
each post. Partially angle the posts toward the glideboard. Align the upper fixed pin on
the left with the top hole on the lower rail. Allow the lower pull-pin to press against the
plate on the left side of the rail as you guide the upper fixed pin into the hole.
LAT bars are specific to each side of the tower. When installed the pulley pin
locators will be facing backward away from the front of the unit.
While holding the inside rail bushing so it does not slide out, insert the correct
LAT bar through the bushings until it is flush with the outside rail bushing.
Insertion
point
Round nut
Reinstall a round nut and tighten it so the LAT bar rotates freely but with
slight friction.
Install the second round nut on the same LAT bar until it is tight against the
first nut. Hold one spanner wrench on the inner round nut so it will not move.
Then use the other spanner wrench to tighten the second round nut against
the first. See image below.
Rotate the LAT bar to feel if it moves easily but with slight friction.
If necessary, adjust the tightness by adjusting the round nut closest to the rail
and retighten the second nut as explained in Step 18.
Repeat the process on the other LAT bar.
When you are finished adjusting the tightness of the LAT bars, install both axle
covers over the round nuts as shown below:
Axle coversAxle covers
ADJUSTING THE LAT BARS
Pull-up Position: Pull the retractable knobs to disengage the LAT bars from
the tower cross arm and rotate the LAT bars down until they rest on the rail.
Pin
Upper bar
Pin
Pin
Lever
28
29
24
25
26
27
19
20
23
21
22
15
16
17
18
TotalGym.com
U.S. Customer Service: 858.586.6080
TotalGym.com
U.S. Customer Service: 858.586.6080
LAT BAR ASSEMBLY
After you remove your Total Gym GTS® from the box and unfold it, it is ready for you
to install the LAT bars. It should look like the picture below. Notice the shipping sleeve
shown and the round nuts must be removed one side at a time to install the LAT bars.
Nuts
Sleeve
Open the hardware box and remove the spanner wrenches.
The picture below shows tools and parts needed to install the LAT bars, found
in the hardware box: You need 2 round nuts, 2 spanner wrenches and 2
plastic axle caps.
Install one LAT bar completely, then install the other to keep the GTS® stable
and safe.
Using both spanner wrenches, hold the inner round nut stationary with one
wrench (on the inside of the rail) and turn the round nut on the outside of the
rail to loosen and remove the shipping sleeve (shown below).
Carefully slide the shipping sleeve out while holding the bushing in. If the
bushing slides out accidentally, slide it back through the hole in the tower
cross arm and into the rail.
Shipping
Sleeve
Bushing
When the tower begins to pull away from the upper rails, grasp the upper rail
where indicated on the inside of the rail just above the hinge (indicated on
both sides) and continue to unfold the rails and lower them to the floor. As the
rails straighten, guide the glideboard rollers into the groove of the upper rail if
needed.
Caution! As the rails get close to the floor, the rails feel heavier. To avoid
pinching the rollers in the hinges, do not drop the rails.
Hold here
Grasp here
while lowering
ADJUSTING THE INCLINE OF THE RAILS
Raise the rails to a level between 10 and 14 as explained in steps 8 - 10. Note: Slightly lift the
rails, then depress the release handle on the top of the tower. Then continue to lift the rails to
avoid a ratcheting sound.
Stand next to the tower.
Grasp the upper rail near the tower. Lift to the desired level. Incline scale is located on
the side of the tower.
Note: When the folding foot holder is attached after assembly, grasp the rails above the
folding foot holder when lifting, to avoid pinch areas. Do not hold rails below the folding
foot holder attachment.
Push the rail down to insure it engages into the tower.
REMOVING TOTAL GYM GTS FROM THE BOX
Remove the lid of the Total Gym® box and set it aside.
Remove all interior boxes from the top and sides. Cut the tape on the end of
the box at the base of the tower. Unfold that end of the box.
Stand the Total Gym GTSTM upright and roll it to the location where you want
the tower to stand.
Remove the folding platform and the telescoping squat stand parts from the
bottom of the box.
UNFOLDING TOTAL GYM
Unlatch the rails from the tower.
Standing at the side of the unit, with one hand
behind the tower and the other hand on the
glideboard, tilt the unit slightly backward and
use your foot to push the rail base away from
the tower. The tower will follow the upper rails
forward and then it will begin to pull away from
the rails, backward to an upright position.
Caution! The tower is designed to open
automatically by pulling away from the upper
rails as the rails begin to unfold. Do not force
or push the tower away from the rails, as this
may cause the tower to fall backward.
7
8
9
10
TOTAL GYM GTS®
ASSEMBLY AND SET-UP INSTRUCTIONS
1
2
3
4
5
6Hold
glideboard
Hold
tower
Push rail
base here
with foot
Latch
11
12
13
14
TOTAL GYM GTS BOX CONTENTS:
• Tower, Rail and Glideboard Assembly
• LAT Bars and Arm Pulley Cable Assembly
• Folding Platform
• Telescoping Squat Stand
• Folding Foot Holder
• Hardware & Information Box
TOTAL GYM GTS® HARDWARE & INFORMATION BOX CONTENTS:
• Spanner Wrenches (2)
• Plastic Axle Caps (2)
• Round Nuts (2)
• Quick Links (2)
• Strap Handles (2)
• Assembly Instructions and Owner’s Guide
• Assembly, Set-up and Storage DVD
TotalGym.com
U.S. Customer Service: 858.586.6080
Part # 55200-02
©2010 Total Gym Global Corp. All rights reserved. Total Gym is a registered trademark of TGG Corp. Unauthorized duplication of this booklet is punishable by law.
