5. Before fitting the unhanded door post, offer the glass panels to the door (see glazing plan in
booklet for glass size guide on door), slide them in from the side. Carefully attach the unhand-
ed door post in the same way as before, ensuring the glass is sitting in the correct position
(sitting on the beading channels of the door posts) before tightening the screws.
6. Make sure all angles are square and tighten all screws.
Now insert 2 glazing clips to the glass on the unhanded
door post. The handed door posts are clipped using the 6
pieces of clip capping (no metal clips) found in the
greenhouse box (3 per door). The clip capping should be
cut to the length of the glass, and pushed into the cavity
between the frame of the door and the glass, so as to
wedge the glass to the back frame of the door. See dia-
gram for final resting position of the clip capping.
7. Fix each door wheel into position by pushing the bolt
provided through the centre of the wheel and then
through the hole in the top door panel from underneath (i.e.
from the inside of the door). Put the washer over the bolt
and secure with the nut provided, tightening until there is
no movement on the bolt. The nuts are lock-nuts and are
harder to put on than normal nuts in general assembly. The
wheel will revolve freely because it has ball bearings in it.
The wheel has a collar protruding from the centre, this
collar goes against the inside face of the top door panel.
(See picture).
8. Slip the nylon door skids on each of the bottom panels. This
may already have been done prior to delivery. After fitting
the doors (see later in the booklet), you may need to lower the door skid so that it engages with
the bottom door cill to allow smooth movement of the door. Lower the skid on each door and
insert a self tapping screw at each end of the skid to reinforce the position.
9. Build the right hand door using the remaining handed and unhanded door post. Viewed from
the outside, the handed door post will be on the left of the door, while the unhanded door post
will be on the right. At this point you must decide the height you would like your door lock.
The hole to take the door lock is on the left hand side of the infill panel. You can decide to fit
this panel to the 2nd or 3rd panel down. Make sure you fit the glass before final fixing of
the door. See glazing plan towards the back of this booklet.
10. Thread the stainless steel backed brush extruder into the PVC carrier. This may already have
been done prior to delivery.
11. Turn the doors over and insert the black brush draught excluder in the groove (bolt slot) in the
unhanded door posts. Insert a nut and bolt at the bottom of each unhanded door post and tight-
en so that the brush will not slip down when the door is in its upright position. Cut off the sur-
plus brush and carrier at the top of the bar.
12. Do not fit the door to the gable at this stage – wait until the structure is fully assembled prior
to glazing.
Video’s of the assembly can be found at www.elite-greenhouses.co.uk