15
Part No. 6-847703-00 Rev. C00
Installation
High pressure reserve header components will
be shipped in one or more cartons. One carton
will contain control section assembly consisting of
master valve, regulator assembly, and reserve
low pressure switch as shown in Figure 6.
Additional cartons contain header extensions,
cylinder pigtails, and header wall brackets.
Header extensions are configured with two or
three cylinder inlets. Large reserve headers may
include combinations and multiples of each type of
header extension.
For floor mounting reserve header assembly,
an appropriate number of manifold header stand
kits should be ordered separately. Depending on
size of high-pressure reserve header assembly,
one or more manifold header stand kits are
required. A vertical stand is required for each
header extension. One vertical stand is required
to support control section of reserve header
assembly. Each header stand kit contains two
vertical stands.
Verify contents of header stand kit (Figure 11).
1. Remove large nut and plug from right side of
control section. Attach header extension to
control section. Position cylinder inlet
connections of each header extension so they
are pointing out . Additional header
extensions may be attached end to end if
required. Install large nut and plug previously
removed on end of last header extension
(Figure 7).
2. A header bracket is provided for each header
extension. Another header bracket is
provided to support control section of reserve
header. Actual position of header brackets on
reserve header to be determined by installer.
Header brackets should be positioned along
length of high-pressure reserve header
assembly and should contact header directly
between cylinder connections. Bracket to
support control section must be located as
shown in Figure 13, Detail C. After each
bracket position has been determined,
measure centerline distance between the
header brackets and record measurements for
later use. Set assembled reserve header
aside for later use.
3. Each header bracket should be attached to a
header stand. Assemble each header stand
by attaching a post base to one end of 66-inch
channel as shown in Figure 13, Detail A. Use
two each 3/8" bolts, flat washers and channel
nuts. Tighten all bolts.
4. Set header stands in a vertical position. Align
all stands and set center to center spacing to
match header bracket spacing recorded in
step 2 . Mark locations of all four base
mounting holes on each header stand. Move
header stands aside and drill holes. Minimum
3/8" diameter mounting bolts are
recommended (by others).
5. Reposition header stands over holes and
install mounting hardware (by others). Tighten
all mounting bolts.
6. Mark all header stands, (except control section
stand), 60-1/2" from finished floor. Align top
of header bracket with mark and attach header
brackets to channels as shown in Figure 13,
Detail B. Use two each 3/8" bolts, flat washers
and channel nuts. Tighten all bolts. Control
section bracket will be attached later.
7. Set assembled reserve header on header
brackets and assemble u-bolt hardware as
shown in Figure 9. Tighten u-bolt nuts.
8. Verify reserve header assembly is level.
Adjust height of brackets as necessary.
9. Attach control section bracket to header stand
as shown in Figure 13, Detail C. assemble
u-bolt hardware. Tighten u-bolt nuts.
Floor Mounting HP Reserve Header
CAUTION:
Do not use thread sealant on header
connections.