
5
ED250 08-2018DL4614-070
dormakaba ED250 IG Installation Instructions Table of Contents
In-ground case installation
. Verify concrete floor blockout
. Install cement case, single door
. Install cement cases, double door
. Locate center of cement case spindle
. Reinstall cement case cover
. Anchoring cement pour in blockout around
bottom one inch of cement case
. Remove cement case cover.
. Single door, install and terminate Vac
liquidtight conduit and wiring
. Double doors, install and terminate
Vac liquidtight conduit and wiring
. Single door, install PVC reducer fitting
and PVC pipe
. Single door, route accessory wiring into
cement case
. Double doors, install PVC reducer fittings
and PVC pipe
. Double doors, route accessory wiring into
cement cases
. Double doors, install case to case Vac
cable
. Rotate cement case spindle to enable
door hanging
.. Set braking circuit plug position
.. Set AS installation type parameter
.. Initiate learning cycle to rotate spindle
to door hanging position
. Set operator spring tension
. Install program switch panel
Install RJ plate assembly (double doors
only)
. Hang door
. Reinstall cement case cover
. Final anchoring cement pour
. Remove cement case cover for ED
commissioning
. Cement case chain tension
. Cement case spindle height adjustment
. Spindle centering
Measure door width, set reveal depth
. Door width parameter Tb
. Tb parameter values
Set reveal depth
. Reveal depth parameter rd
. rd parameter values
Power fail closing speed
. Set power fail closing speed
Parameters
. Parameters
Single door first commissioning
. First commissioning
. Set configuration parameter
. Verify driving parameters for low energy
operation
. Perform learning cycle
Double door first commissioning
. Separately commission active and passive
doors
. Set operator parameters for double door
operation
. Connect communication cable between
operators
Connect accessory wiring
. Connect accessory wiring, single door
. Connect accessory wiring, double doors
ANSI/BHMA standards
. A. Low energy power operated
doors
Install cement case cover
. Install cement case cover
Install door threshold
. Install door threshold
Install door signage
. Install door signage
Upgrade cards
. Upgrade cards
. Container module
. Installing upgrade cards
Appendix A - Wiring diagrams
A. DX-C Key Switch Panel with
RJ connector
A. DX-C Key Switch Panel