2.4.2 Parallel System................................................................................................................................................................... 59
2.4.3 Dual-Bus System................................................................................................................................................................ 59
2.5 Optional Components......................................................................................................................................................... 60
3 Installation..............................................................................................................................62
3.1 Installation Preparations.................................................................................................................................................... 62
3.1.1 Site.......................................................................................................................................................................................... 62
3.1.1.1 UPS Dimensions............................................................................................................................................................. 62
3.1.1.2 Installation Environment............................................................................................................................................. 63
3.1.1.3 Installation Clearances................................................................................................................................................. 64
3.1.2 Tools....................................................................................................................................................................................... 65
3.1.3 Power Cables.......................................................................................................................................................................69
3.1.4 SPD......................................................................................................................................................................................... 76
3.1.5 Transportation, Unpacking, and Checking................................................................................................................ 76
3.1.6 (Optional) Splitting the Power Cabinet and Bypass Cabinet (400 kVA, 500 kVA, or 600 kVA UPS)... 77
3.1.7 (Optional) Combining the Power Cabinet and Bypass Cabinet (400 kVA, 500 kVA, or 600 kVA UPS)
............................................................................................................................................................................................................ 83
3.2 Installing a Single UPS........................................................................................................................................................ 84
3.2.1 Installing a UPS (400 kVA, 500 kVA, or 600 kVA UPS)........................................................................................ 84
3.2.1.1 Installing the UPS on the Ground............................................................................................................................ 85
3.2.1.2 Installing the UPS on Channel Steel........................................................................................................................89
3.2.2 Installing a UPS (800 kVA).............................................................................................................................................90
3.2.2.1 Installing the UPS on the Ground............................................................................................................................ 90
3.2.2.2 Installing the UPS on Channel Steel..................................................................................................................... 100
3.2.3 Installing Batteries.......................................................................................................................................................... 101
3.2.4 Installing Optional Components................................................................................................................................ 102
3.2.4.1 Installing an IP21 Component.................................................................................................................................102
3.2.4.2 Installing a 4G Module or Network Cable.......................................................................................................... 103
3.2.4.3 Installing T/H Sensors and Cables......................................................................................................................... 105
3.2.4.4 Connecting the BCB Box............................................................................................................................................106
3.2.4.5 Connecting the BBB Box............................................................................................................................................106
3.2.4.6 Installing a Battery Grounding Failure Detector...............................................................................................107
3.2.4.7 Connecting the iBAT................................................................................................................................................... 108
3.2.5 Cable Routing Requirements...................................................................................................................................... 109
3.2.6 Routing Cables (400 kVA, 500 kVA, or 600 kVA UPS)....................................................................................... 110
3.2.6.1 Top Cable Routing....................................................................................................................................................... 111
3.2.6.2 Bottom Cable Routing............................................................................................................................................... 121
3.2.7 Routing Cables (800 kVA UPS).................................................................................................................................. 127
3.2.7.1 Top Cable Routing....................................................................................................................................................... 128
3.2.7.2 Bottom Cable Routing............................................................................................................................................... 135
3.2.8 Connecting a Remote EPO Switch............................................................................................................................ 143
3.2.9 Connecting Communications Cables........................................................................................................................ 144
3.3 Installing a Parallel System............................................................................................................................................. 144
UPS5000-E-(400 kVA-800 kVA)
User Manual (50 kVA Power Modules) Contents
Issue 17 (2023-07-10) Copyright © Huawei Digital Power Technologies Co., Ltd. v