manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. oGrow
  6. •
  7. Greenhouse Kit
  8. •
  9. oGrow OGAL-666A User manual

oGrow OGAL-666A User manual

Other oGrow Greenhouse Kit manuals

oGrow OGAL-466A User manual

oGrow

oGrow OGAL-466A User manual

oGrow OGAL-CF23 User manual

oGrow

oGrow OGAL-CF23 User manual

oGrow OGAL-866 User manual

oGrow

oGrow OGAL-866 User manual

oGrow OGAL-46 User manual

oGrow

oGrow OGAL-46 User manual

oGrow OG6834-S User manual

oGrow

oGrow OG6834-S User manual

oGrow Walk-in OGAL-666 User manual

oGrow

oGrow Walk-in OGAL-666 User manual

oGrow OG03AL86-BKE User manual

oGrow

oGrow OG03AL86-BKE User manual

oGrow OGAL-46A User manual

oGrow

oGrow OGAL-46A User manual

oGrow Walk-in OGAL-466 User manual

oGrow

oGrow Walk-in OGAL-466 User manual

oGrow OGAL-866A Quick start guide

oGrow

oGrow OGAL-866A Quick start guide

oGrow OG03-PE5565E User manual

oGrow

oGrow OG03-PE5565E User manual

Popular Greenhouse Kit manuals by other brands

Dancover TITAN Arch 196 manual

Dancover

Dancover TITAN Arch 196 manual

ACD PRESTIGE MR3 H manual

ACD PRESTIGE

ACD PRESTIGE MR3 H manual

Vitavia VA0040-TRP Assembly instructions

Vitavia

Vitavia VA0040-TRP Assembly instructions

VegTrug Nursery manual

VegTrug

VegTrug Nursery manual

Riverstone Networks Monticello 041315V Assembly instructions

Riverstone Networks

Riverstone Networks Monticello 041315V Assembly instructions

CLIMA POD Spirit V7 Series Assembly instructions

CLIMA POD

CLIMA POD Spirit V7 Series Assembly instructions

Vitavia GAIA JUMBO Assembly instructions

Vitavia

Vitavia GAIA JUMBO Assembly instructions

Palram Harmony 6'x4' Assembly instructions

Palram

Palram Harmony 6'x4' Assembly instructions

ClearSpan Storage Master 104598 instruction manual

ClearSpan

ClearSpan Storage Master 104598 instruction manual

Sproutwell GRANGE - 5 Assembly instructions

Sproutwell

Sproutwell GRANGE - 5 Assembly instructions

STC Easy Grow 6x12 Greenhouse Assembly instructions

STC

STC Easy Grow 6x12 Greenhouse Assembly instructions

Growhouse Lean To 6 x 8 Erection and Glazing Instructions

Growhouse

Growhouse Lean To 6 x 8 Erection and Glazing Instructions

Riverstone Networks Grower's 181010V Assembly instructions

Riverstone Networks

Riverstone Networks Grower's 181010V Assembly instructions

GrowSpan 500 Series manual

GrowSpan

GrowSpan 500 Series manual

Stocker 9641/2 manual

Stocker

Stocker 9641/2 manual

Outsunny 845-421V02 manual

Outsunny

Outsunny 845-421V02 manual

ACD Piccolo 03 manual

ACD

ACD Piccolo 03 manual

Riverstone Networks MONT-8 Assembly instructions

Riverstone Networks

Riverstone Networks MONT-8 Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

OGAL-666A
GREENHOUSE ASSEMBLY
www.kshbrands.com
suppor[email protected]
1.888.965.3331
INSTRUCTIONS
www.kshbrands.com [email protected] 1.888.965.3331
Notes:
1. It takes about 2-3 hours to assemble the greenhouse by 2-3 persons.
2.The UV-protected side of the sheet is covered with opal white film and
must face towards the sun.
3.Remove approximately 2 inches of film from all sheet edges before
installing.Removing all film immediately after the construction is
completed
4.Make sure the greenhouse is located on a flat, level surface.
TO PREVENT INJURY, READ AND UNDERSTAND THE
GREENHOUSE ASSEMBLY INSTRUCTIONS BEFORE USE.
GENERAL SAFETY, WARNINGS AND PRECAUTIONS
KEEP WORK AREA CLEAN AND DRY.
Cluttered, damp or wet work areas invite injuries.
STAY ALERT. Watch what you are doing at all times. Use common
sense. Do not use the greenhouse when you are tired or distracted from
the job at hand. It is recommended to use gloves for assembling the
greenhouse.
MAINTAIN THIS PRODUCT WITH CARE.
Keep the greenhouse clean and dry for better performance:
maintenance should be performed regularly.
USE THE RIGHT PRODUCT FOR THE JOB.
Do not attempt toforce a small product to do the work of a larger
industrial product. There are certain applications for which the
greenhouse was designed. It will do the job better and more safely in the
manner for which it was intended. Do not modify the greenhouse and do
not use the greenhouse for a purpose for which it was not intended.
MAINTAIN A SAFE WORKING ENVIRONMENT.
