Installation, Operation & Maintenance Manual
INSTALLATION
4
Rev 09/17
Surface Mounted End Wall Guard
Model(s): BCGVS-EW-P
installation
Preparation: Verify that all products listed on the packaging slip are included in the
package. Check the products for damage. If product is damaged, contact customer
support immediately to report a freight claim.
Store material in a clean dry place where the temperature is maintained between 50°F
(10°C) and 100F (38C). Walls and rooms should be maintained at a minimum of 65°F
(18°C) for at least 48 hours prior to installation. Acclimate materials to normal building
conditions for at least 24 hours before cutting and installing.
Step 1 This series of end wall guards is available with molded closure caps. While the
installation of a cap at each end is considered standard, this product may also be
installed with or without a cap at either end, see g 1.
no further trimming. Refer to the Cutting Adjustment Diagrams and Schedule if it is
Step 2
be supplied in .030 inch, .040 inch, .060 inch, .093 inch, or .100 inch thickness. The
.030 and .040 inch material can be cut with a utility knife. Thicker materials should be
ripped on a table saw.
• Full height of end wall guard including thickness of closure caps.
• As close to full partition width as possible without hanging over either side.
• Installed centered on the width of the end wall.
Step 3 If installing on masonry, pre-drill clearance holes in aluminum retainer for
hardware listed below using a #15 (.180 inch) bit for #8 fastener. Locate mounting
see g 2.
If installing on gypsum wall with stud backing, proceed to Step 4.