Before using this information and the product it supports, read the information in
“Safety notices” on page 5, “Notices” on page 45, the IBM Systems Safety Notices
manual, G229-9054, and the IBM Environmental Notices and User Guide, 03FP290.

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 2
This edition applies to IBM Cloud Pak for Data System Components.
Revised February 2020
© Copyright IBM Corporation 2019, 2020.
US Government Users Restricted Rights – Use, duplication or disclosure restricted by GSA ADP Schedule
Contract with IBM Corp.
with IBM Corp.

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 3
Contents
Safety ........................................................................................................................................................... 4
Safety Notices ............................................................................................................................................. 5
Publications ............................................................................................................................................... 13
Cloud Pak for Data System 1G management, hub switch description ............................................ 13
Cloud Pak for Data System 1G management, hub switch hardware specifications ...................... 15
Operating Environment ........................................................................................................................... 16
Rack Requirements ................................................................................................................................. 17
Rack Space ........................................................................................................................................... 17
Location in the Rack ................................................................................................................................ 18
Package Contents: ................................................................................................................................... 22
Contents: 01FT693, Duct Kit .............................................................................................................. 22
Contents: 3454-A3C, 1G Switch ........................................................................................................ 22
1G Switch Stacked Installation Procedure ........................................................................................... 23
Installing the1G Switch in a rack ........................................................................................................ 23
Before you begin .............................................................................................................................. 23
About this task .................................................................................................................................. 23
1G Switch Single Installation Procedure .............................................................................................. 32
Installing a single 1G Switch in a rack .............................................................................................. 32
Before you begin .............................................................................................................................. 32
About this task .................................................................................................................................. 32
Electronic Emissions Notices ................................................................................................................. 40
Regulatory and Compliance ................................................................................................................... 44
Notices ....................................................................................................................................................... 45
Copyright License: ................................................................................................................................... 48
Trademarks ............................................................................................................................................... 49
Readers’ Comments ................................................................................................................................ 50

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 4
Safety
Before installing this product, read the Safety Information.
Antes de instalar este produto, leia as Informações de Segurança.
Læs sikkerhedsforskrifterne, før du installerer dette produkt.
Lees voordat u dit product installeert eerst de veiligheidsvoorschriften.
Ennen kuin asennat tämän tuotteen, lue turvaohjeet kohdasta Safety Information.
Avant d'installer ce produit, lisez les consignes de sécurité.
Vor der Installation dieses Produkts die Sicherheitshinweise lesen.
Prima di installare questo prodotto, leggere le Informazioni sulla Sicurezza.

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 5
Les sikkerhetsinformasjonen (Safety Information) før du installerer dette produktet.
Antes de instalar este produto, leia as Informações sobre Segurança.
Antes de instalar este producto, lea la información de seguridad.
Läs säkerhetsinformationen innan du installerar den här produkten
Safety Notices
These statements provide the caution and danger information used in this documentation.
Important:
Each caution and danger statement in this documentation is labeled with a number. This number
is used to cross reference an English-language caution or danger statement with translated
versions of the caution or danger statement in the Safety Notices Translation document (PN
G229-9054).
For example, if a caution statement is labeled "D005," translations for that caution statement are
in the Safety Notices Translation document under "D005."
Be sure to read all caution and danger statements in this documentation before you perform the
procedures. Read any additional safety information that comes with your system or optional
device before you install the device.
D005

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 6
DANGER: When working on or around the system, observe the following precautions:
Electrical voltage and current from power, telephone, and communication cables are hazardous. To
avoid a shock hazard:
If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power
cord. Do not use the IBM provided power cord for any other product.
Do not open or service any power supply assembly.
Do not connect or disconnect any cables or perform installation, maintenance, or
reconfiguration of this product during an electrical storm.
The product might be equipped with multiple power cords. To remove all hazardous voltages,
disconnect all power cords.
o For AC power, disconnect all power cords from their AC power source.
o For racks with a DC power distribution panel (PDP), disconnect the customer’s DC power
source to the PDP.
When connecting power to the product ensure all power cables are properly connected.
o For racks with AC power, connect all power cords to a properly wired and grounded
electrical outlet. Ensure that the outlet supplies proper voltage and phase rotation
according to the system rating plate.
o For racks with a DC power distribution panel (PDP), connect the customer’s DC power
source to the PDP. Ensure that the proper polarity is used when attaching the DC power
and DC power return wiring.
Connect any equipment that will be attached to this product to properly wired outlets.
When possible, use one hand only to connect or disconnect signal cables.
Never turn on any equipment when there is evidence of fire, water, or structural damage.
Do not attempt to switch on power to the machine until all possible unsafe conditions are
corrected.
Assume that an electrical safety hazard is present. Perform all continuity, grounding, and power
checks specified during the subsystem installation procedures to ensure that the machine meets
safety requirements.
Do not continue with the inspection if any unsafe conditions are present.
Before you open the device covers, unless instructed otherwise in the installation and
configuration procedures: Disconnect the attached AC power cords, turn off the applicable
circuit breakers located in the rack power distribution panel (PDP), and disconnect any
telecommunications systems, networks, and modems.

