IBM Power Systems 8005-12N Instruction Manual

Power Systems
Installing the 8005-12N
IBM


Power Systems
Installing the 8005-12N
IBM

Note
Before using this information and the product it supports, read the information in “Safety notices” on page v, “Notices” on
page 9, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, Z125–5823.
This edition applies to IBM Power Systems™servers that contain the POWER8®processor and to all associated
models.
© Copyright IBM Corporation 2017.
US Government Users Restricted Rights – Use, duplication or disclosure restricted by GSA ADP Schedule Contract
with IBM Corp.

Contents
Safety notices ................................. v
Installing the 8005-12N system .......................... 1
Prerequisites for installing the 8005-12N system ....................... 1
Completing inventory for your system and verifying that your components are fully seated......... 2
Determining and marking the location in the rack for the 8001-12C system .............. 2
Attaching the rails to the system chassis and to the rack..................... 4
Installing the system into the rack and applying power ..................... 5
Creating or expanding the cluster ............................ 6
Notices .................................... 9
Accessibility features for IBM Power Systems servers ..................... 10
Privacy policy considerations ............................. 11
Trademarks ................................... 12
Electronic emission notices .............................. 12
Class A Notices ................................. 12
Class B Notices ................................. 16
Terms and conditions ................................ 19
© Copyright IBM Corp. 2017 iii

iv Power Systems: Installing the 8005-12N

Safety notices
Safety notices may be printed throughout this guide:
vDANGER notices call attention to a situation that is potentially lethal or extremely hazardous to
people.
vCAUTION notices call attention to a situation that is potentially hazardous to people because of some
existing condition.
vAttention notices call attention to the possibility of damage to a program, device, system, or data.
World Trade safety information
Several countries require the safety information contained in product publications to be presented in their
national languages. If this requirement applies to your country, safety information documentation is
included in the publications package (such as in printed documentation, on DVD, or as part of the
product) shipped with the product. The documentation contains the safety information in your national
language with references to the U.S. English source. Before using a U.S. English publication to install,
operate, or service this product, you must first become familiar with the related safety information
documentation. You should also refer to the safety information documentation any time you do not
clearly understand any safety information in the U.S. English publications.
Replacement or additional copies of safety information documentation can be obtained by calling the IBM
Hotline at 1-800-300-8751.
German safety information
Das Produkt ist nicht für den Einsatz an Bildschirmarbeitsplätzen im Sinne § 2 der
Bildschirmarbeitsverordnung geeignet.
Laser safety information
IBM®servers can use I/O cards or features that are fiber-optic based and that utilize lasers or LEDs.
Laser compliance
IBM servers may be installed inside or outside of an IT equipment rack.
DANGER: When working on or around the system, observe the following precautions:
Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid
a shock hazard:
vIf IBM supplied the power cord(s), connect power to this unit only with the IBM provided power cord.
Do not use the IBM provided power cord for any other product.
vDo not open or service any power supply assembly.
vDo not connect or disconnect any cables or perform installation, maintenance, or reconfiguration of this
product during an electrical storm.
vThe product might be equipped with multiple power cords. To remove all hazardous voltages,
disconnect all power cords.
– For AC power, disconnect all power cords from their AC power source.
– For racks with a DC power distribution panel (PDP), disconnect the customer’s DC power source to
the PDP.
vWhen connecting power to the product ensure all power cables are properly connected.
© Copyright IBM Corp. 2017 v

