
DBS ®VICI AG International
Parkstrasse 2
CH-6214 Schenkon
Switzerland
Phone: Int +41 41 925 62 00
Fax: Int +41 41 925 62 01
Web: www.vicidbs.com
4
SETTING UP THE HK-PLUS HYDROGEN GENERATOR
8. The unit will immediately begin to build up pressure. The LCD display will show the message
“Reaching internal Pressure”, and the H2 ow bar will indicate maximum ow (fully illuminated).
9. Wait until the internal pressure is reached.
10. Once the pressure is reached, the LCD display will show the “Ready” message and the H2
ow bar will indicate no ow.
11.Press the “Open” button on the touch screen. The generator starts to provide Hydrogen to
the output port.
12.After a few minutes, the pressure should stabilize at the set pressure, unless there is a gas leak
in the external equipment or a too high Hydrogen consumption.
13. The generator is now in normal operation mode.
N.B. In the event of any faults or damage, rst notify the agent or distributor who supplied
the unit. If this is not possible, inform the manufacturer directly. Please also provide full
details of the problem, including the model and serial number. Instructions will then be
provided for the service or the return of the unit. Only if return authorization is provided by
the manufacturer as per these instruction, the device will be received and repaired.
RETURNS BACK TO VICI DBS s.r.l. FOR REPAIR OR MAINTENANCE
• The ORIGINAL package MUST be kept for eventual shipments back to the factory.
• VICI DBS s.r.l. is not responsible for damages if instrument is not shipped in the original
package.