a. Peel the removable serial number label from each Microinverter.
E
a.Mount the PV modules above the Microinverter.
b.Connect the DC cables of PV modules to the DC input of the Microinverter.
WARNING:
NOTE:
The Max. open circuit voltage under the temperature
of must not exceed the Max. input voltage of the -40℃
Microinverter.
Make sure to not split positive and negative DC
cables into two different input channels.
1.If the DC cable is too short for installation, use the
DC Extension Cable to connect PV modules to
Microinverter, otherwise the PV terminals will be
damaged. It is recommended to use PV cable (PV1-F).
2.The total length of PV cable must not exceed 5m.
3.The Microinverter (including DC and AC connectors)
should avoid direct exposure to sunlight, rain or snow.
Do not place the Microinverter in the gap between PV
modules. Reserve a clearance of at least 20mm around
the Microinverter to ensure sufficient space for
ventilation and heat dissipation.
E
Post-installation Checklist
All DC connectors are connected to PV modules securely
The Microinverter's AC output cable is properly connected to the trunk cable
Unused Sub AC ports on the trunk cable are sealed with AC trunk port cap
The AC trunk cable end is sealed with the end cap
The ground wire is properly installed(optional)
The installation map is completed
The monitoring system is working properly
a.Push the Microin AC Sub Connector verter to the AC Trunk Connector. Make sure to hear the "click" as proof of a robust connection.
b.Connect the AC end cable to the distribution panel, and wire it to the local grid network.
c.Please plug the AC Trunk Port Cap in any vacant AC Trunk Port to prevent from water and
dust.
Step 4. Complete the AC Connection
Step 5. Create an Installation Map
Step 6. Connect PV Modules
b.Affix the serial number label to the respective location on the installation map (refer to the appendix), according to the layout on the roof.
Step 9. Post-installation Checks
Hangcheng Ave, Bao’an District, Shenzhen, China
Click
Click
Click
S/N:GXL0M7E004
S/N:GXL0M7E004
S/N:DBN0M7E004
S/N:DBN0M7E004
a. Turn on the AC breaker of the branch circuit.
b. Turn on the main AC breaker. Your system will start producing
power in about two minutes.
Please refer to the ShineWeLink Quick Guide or WiFi Configuration
Guide to set up the monitoring system.
Step 7. Energize the system Step 8. Set up the Monitoring System