– For racks with AC power, connect all power cords to a properly wired and grounded electrical
outlet. Ensure that the outlet supplies proper voltage and phase rotation according to the system
rating plate.
– For racks with a DC power distribution panel (PDP), connect the customer’s DC power source to
the PDP. Ensure that the proper polarity is used when attaching the DC power and DC power
return wiring.
vConnect any equipment that will be attached to this product to properly wired outlets.
vWhen possible, use one hand only to connect or disconnect signal cables.
vNever turn on any equipment when there is evidence of fire, water, or structural damage.
vDo not attempt to switch on power to the machine until all possible unsafe conditions are corrected.
vAssume that an electrical safety hazard is present. Perform all continuity, grounding, and power checks
specified during the subsystem installation procedures to ensure that the machine meets safety
requirements.
vDo not continue with the inspection if any unsafe conditions are present.
vBefore you open the device covers, unless instructed otherwise in the installation and configuration
procedures: Disconnect the attached AC power cords, turn off the applicable circuit breakers located in
the rack power distribution panel (PDP), and disconnect any telecommunications systems, networks,
and modems.
DANGER:
vConnect and disconnect cables as described in the following procedures when installing, moving, or
opening covers on this product or attached devices.
To Disconnect:
1. Turn off everything (unless instructed otherwise).
2. For AC power, remove the power cords from the outlets.
3. For racks with a DC power distribution panel (PDP), turn off the circuit breakers located in the
PDP and remove the power from the Customer's DC power source.
4. Remove the signal cables from the connectors.
5. Remove all cables from the devices.
To Connect:
1. Turn off everything (unless instructed otherwise).
2. Attach all cables to the devices.
3. Attach the signal cables to the connectors.
4. For AC power, attach the power cords to the outlets.
5. For racks with a DC power distribution panel (PDP), restore the power from the Customer's DC
power source and turn on the circuit breakers located in the PDP.
6. Turn on the devices.
Sharp edges, corners and joints may be present in and around the system. Use care when handling
equipment to avoid cuts, scrapes and pinching. (D005)
(R001 part 1 of 2):
DANGER: Observe the following precautions when working on or around your IT rack system:
vHeavy equipment–personal injury or equipment damage might result if mishandled.
vAlways lower the leveling pads on the rack cabinet.
vAlways install stabilizer brackets on the rack cabinet.
vTo avoid hazardous conditions due to uneven mechanical loading, always install the heaviest devices
in the bottom of the rack cabinet. Always install servers and optional devices starting from the bottom
of the rack cabinet.
vRack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of
rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them to
stabilize your body position (for example, when working from a ladder).
vi Power Systems: Installing the 8005-12N

vEach rack cabinet might have more than one power cord.
– For AC powered racks, be sure to disconnect all power cords in the rack cabinet when directed to
disconnect power during servicing.
– For racks with a DC power distribution panel (PDP), turn off the circuit breaker that controls the
power to the system unit(s), or disconnect the customer’s DC power source, when directed to
disconnect power during servicing.
vConnect all devices installed in a rack cabinet to power devices installed in the same rack cabinet. Do
not plug a power cord from a device installed in one rack cabinet into a power device installed in a
different rack cabinet.
vAn electrical outlet that is not correctly wired could place hazardous voltage on the metal parts of the
system or the devices that attach to the system. It is the responsibility of the customer to ensure that
the outlet is correctly wired and grounded to prevent an electrical shock.
(R001 part 2 of 2):
CAUTION:
vDo not install a unit in a rack where the internal rack ambient temperatures will exceed the
manufacturer's recommended ambient temperature for all your rack-mounted devices.
vDo not install a unit in a rack where the air flow is compromised. Ensure that air flow is not blocked
or reduced on any side, front, or back of a unit used for air flow through the unit.
vConsideration should be given to the connection of the equipment to the supply circuit so that
overloading of the circuits does not compromise the supply wiring or overcurrent protection. To
provide the correct power connection to a rack, refer to the rating labels located on the equipment in
the rack to determine the total power requirement of the supply circuit.
v(For sliding drawers.) Do not pull out or install any drawer or feature if the rack stabilizer brackets are
not attached to the rack. Do not pull out more than one drawer at a time. The rack might become
unstable if you pull out more than one drawer at a time.
v(For fixed drawers.) This drawer is a fixed drawer and must not be moved for servicing unless specified
by the manufacturer. Attempting to move the drawer partially or completely out of the rack might
cause the rack to become unstable or cause the drawer to fall out of the rack.
Safety notices vii

