
2523
15
3435
16
31
17
39
21
19
38
37
32
36
33
14
13
29
2422
Fig. 1a
Fig. 1b
1.Building, Roof and Detail Preparation
Remove any mold flash from Building Walls,•
Tower Walls and Roof using a hobby knife and
sandpaper (Fig. 1a).
Pay special attention to mold flash in grooves•
on backside of Walls.
Wash Walls, Roof and Details (on sprue) in•
warm, soapy water. Rinse and let dry.
Remove Details from sprue with a•
hobby knife (or flush cutting shears).
NOTE: Do not remove placement
posts from Details (Fig. 1b).
Sand off any mold flash and parting•
lines from Details. NOTE: Do not
sand placement posts.
2.Install Hinged Doors
Do NOT glue Fire Station Doors to Door Supports.
Fire Station Doors are hinged to swing inward.
Place Front Wall face-down.•
Insert hinge pins on LH Door into hinge•
barrels on LH Door Support (Fig. 2a).
Install LH Door Assembly on right-hand•
side of Front Wall (Fig. 2b).
Carefully apply glue along LH Door Support.•
Insert hinge pins on RH Door into hinge•
barrels on RH Door Support (Fig. 2c).
Install RH Door Assembly on left-hand•
side of Front Wall (Fig. 2d).
Carefully apply glue along RH Door Support.•
Continue in same manner with LH Door and•
LH Door Support , and RH Door and RH
Door Support .
NOTE: Position Door and Support with flat sides facing same direction.
3.Assemble Tower
Place Front Tower•
Wall face-down.
Align three locking•
tabs on Right Tower
Wall with Front
Tower Wall and snap
in place (Fig. 3a)
Fig. 2b
Fig. 2d
Fig. 3a
3
19
20
2125
24
22
9
6
18
23
3
Fig. 2c
19 22
Fig. 2a
23
18
18, 23
19, 22
18, 23
19, 22
2523
15
3435
16
31
17
39
21
19
38
37
32
36
33
14
13
29
2422
Placement Posts
6
9
3