Keep the work area tidy. Make sure there is adequate surrounding
workspace. Avoid high traffic areas. Always keep the work area free of
obstructions, grease, oil, trash and other debris.
PROPER GREENHOUSE LOCATION.
Make sure the greenhouse is located on a flat, level surface.
TO PREVENT INJURY, PLEASE READ AND UNDERSTAND THE
GREENHOUSE ASSEMBLY INSTRUCTIONS MANUAL BEFORE
USE.
Notes:
1. Around 2-3 hours is needed to assemble the greenhouse by 2-3
individuals.
2. The UV-protected side of the panel sheets is covered with opal
white film and must be placed facing the sun.
3. Before installing the sheets, remove around 2 inches of film from all
the edges. Once the construction is completed, remove the the entire
film immediately.
4. Ensure that the greenhouse is located on a flat and level surface.
GENERAL SAFETY, WARNINGS AND PRECAUTIONS
KEEP WORKING AREA CLEAN AND DRY.
Cluttered, damp or wet working areas invite injuries.
BE ALERT. Always be cautious of your actions. Use your common
sense. Do not assemble the structure if you are tired or distracted.
Use gloves when assembling the greenhouse.
HANDLE THIS PRODUCT WITH CARE
Keep the greenhouse clean and dry to maintain better performance.
Also, regular maintenance must be done.
USE THE SUITABLE TOOLS FOR THE JOB
Do not use small tools in lieu of larger ones. Tools are not suitable for
every type of work. The greenhouse is designed in order to provide
better condition and safety. So, do not perform any modification on
the greenhouse. Do not use it aside from its intended purpose.
MAINTAIN A SAFE WORKING ENVIRONMENT
Keep your working area clean and organized. Make sure that there is
enough space for you to work on. Avoid crowded areas. Also, keep
source of obstruction, grease, oil or trash far from your working zone.
PROPER GREENHOUSE LOCATION
Place the greenhouse on a flat and level surface.
6X6FT
79 inches x 76 inches x 75 inches
OGAL-666A
www.kshbrands.com [email protected] 1.888.965.3331
Notes:
1. It takes about 2-3 hours to assemble the greenhouse by 2-3 persons.
2.The UV-protected side of the sheet is covered with opal white film and
must face towards the sun.
3.Remove approximately 2 inches of film from all sheet edges before
installing.Removing all film immediately after the construction is
completed
4.Make sure the greenhouse is located on a flat, level surface.
TO PREVENT INJURY, READ AND UNDERSTAND THE
GREENHOUSE ASSEMBLY INSTRUCTIONS BEFORE USE.
GENERAL SAFETY, WARNINGS AND PRECAUTIONS
KEEP WORK AREA CLEAN AND DRY.
Cluttered, damp or wet work areas invite injuries.
STAY ALERT. Watch what you are doing at all times. Use common
sense. Do not use the greenhouse when you are tired or distracted from
the job at hand. It is recommended to use gloves for assembling the
greenhouse.
MAINTAIN THIS PRODUCT WITH CARE.
Keep the greenhouse clean and dry for better performance:
maintenance should be performed regularly.
USE THE RIGHT PRODUCT FOR THE JOB.
Do not attempt toforce a small product to do the work of a larger
industrial product. There are certain applications for which the
greenhouse was designed. It will do the job better and more safely in the
manner for which it was intended. Do not modify the greenhouse and do
not use the greenhouse for a purpose for which it was not intended.
MAINTAIN A SAFE WORKING ENVIRONMENT.
Keep the work area tidy. Make sure there is adequate surrounding
workspace. Avoid high traffic areas. Always keep the work area free of
obstructions, grease, oil, trash and other debris.
PROPER GREENHOUSE LOCATION.
Make sure the greenhouse is located on a flat, level surface.
TO PREVENT INJURY, PLEASE READ AND UNDERSTAND THE
GREENHOUSE ASSEMBLY INSTRUCTIONS MANUAL BEFORE
USE.
Notes:
1. Around 2-3 hours is needed to assemble the greenhouse by 2-3
individuals.
2. The UV-protected side of the panel sheets is covered with opal
white film and must be placed facing the sun.
3. Before installing the sheets, remove around 2 inches of film from all
the edges. Once the construction is completed, remove the the entire
film immediately.
4. Ensure that the greenhouse is located on a flat and level surface.
GENERAL SAFETY, WARNINGS AND PRECAUTIONS
KEEP WORKING AREA CLEAN AND DRY.