CAUTION:
Removing components from the upper positions in the rack cabinet improves rack stability during
relocation. Follow these general guidelines whenever you relocate a populated rack cabinet within a
room or building.
vReduce the weight of the rack cabinet by removing equipment starting at the top of the rack
cabinet. When possible, restore the rack cabinet to the configuration of the rack cabinet as you
received it. If this configuration is not known, you must observe the following precautions:
– Remove all devices in the 32U position (compliance ID RACK-001 or 22U (compliance ID RR001)
and above.
– Ensure that the heaviest devices are installed in the bottom of the rack cabinet.
– Ensure that there are little-to-no empty U-levels between devices installed in the rack cabinet
below the 32U (compliance ID RACK-001 or 22U (compliance ID RR001) level, unless the
received configuration specifically allowed it.
vIf the rack cabinet you are relocating is part of a suite of rack cabinets, detach the rack cabinet from
the suite.
vIf the rack cabinet you are relocating was supplied with removable outriggers they must be
reinstalled before the cabinet is relocated.
vInspect the route that you plan to take to eliminate potential hazards.
vVerify that the route that you choose can support the weight of the loaded rack cabinet. Refer to the
documentation that comes with your rack cabinet for the weight of a loaded rack cabinet.
vVerify that all door openings are at least 760 x 230 mm (30 x 80 in.).
vEnsure that all devices, shelves, drawers, doors, and cables are secure.
vEnsure that the four leveling pads are raised to their highest position.
vEnsure that there is no stabilizer bracket installed on the rack cabinet during movement.
vDo not use a ramp inclined at more than 10 degrees.
vWhen the rack cabinet is in the new location, complete the following steps:
– Lower the four leveling pads.
– Install stabilizer brackets on the rack cabinet.
– If you removed any devices from the rack cabinet, repopulate the rack cabinet from the lowest
position to the highest position.
vIf a long-distance relocation is required, restore the rack cabinet to the configuration of the rack
cabinet as you received it. Pack the rack cabinet in the original packaging material, or equivalent.
Also lower the leveling pads to raise the casters off of the pallet and bolt the rack cabinet to the
pallet.
(R002)
(L001)
DANGER: Hazardous voltage, current, or energy levels are present inside any component that has this
label attached. Do not open any cover or barrier that contains this label. (L001)
(L002)
viii Power Systems: Installing the 8005-12N

DANGER: Rack-mounted devices are not to be used as shelves or work spaces. (L002)
(L003)
12
or
!
1
2
or
1 2
34
or
Safety notices ix

1234
or
DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or
multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power
cables. (L003)
(L007)
CAUTION: A hot surface nearby. (L007)
(L008)
xPower Systems: Installing the 8005-12N

CAUTION: Hazardous moving parts nearby. (L008)
All lasers are certified in the U.S. to conform to the requirements of DHHS 21 CFR Subchapter J for class
1 laser products. Outside the U.S., they are certified to be in compliance with IEC 60825 as a class 1 laser
product. Consult the label on each part for laser certification numbers and approval information.
CAUTION:
This product might contain one or more of the following devices: CD-ROM drive, DVD-ROM drive,
DVD-RAM drive, or laser module, which are Class 1 laser products. Note the following information:
vDo not remove the covers. Removing the covers of the laser product could result in exposure to
hazardous laser radiation. There are no serviceable parts inside the device.
vUse of the controls or adjustments or performance of procedures other than those specified herein
might result in hazardous radiation exposure.
(C026)
CAUTION:
Data processing environments can contain equipment transmitting on system links with laser modules
that operate at greater than Class 1 power levels. For this reason, never look into the end of an optical
fiber cable or open receptacle. Although shining light into one end and looking into the other end of
a disconnected optical fiber to verify the continuity of optic fibers many not injure the eye, this
procedure is potentially dangerous. Therefore, verifying the continuity of optical fibers by shining
light into one end and looking at the other end is not recommended. To verify continuity of a fiber
optic cable, use an optical light source and power meter. (C027)
CAUTION:
This product contains a Class 1M laser. Do not view directly with optical instruments. (C028)
CAUTION:
Some laser products contain an embedded Class 3A or Class 3B laser diode. Note the following
information: laser radiation when open. Do not stare into the beam, do not view directly with optical
instruments, and avoid direct exposure to the beam. (C030)
CAUTION:
The battery contains lithium. To avoid possible explosion, do not burn or charge the battery.
Do Not:
v___ Throw or immerse into water
v___ Heat to more than 100°C (212°F)
v___ Repair or disassemble
Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local
regulations. In the United States, IBM has a process for the collection of this battery. For information,
call 1-800-426-4333. Have the IBM part number for the battery unit available when you call. (C003)
Safety notices xi

