2. After routing cables and verifying cable
connections, seal the gap between cables and
the cabinet using sealing putty. (Remove the
paper protective film from the sealing putty.)
Dustproof cover
7(02311FTC-001 and 02311FTE-002) ATS Commissioning
Before System Power-On
1. Only electrical professionals are allowed to install and maintain the ATS.
2. The generator can be connected only to power supply 2 (LN 2)-switch II. If the generator is
configured, power supply 2 (LN 2)-switch II cannot be set as the preferred power supply.
3. Do not open any cover of the ATS. Even if the power supply is disconnected, hazardous
external control voltage may still exist inside the product.
4. Do not adjust the control cable when the ATS or external control cable is electrified.
5. Do not replace the fuse (F1) with another model. Only fuses labeled with the same model can
be used as replacements.
6. When the ATS is connected to the electric loop, do not attempt to install or maintain the device.
7. Before performing maintenance tasks, ensure that the power supply to the switch is
disconnected.
3. After verifying the installation, reinstall all
the covers. After the installation is complete,
reinstall the dustproof cover to prevent dust
inside if the UPS is not to be powered on
immediately.
1. Before power-on, operate the handle to switch on and off the ATS for one to three times.
Ensure that the primary and secondary contacts of the ATS work smoothly.
2. Before power-on, check that the phase sequence of the two power supplies for the ATS is
correct using a phase sequence meter.
Perform system commissioning and power-on strictly according to the system manual and ATS
instructions. For any changes in operations and parameters, consult Huawei engineers.
Otherwise, system commissioning or power-on may fail, or even the cabinet is damaged.