
5
5.2. OPERATION..................................................................................................... 45
5.2.1. Operating the lift from the chassis control centre ........................................................ 45
5.2.2. Operating the lift from the platform control centre ....................................................... 46
5.2.3. Special instructions for winter use ............................................................................... 49
5.2.4. Ending the work ........................................................................................................... 49
5.3. TRANSFERRING THE LIFT ........................................................................... 50
5.3.1. Preparing the lift for transport ......................................................................................50
5.3.2. Using the driving device ............................................................................................... 51
5.3.3. Towing the lift ............................................................................................................... 53
5.3.4. Tying down ................................................................................................................... 54
5.3.5. Lifting the device .......................................................................................................... 55
5.4. LONG-TERM STORAGE ................................................................................. 55
6. DINO SKY RACK (OPTION) ................................................................................... 56
6.1. IN CASE OF EMERGENCY ............................................................................ 58
6.1.1. When at risk of losing the stability ...............................................................................58
6.1.2. In case of overloading .................................................................................................. 58
6.1.3. In case of power failure ................................................................................................ 58
6.1.4. In case of malfunction, when even the emergency descent system
is not operational ......................................................................................................... 59
7. INSTRUCTIONS FOR FAULT-FINDING ................................................................60
8. MAINTENANCE SCHEDULE ................................................................................. 64
8.1. SCHEDULE FOR INSPECTIONS REQUIRED BY THE AUTHORITIES .... 66
8.2. LUBRICATION PLAN ...................................................................................... 67
9. ROUTINE MAINTENANCE DURING OPERATION .............................................. 68
9.1. INSTRUCTIONS FOR DAILY MAINTENANCE AND INSPECTIONS ........ 69
9.1.1. Check the condition of chassis, the boom and the work platform ................................ 69
9.1.2. Check the tyres and tyre pressure ............................................................................... 69
9.1.3. Check the lights ........................................................................................................... 69
9.1.4. Check the hydraulic oil level ........................................................................................ 69
9.1.5. Check the hydraulic hoses, pipes and connectors ......................................................69
9.1.6. Check the operation of the safety limit switches .......................................................... 70
9.1.7. Check the operation of the emergency descent, the emergency stop
and the sound signal .................................................................................................... 70
9.1.8. Decals, stickers and signs ...........................................................................................70
9.1.9. Instruction manuals ...................................................................................................... 70
10. CHANGE OF OWNER ............................................................................................. 73