CAUTION:
Regarding IBM provided VENDOR LIFT TOOL:
vOperation of LIFT TOOL by authorized personnel only.
vLIFT TOOL intended for use to assist, lift, install, remove units (load) up into rack elevations. It is
not to be used loaded transporting over major ramps nor as a replacement for such designated tools
like pallet jacks, walkies, fork trucks and such related relocation practices. When this is not
practicable, specially trained persons or services must be used (for instance, riggers or movers).
vRead and completely understand the contents of LIFT TOOL operator's manual before using.
Failure to read, understand, obey safety rules, and follow instructions may result in property
damage and/or personal injury. If there are questions, contact the vendor's service and support.
Local paper manual must remain with machine in provided storage sleeve area. Latest revision
manual available on vendor's web site.
vTest verify stabilizer brake function before each use. Do not over-force moving or rolling the LIFT
TOOL with stabilizer brake engaged.
vDo not move LIFT TOOL while platform is raised, except for minor positioning.
vDo not exceed rated load capacity. See LOAD CAPACITY CHART regarding maximum loads at
center versus edge of extended platform.
vOnly raise load if properly centered on platform. Do not place more than 200 lb (91 kg) on edge of
sliding platform shelf also considering the load's center of mass/gravity (CoG).
vDo not corner load the platform tilt riser accessory option. Secure platform riser tilt option to main
shelf in all four (4x) locations with provided hardware only, prior to use. Load objects are designed
to slide on/off smooth platforms without appreciable force, so take care not to push or lean. Keep
riser tilt option flat at all times except for final minor adjustment when needed.
vDo not stand under overhanging load.
vDo not use on uneven surface, incline or decline (major ramps).
vDo not stack loads.
vDo not operate while under the influence of drugs or alcohol.
vDo not support ladder against LIFT TOOL.
vTipping hazard. Do not push or lean against load with raised platform.
vDo not use as a personnel lifting platform or step. No riders.
vDo not stand on any part of lift. Not a step.
vDo not climb on mast.
vDo not operate a damaged or malfunctioning LIFT TOOL machine.
vCrush and pinch point hazard below platform. Only lower load in areas clear of personnel and
obstructions. Keep hands and feet clear during operation.
vNo Forks. Never lift or move bare LIFT TOOL MACHINE with pallet truck, jack or fork lift.
vMast extends higher than platform. Be aware of ceiling height, cable trays, sprinklers, lights, and
other overhead objects.
vDo not leave LIFT TOOL machine unattended with an elevated load.
vWatch and keep hands, fingers, and clothing clear when equipment is in motion.
vTurn Winch with hand power only. If winch handle cannot be cranked easily with one hand, it is
probably over-loaded. Do not continue to turn winch past top or bottom of platform travel.
Excessive unwinding will detach handle and damage cable. Always hold handle when lowering,
unwinding. Always assure self that winch is holding load before releasing winch handle.
vA winch accident could cause serious injury. Not for moving humans. Make certain clicking sound
is heard as the equipment is being raised. Be sure winch is locked in position before releasing
handle. Read instruction page before operating this winch. Never allow winch to unwind freely.
Freewheeling will cause uneven cable wrapping around winch drum, damage cable, and may cause
serious injury. (C048)
Power and cabling information for NEBS (Network Equipment-Building System)
GR-1089-CORE
The following comments apply to the IBM servers that have been designated as conforming to NEBS
(Network Equipment-Building System) GR-1089-CORE:
xii Power Systems: Installing the 8005-12N

