
Maintenance manual
Honeywell
Maintenance and assembly manual underground gas pressure reducing station
Type: COCON26 DRA-LP/MP A/S page 18
2.8 Assembly of Regulator Pilot, Safety Relief Valve and Measuring
Devices such as Vent and Pressure Relief Pipes.
NOTE: You will need a regulator pilot: RP-LP/MP, shut-off relay 050-LP(D)/MP(D) and safety shut-
off valve AV-LP/MP before starting with the assembly as stated in this chapter. Use the test
casing on assembly.
A measuring sleeve for the inlet pressure (17) is to be secured to the casing with two hex socket head
screws (8). The inlet pressure measuring sleeve is positioned on the high pressure side of the station.
Assembly of the Inlet Pressure Measuring Sleeve (17)
- Attach the ball vales (1) to the end of the inlet pressure measuring sleeve (17) with
a straight pipe fitting with a thread (2).
- Fix the inlet pressure gauge (14) with fittings (16 and 17) to the side of the inlet pressure measuring
sleeve.
- Place the seal ring (9) into the areas underneath the measuring sleeves.
Assembly of the Outlet Pressure Measuring Sleeve (26)
A measuring sleeve for the outlet pressure (26) is to be secured to the casing with two hex socket head
screws (10) after the gas regulating station and safety unit have been installed. The measuring sleeve
secures this cartridge. The outlet pressure measuring sleeve is positioned on the low pressure side of the
station.
- An outlet pressure gauge (20) is mounted to the top side of the outlet pressure measuring sleeve
(26) with a reduction sleeve (26).
- Place the seal rings (27) into the areas underneath the measuring sleeves.
NOTE: Make sure that all connecting pieces are sufficiently greased with a gas-resistant gel suitable
for pneumatic applications.
Assembly of the Pilot and the Outlet Pressure Measuring Sleeve (26)
- Screw the vertical part of the adjustable angle fitting (2) into the connection piece (02.07Pos. 6).
Ensure that the fitting is horizontally mounted.
- Turn this component in such a way that the adjustable angle fitting points to the left.
- Attach connection ‘1’ of the regulator pilot RP-LP/MP to the adjustable angle fitting with the straight
screw-in socket.
There are two arrows on the cover of the cartridge (02.04 Pos. 40). Turn the internal part in such a way that
the arrow, which points in the direction of the gas flow (---->), points to the right. There is a connection on the
cover of the cartridge:
Connection M1 (12.00 hour position): gas pressure regulating connection. (1/4”BSP)
- Secure the pipe (15) to connection ‘3’ of the regulator pilot RP-LP/MP with an angle pipe fitting with
a thread (1, and 52)
- Secure the other end of this pipe to connection ‘M1’ on the cover of the cartridge with an
adjustable angle fitting (52) and valve (51).
- Fix pipes (14) and (25) to the T connector (24).