INSTALLATION
•The regulator is installed on horizontal (recommended) or
vertical pipeline. Version with slam shut, the release relay
can be situated towards the bottom or the top.
•Installation according to EN12186 or EN12279 recom-
mended.
•Install according to direction of fluid flow (arrow).
•When assembling with adjacent elements care must be
taken not to create pressure force on the body and the
assembling elements (bolts, O-rings, flanges) should be
compatible with the geometry and working conditions of
the equipment.
•If the case arises a support must be used to avoid
pressure force on the body (a support can be installed
under the flanges).
•Connect the actuator (ISM) to the impulse at 4D minimum
on a straight run of the outlet pipe.
•Version with integral slam shut, connect the safety
manometric box (IS) to the impulse at 4D on a straight run
of the outlet pipe.
•It is recommended to separate the slam shut impulse line
(IS) from that of the actuator (ISM). Do not connect the
impulses on the lower generator line.
•Version with integral slam shut, it is recommended to
install an isolation valve (R1) and an atmospheric valve
(R2), which are useful for tripping and verifications.
•No modification should be made to the structure of the
equipment (drilling, grinding, soldering...).
•It is recommended to install a servicing valve (R3) on the
outlet pipeline to facilitate adjustments and bleeding off to
theatmosphere.
•Verify that the inlet side is protected by an appropriate
device(s) to avoid exceeding the limits of utilization (PS, TS).
•Verify that the limits of utilization correspond to the appro-
priate operating conditions.
•Version without slam shut, verify that a pressure limiting
device on the outlet side of the regulator guarantees a
pressure limit < or equal to the actuator PS.
•Versionwith slam shut,verify thatthe springs (forVSX2), and
the safety manometric box (BMS) and its spring (for OS2)
correspond to the appropriate operating conditions on the
outlet side of the regulator.
•The equipment should not receive any type of shocks.
•Fire, seismic and lightening are not taken into consideration
for standard regulators. If required, a special product selec-
tion and/or specific calculations may be supplied according
to specific requirements.
•The user should verify or carry out a protection adapted to
the environment.
•Versionwith slam shut, ifthe outlet sideis subject tothe PED
and not protected by any other means, verify that no compo-
nent is superior to category 1.
All interventions on the equipment should only be performed by
qualified and trained personnel.
!
WARNING
!
WARNING
C98
CAUTION
Europe, Middle East, and Africa Document Only