The equipment is suitable for installation in the following:
vNetwork telecommunications facilities
vLocations where the NEC (National Electrical Code) applies
The intrabuilding ports of this equipment are suitable for connection to intrabuilding or unexposed
wiring or cabling only. The intrabuilding ports of this equipment must not be metallically connected to the
interfaces that connect to the OSP (outside plant) or its wiring. These interfaces are designed for use as
intrabuilding interfaces only (Type 2 or Type 4 ports as described in GR-1089-CORE) and require isolation
from the exposed OSP cabling. The addition of primary protectors is not sufficient protection to connect
these interfaces metallically to OSP wiring.
Note: All Ethernet cables must be shielded and grounded at both ends.
The ac-powered system does not require the use of an external surge protection device (SPD).
The dc-powered system employs an isolated DC return (DC-I) design. The DC battery return terminal
shall not be connected to the chassis or frame ground.
The dc-powered system is intended to be installed in a common bonding network (CBN) as described in
GR-1089-CORE.
Safety notices xiii

xiv Power Systems: Installing the 8005-12N

Installing the 8005-12N system
Learn about how to install, cable, and set up your 8005-12N system.
This section describes, at a high level, the tasks you must perform when you install and configure your
8005-12N system.
To install and configure your system, complete the following high-level tasks:
1. Install the system into your rack.
2. Connect your network cables. To connect your system to the network, complete the following tasks:
a. Identify the IPMI port on the rear of the system and connect a cable from this port into your
network.
b. Identify at least any two other network ports. These nodes have 4x 10GbE RJ45 ports and 4x
10GbE SFP+ to choose from. They will all be logically grouped together, within Nutanix AHV.
c. Plug your cables into the appropriate switch, making sure that the ports are all in the same logical
network segment.
3. Connect the power cables to the power supplies and to the power source.
4. Power on.
Note: You can power on the nodes in any order.
5. Attach the workstation and create clusters.
For more detailed instructions about how to perform these tasks, see the following topics:
Prerequisites for installing the 8005-12N system
Use the information to understand the prerequisites that are required for installing the system.
You might need to read the following documents before you install the server:
vThe latest version of this document is maintained online, see Installing the IBM Power System
8005-12N (http://www.ibm.com/support/knowledgecenter/POWER8/p8eip/
p8eip_installsys_kickoff.htm).
vTo plan your server installation, see Planning for the system (http://www.ibm.com/support/
knowledgecenter/POWER8/p8had/p8had_8xx_kickoff.htm).
Ensure that you have the following items before starting your installation:
vPhillips screwdriver
vFlat-head screwdriver
vBox cutter
vElectrostatic discharge (ESD) wrist strap
vRack with two Electronic Industries Association (EIA) units (2U) of space
Note: If you do not have a rack that is installed, install the rack. For instructions, see Racks and rack
features (http://www.ibm.com/support/knowledgecenter/POWER8/p8hbf/p8hbf_8xx_kickoff.htm).
© Copyright IBM Corp. 2017 1

