Remove the Brace Stays only when all the cable sare
securely fitted.
Continue to raise the remaining Portals by repeating the
process. A set of Brace Cables is only required on every
sixth Bay or as shown in the manufacturers layout.
At this point all Base Plates must be firmly fixed
down, ballasted or staked, with the required number
of stakes.
Engage one end of the Roof Panel into both Keder
grooves. Use the Pull Ropes to slide the roof panels into
position - pull both ropes together making sure that both
crew pull evenly. Install the Roof Tension Bars and tension evenly.
Install each Wall by sliding the Slugs into the bottom
track of the Eave Bar. Repeat for both sections of each Wall.
Slide the side of each Wall section into the outside Keder
Track of the Leg Extrusion.
Slide the Wall Bars in from the outside.
INSTALLING ROOF PANELS
21 22
23 24
25 26
27 28
29 30
INSTALLING WALLS