ASCO Series 300 Quick Connect Power Panel
381333-464 www.ascopower.com
5
Installation – Continued
Step 3: Wiring the Lug Terminals
Ensure circuit breakers are OFF and the transfer switch is
locked
out from utility power prior to connection.
Failure to install transfer switch will create the potential for
the
generator to energize utility lines and endanger utility
personnel.
Conversely, utility lines may energize the
ASCO Series 300 Quick Connect Power
Panel
and
endanger generator personnel.
The ASCO Series 300 Quick Connect Power
Panel is for the connection of a
generator to the
source terminals of a transfer switch, such
that
the inlets are only energized from the generator.
1.
Pull the cables for the transfer switch to the ASCO
Series 300 Quick Connect Power
Panel
2.
Beginning with the ground, strip and install the cables
in the appropriate compression terminals
The terminals can accommodate #2 to 600MCM, Copper
wire only
3.
Tighten terminal screws to 375 lb-in torque each
4.
If metallic conduit is used, connect ground wire from
ground
bushing on conduit to the ground connection
point in the upper
right quadrant of the panel
A.
Ground conductor must be a minimum of #3 AWG
Conduit shall NOT be relied upon to provide grounding
protection to tap box
5.
Continue to connect the neutral and then the phases
6.
Vacuum entire upper chamber to ensure no metal
shavings are left
behind
7.
Replace dead front panel door and secure using four
(4) 10-32 x
1/2” Phillips-headed screws
Three phase power systems consist of three phase or hot
conductors that are shifted by 120 degrees. Three phase
loads such as motors may only work properly if the
phases are
connected in the correct order. Some motors
may work when
connected improperly, but will operate
backwards. Utility power
and electrical generators may be
wired either in a clockwise or counter-clockwise order. It is
important that any generator
connected to the ASCO
Series 300 Quick Connect Power Panel is connected in the
same rotation (clockwise or counter-clockwise) as the
utility power.
Step 4: Determine Phase Rotation
This information will be needed when connecting a
generator
.
1.
Pull Determine phase rotation of the utility power.
A.
Connect a phase rotation meter to a three phase power
source in
the building and record whether the building is
wired clockwise or
counter-clockwise
2.
Apply the provided label to the inside of the ASCO Series
300 Quick Connect Power
Panel
on the inside of the cam
connection chamber door. (Figure 4)
Figure 4
Place rotation label here
Step 5: Conduct a safety test to ensure
proper
installation
Do not attempt to use the ASCO Series 300 Quick Connect
Power Panel prior to
installation and completing the Pre-
Operation and Maintenance
Checklist under Appendix A
.