GTS®: Designed in the United States of America. Manufactured in Taiwan. Covered by one or more of U.S. Pat. Nos. 5,967,955; 6,921,355; 7,270,628; 7,766,801;
D493,853; Australia Des. Pat. No. 154471; European Des. Pat. Nos. 000068788-0001 to 0006; New Zealand Des. Pat. No. 403803; Japan Des. Pat. No. 1203066;
Russia Des. Pat. No. 56172, Taiwan Des. Pat. No. D100334; and other patents pending.
When the fixed pin is inserted into the hole gently move the folding platform
to the right. Then lower the right side of the folding platform down to align the
right pull-pin into the plate on the right lower rail as shown below. You may
need to pull the right pull-pin.
Fixed pin
When both left and right pull-pins are engaged into the rails, rotate the folding
platform away from the glideboard until the lower pull-pin on the left side pops
into the rail hole. To fold the platform for storage, simply disengage the lower
left pull-pin and fold the platform (the squat stand will be attached).
Lower
pull pin
TELESCOPING SQUAT STAND ATTACHMENT
Lift the release lever on the
back of the telescoping squat
stand. Align the squat stand
receptacle posts over the
folding platform posts. Slide
the squat stand down and align
it with one of the three levels
indicated by the holes in the
posts. Release the lever to lock
the squat stand into place.
Inspect the lever and pull up on the squat stand handle to insure the squat
stand is locked in on both sides.
INSTALLING THE HANDLES
Open the hardware box and remove the
handles and threaded quick links
as shown. Install them on each end of
the cable.
ALMOST FINISHED
When the assembly is finished, look for extra parts to ensure no steps were
missed. Inspect your Total Gym® for defects and contact Customer Service if
you feel you have any problems. Before using your new Total Gym, read the
safety and usage instructions in the Owners Guide.
YOUR TOTAL GYM GTS® IS NOW READY TO USE.
Cable and Pulley Use Position: Raise the LAT bars to use the pulleys and
cable. Rotate each LAT bar up and parallel with the tower, ensuring the pull
pin engages in the hole of the tower cross arm on both sides.
Changing the Pulley Pin Position: Squeeze the pulley clamp and move it to
the desired position along the LAT bar. Be sure the pulley clamp engages one
of the pin positions on the back of the LAT bar.
FOLDING FOOT HOLDER INSTALLATION
Your Total Gym GTS® arrives with the folding foot holder, which needs to be installed.
Remove the folding foot holder from the box and install it on the upper rails.
Place the rails at or above
level 10 so you have room to
install the folding foot holder
from underneath the rails.
Aim one pin into the hole of a
rail while holding the folding
foot holder upper bar even
with the middle of the rails.
Continue to hold the folding
foot holder upper bar even
with the middle of the rails.
Pull the pin on the other side.
Align and insert it into the
hole in the opposite rail,
and release the pin. Ensure
both pins are fully engaged in
the rails.
Folding Foot Holder Use Position: Pull up on the
upper bar to engage the folding foot holder for use.
Depress the lever where indicated to fold down when
not in use.
TELESCOPING SQUAT STAND ASSEMBLY
There are two attachments that make up the telescoping squat stand assembly—the folding
platform attachment and the squat stand attachment.
FOLDING PLATFORM ATTACHMENT
Stand at the base of the rails facing the tower. Hold the folding platform with a hand on
each post. Partially angle the posts toward the glideboard. Align the upper fixed pin on
the left with the top hole on the lower rail. Allow the lower pull-pin to press against the
plate on the left side of the rail as you guide the upper fixed pin into the hole.
LAT bars are specific to each side of the tower. When installed the pulley pin
locators will be facing backward away from the front of the unit.
While holding the inside rail bushing so it does not slide out, insert the correct
LAT bar through the bushings until it is flush with the outside rail bushing.
Insertion
point
Round nut
Reinstall a round nut and tighten it so the LAT bar rotates freely but with
slight friction.
Install the second round nut on the same LAT bar until it is tight against the
first nut. Hold one spanner wrench on the inner round nut so it will not move.
Then use the other spanner wrench to tighten the second round nut against
the first. See image below.
Rotate the LAT bar to feel if it moves easily but with slight friction.
If necessary, adjust the tightness by adjusting the round nut closest to the rail
and retighten the second nut as explained in Step 18.
Repeat the process on the other LAT bar.
When you are finished adjusting the tightness of the LAT bars, install both axle
covers over the round nuts as shown below:
Axle coversAxle covers
ADJUSTING THE LAT BARS
Pull-up Position: Pull the retractable knobs to disengage the LAT bars from
the tower cross arm and rotate the LAT bars down until they rest on the rail.
Pin
Upper bar
Pin
Pin
Lever
32
33
34
35
30
31
28
29
24
25
26
27
19
20
23
21
22
15
16
17
18
TotalGym.com
U.S. Customer Service: 858.586.6080