Installation
• The regulator is installed on horizontal pipeline. 
Version with slam shut, the release relay is situated 
towards the bottom (see schematic).
• Installation according to EN12186 recommended.
• Installaccordingtodirectionofuidow(arrow).
• When assembling with adjacent elements care 
must be taken not to create pressure force on the 
body and the assembling elements (bolts, O-rings, 
anges)shouldbecompatiblewiththegeometryand
working conditions of the equipment.
• If the case arises a support must be used to avoid 
pressure force on the body (a support can be installed 
undertheanges).
• Version with integral slam shut , connect the safety 
manometric box (IS) to the impulse at 4D on a straight 
run of the outlet pipe.
• It is recommended to separate the slam shut impulse 
line (IS) from that of the pilot (IP). Do not connect the 
impulses on the lower generator line.
• It is recommended to install an isolation valve and an 
atmospheric valve, which can be useful for slam shut 
trippingandverications.
•Nomodicationshouldbemadetothestructureof
the equipment (drilling, grinding, soldering...).
• It is recommended to install a servicing valve on the 
outlet pipeline to facilitate adjustments and bleeding 
off to the atmosphere.
•Verify that the inlet side is protected by an 
appropriate device(s) to avoid exceeding the limits of 
utilization (PS, TS).
•Verify that the limits of utilization correspond to the 
appropriate operating conditions.
•Version with integral slam shut, verify that the safety 
manometric box (BMS) and spring correspond to the 
appropriate operating conditions on the outlet side 
of the regulator.
•The equipment should not receive any type of shock, 
especially the release relay.
•The user should verify or carry out a protection 
adapted to the environment.
•Fire, seismic and lightening are not taken into 
consideration in standard regulators. If required, a 
specialproductselectionand/orspeciccalculations
maybesuppliedaccordingtospecicrequirements.
• Version without integral slam shut, verify that a 
pressure limiting device on the outlet side of the 
regulator guarantees a pressure limit inferior or 
equal to the pilot PS.
Allinterventionsontheequipmentshouldonlybeperformedbyqualiedandtrainedpersonnel.