Cluttered, damp or wet working areas invite injuries.
BE ALERT. Always be cautious of your actions. Use your common
sense. Do not assemble the structure if you are tired or distracted.
Use gloves when assembling the greenhouse.
HANDLE THIS PRODUCT WITH CARE
Keep the greenhouse clean and dry to maintain better performance.
Also, regular maintenance must be done.
USE THE SUITABLE TOOLS FOR THE JOB
Do not use small tools in lieu of larger ones. Tools are not suitable for
every type of work. The greenhouse is designed in order to provide
better condition and safety. So, do not perform any modification on
the greenhouse. Do not use it aside from its intended purpose.
MAINTAIN A SAFE WORKING ENVIRONMENT
Keep your working area clean and organized. Make sure that there is
enough space for you to work on. Avoid crowded areas. Also, keep
source of obstruction, grease, oil or trash far from your working zone.
PROPER GREENHOUSE LOCATION
Place the greenhouse on a flat and level surface.
6X6FT
79 inches x 76 inches x 75 inches
OGAL-666A
www.kshbrands.com [email protected] 1.888.965.3331
Notes:
1. Remove approximately 2 inches of film from all the sheet edges prior to installation.
Upon completion, immediately remove all the remaining film.
2. The UV-protected side of the sheet, which is covered with opal white film, must face
the sun.
Front
Rear
www.kshbrands.com [email protected] 1.888.965.3331
Notes:
1. Remove approximately 2 inches of film from all the sheet edges prior to installation.
Upon completion, immediately remove all the remaining film.
2. The UV-protected side of the sheet, which is covered with opal white film, must face
the sun.
Front
Rear
1 | OGAL-666A ASSEMBLY INSTRUCTIONS
www.kshbrands.com [email protected] 1.888.965.3331
1.1 Create a right angle by positioning
the parts of F-03b and F-04. However,
make sure that the grooves of F-03b and
F-04 are placed outside.
1.2 Form a right angle using two F-04
parts, but ensure that the edges of
these pieces are located on the
outside.
These are the parts used in this section.
Image
Item No.
Qty
www.kshbrands.com [email protected] 1.888.965.3331
These are the parts used in this section.
Image
Item No.
Qty
2.1.1 Insert the F-B14 bolts into the holes.
2.1.2 From the top, insert F-05 into the
previously placed F-B14 bolts.
2.1.3 and 2.1.4 Tighten and secure with nuts.
3
3.1.2 Connect F-05, F-19b, F-18 by
the upper bolt. Once the notch on
F-19b is aligned with the top of F-05,
you can screw the nut tight on the bolt.
OGAL-666A ASSEMBLY INSTRUCTIONS | 4
www.kshbrands.com [email protected] 1.888.965.3331
These are the parts used in this section.
3.1.1 Insert two bolts into F-05 and cross
its upper bolt to the lowest hole of F-19b.
3.1.2 When the notch of F-19b is
already aligned with the top of F-05,
tighten and secure with a nut.
3.2 Follow the same process performed in figure 3.1.
Image
Item No.
Qty
4.1 Connect F-18 and F-29 to F-05 using
bolts and nuts. When connecting these
pieces, maintain a 3/4 of an inch distance
from the bolts to the top of F-05.
4.2 Using bolts and nuts, connect F-29 to
F-04.
NOTE: Do not tighten the nuts yet.
These are the parts used in this section.
Image
Item No.
Qty
5 | OGAL-666A ASSEMBLY INSTRUCTIONS
www.kshbrands.com [email protected] 1.888.965.3331
6.1 Insert F-08, F-09, F-10 and F-11 into the
bolt and secure it with nuts.
6.2 Individually insert one bolt into F-08
and F-09. Then, connect F-18 to F-08 and
F-09 and tighten using bolts and nuts.
6.3 Insert one bolt each
into F-10 and F-11.
Connect F-17 to F-10
and F-11 with bolts and
nuts. Afterwards,
connect F-17 to F-05
through the hole
mentioned in step 5.3
using a bolt and nut.
These are the parts used in this section.
Image
Item No.
Qty
5.1 Connect F-30 and F-05 to
the lowest notch of F-19b
using bolts and nuts.
NOTE: Align the top of F-05
with the notch of F-19b.
5.2 Using bolts and nuts, connect F-30 to F-04.
NOTE: Do not tighten the nuts yet.
5.3 Insert two bolts into
F-05, then, connect F-30
and F-05 to the lowest
notch of F-19b using the
lower bolt and nut. next,
insert the above bolt to
the remaining lower hole
of F-19b.
NOTE: The notch of F-19
must be aligned with the
top of F-05.
These are the parts used in this section.
Image
Item No.
Qty