Completing inventory for your system and verifying that your
components are fully seated
Use this information to complete inventory for your system.
1. Verify that you received all the boxes you ordered.
2. Unpack the server components as needed.
3. Complete a parts inventory before you install each server component by following these steps:
a. Locate the inventory list for your server.
b. Ensure that you received all the parts that you ordered.
Note: Your order information is included with your product. You can also obtain order
information from your marketing representative or the IBM Business Partner.
If you have incorrect, missing, or damaged parts, consult any of the following resources:
vYour IBM reseller.
vIBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only).
vThe Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your
location to view the service and support contact information.
4. Ensure that each of the components in the system are properly seated.
Determining and marking the location in the rack for the 8001-12C
system
You might need to determine where to install the system unit into the rack.
1. Read the Rack safety notices (http://www.ibm.com/support/knowledgecenter/POWER8/p8hbf/
racksafety.htm).
2. Determine where to place the system unit in the rack. As you plan for installing the system unit in a
rack, consider the following information:
vOrganize larger and heavier units into the lower part of the rack.
vPlan to install units into the lower part of the rack first.
vRecord the Electronic Industries Alliance (EIA) locations in your plan.
3. If necessary, remove the filler panels to allow access to the inside of the rack enclosure where you
plan to place the unit, as shown in Figure 1 on page 3.
2Power Systems: Installing the 8005-12N

4. Determine to place the system in the rack. Record the EIA location.
5. Facing the front of the rack and working from the right side, use tape, a marker, or pencil to mark
the lower hole of each EIA unit.
6. Repeat step 5 for the corresponding holes located on the left side of the rack.
7. Go to the rear of the rack.
8. On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of
the rack.
9. Mark the bottom EIA unit.
10. Mark the corresponding holes on the left side of the rack.
Figure 1. Removing the filler panels
Installing the 8005-12N system 3

Attaching the rails to the system chassis and to the rack
You must install the rails onto the chassis and into the rack. Use this procedure to perform this task.
Attention: To avoid rail failure and potential danger to yourself and to the unit, ensure that you have
the correct rails and fittings for your rack. If your rack has square support flange holes or screw-thread
support flange holes, ensure that the rails and fittings match the support flange holes that are used on
your rack. Do not install mismatched hardware by using washers or spacers. If you do not have the
correct rails and fittings for your rack, contact your IBM reseller.
Note: The system requires 1 EIA rack unit (1U) of space.
Ensure that you have the parts you need to install the rails. The following parts are included with the rail
kit:
vSlide rail screws, used to attach the two parts of each slide rail
vSlide rail rack screws, used to secure the rails to the rack
vRails
v10-32 x 0.25” screws, used to attach the rails to system chassis
1. Remove the rail pieces from the packaging and put them on a work surface.
2. Connect the two parts of each rack slide rail. To connect the two parts of the rack slide rail, perform
the following tasks:
a. Identify the two pieces of the left rack slide rail. Align the short and long pieces (C). Ensure that
the rack rail pins are pointing in the same direction (A) and (D).
b. The shorter piece of the rack slide rail has a metal pin. Insert the pin into the hole in the longer
piece of the rack slide rail (B). Slide the shorter piece of the rack rail into the longer piece of the
rack rail.
c. Align the holes in the two pieces of the rack slide rails. Using a Philips-head screwdriver, attach
the two parts by loosely screwing two rail screws through the holes in the rack slide rail.
Note: Do not tighten the rack slide rail screws.
d. Repeat these steps for the right slide rail.
3. Attach the chassis rails to the system chassis. To attach the chassis rails to the system chassis, perform
the following tasks:
4Power Systems: Installing the 8005-12N
Table of contents
Other IBM Power Supply manuals

IBM
IBM S822L User manual

IBM
IBM 9008-22L User manual

IBM
IBM 5786 Use and care manual

IBM
IBM System/370 145 Service manual

IBM
IBM Power System 9009-41A User manual

IBM
IBM V.90 PCI Guide

IBM
IBM Power System AC922 User manual

IBM
IBM 9080-M9S User manual

IBM
IBM SCM User manual

IBM
IBM PurePower System Instruction Manual

IBM
IBM S922L Instruction Manual

IBM
IBM SAS RAID controllers User manual

IBM
IBM 9223-22H User manual

IBM
IBM 9006-22C Instruction Manual

IBM
IBM BladeCenter Management Module User manual

IBM
IBM I 7.1 Installation guide

IBM
IBM 1500VA User manual

IBM
IBM S822LC User guide

IBM
IBM Power System 9009-41A User manual

IBM
IBM CS821 User manual