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 7
DANGER:
Connect and disconnect cables as described in the following procedures when installing,
moving, or opening covers on this product or attached devices.
To Disconnect:
1. Turn off everything (unless instructed otherwise).
2. For AC power, remove the power cords from the outlets.
3. For racks with a DC power distribution panel (PDP), turn off the circuit breakers located
in the PDP and remove the power from the Customer's DC power source.
4. Remove the signal cables from the connectors.
5. Remove all cables from the devices.
To connect:
6. Turn off everything (unless instructed otherwise).
7. Attach all cables to the devices.
8. Attach the signal cables to the connectors.
9. For AC power, attach the power cords to the outlets.
10. For racks with a DC power distribution panel (PDP), restore the power from the
Customer's DC power source and turn on the circuit breakers located in the PDP.
11. Turn on the devices.
Sharp edges, corners and joints may be present in and around the system. Use care when
handling equipment to avoid cuts, scrapes and pinching. (D005)
C002
CAUTION: Only trained service personnel may replace this battery. The battery contains
lithium. To avoid possible explosion, do not burn or charge the battery.
Do not:
Throw or immerse into water
Heat to more than 100°C (212°F)
Repair or disassemble
Exchange only with the approved part. Recycle or discard the battery as instructed by local
regulations. (C002)

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 8
C026
CAUTION: This product might contain one or more of the following devices: CD-ROM drive, DVDROM
drive, DVD-RAM drive, or laser module, which are Class 1 laser products. Note the following
information:
Do not remove the covers. Removing the covers of the laser product could result in exposure to
hazardous laser radiation. There are no serviceable parts inside the device.
Use of the controls or adjustments or performance of procedures other than those specified
herein might result in hazardous radiation exposure.
(C026)
IBM® servers can use I/O cards or features that are fiber-optic based and that utilize lasers or LEDs.
Laser compliance
IBM servers may be installed inside or outside of an IT equipment rack.
All lasers are certified in the U.S. to conform to the requirements of DHHS 21 CFR Subchapter J for class
1 laser products. Outside the U.S., they are certified to be in compliance with IEC 60825 as a class 1 laser
product. Consult the label on each part for laser certification numbers and approval information.
CAUTION:
Data processing environments can contain equipment transmitting on system links with laser modules
that operate at greater than Class 1 power levels. For this reason, never look into the end of an optical
fiber cable or open receptacle. Although shining light into one end and looking into the other end of a
disconnected optical fiber to verify the continuity of optic fibers many not injure the eye, this procedure
is potentially dangerous. Therefore, verifying the continuity of optical fibers by shining light into one end
and looking at the other end is not recommended. To verify continuity of a fiber optic cable, use an
optical light source and power meter. (C027)
CAUTION:
This product contains a Class 1M laser. Do not view directly with optical instruments. (C028)
CAUTION:
Some laser products contain an embedded Class 3A or Class 3B laser diode. Note the following
information: laser radiation when open. Do not stare into the beam, do not view directly with optical
instruments, and avoid direct exposure to the beam. (C030)

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 9
(R001 part 1)
DANGER: Observe the following precautions when working on or around your IT rack system:
Heavy equipment–personal injury or equipment damage might result if mishandled.
Always lower the leveling pads on the rack cabinet.
Always install stabilizer brackets on the rack cabinet unless the earthquake option is to be
installed.
To avoid hazardous conditions due to uneven mechanical loading, always install the heaviest
devices in the bottom of the rack cabinet. Always install servers and optional devices starting
from the bottom of the rack cabinet.
Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top
of rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them
to stabilize your body position (for example, when working from a ladder).
Each rack cabinet might have more than one power cord.
o For AC powered racks, be sure to disconnect all power cords in the rack cabinet when
directed to disconnect power during servicing.
o For racks with a DC power distribution panel (PDP), turn off the circuit breaker that
controls the power to the system unit(s), or disconnect the customer’s DC power
source, when directed to disconnect power during servicing.
Connect all devices installed in a rack cabinet to power devices installed in the same rack
cabinet. Do not plug a power cord from a device installed in one rack cabinet into a power
device installed in a different rack cabinet.
An electrical outlet that is not correctly wired could place hazardous voltage on the metal parts
of the system or the devices that attach to the system. It is the responsibility of the customer to
ensure that the outlet is correctly wired and grounded to prevent an electrical shock. (R001
part 1)
R007

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 10
CAUTION: Use safe practices when lifting.
L001
DANGER: Hazardous voltage, current, or energy levels are present inside any component that
has this label attached. Do not open any cover or barrier that contains this label. (L001)
L002

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 11
DANGER: Rack-mounted devices are not to be used as shelves or work spaces. Do not place
objects on top of rack-mounted devices. In addition, do not lean on rack-mounted devices and do
not use them to stabilize your body position (for example, when working from a ladder). (L002)
CAUTION: This part or unit is heavy but has a weight smaller than 18 kg (39.7 lb).
Use care when lifting or installing this part or unit. (C008)
(L003)
or or

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 12
or or
DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or
multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power
cables. (L003)
Product Safety Notifications, Japan
(English translation: If this product comes with power cords, such cords should be used
exclusively for the applicable product, but not for other devices.)
(English translation: After providing the main product, if additional power cord is
required, the cord is handled for repair/maintenance/mending purpose.)

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 13
Publications
The following IBM documentation is available on the Safety and Regulatory CD included
with your Cloud Pak for Data System rack & components:
1. 00D2304: 3454-GEF, GEH & 3457-GEH_IBM Rack Safety Information
2. 00D2306: IBM Safety Labels
3. 00RP319: 3454-GEF, GEH & 3457-GEH_Rack Unpacking Instructions
4. 01KU561: Acoustical Caution Statement
5. 03FP290: Environmental Notices and User Guide
6. 03GJ000: Customer Install Guide, Rack and System 3454-GEF, GEH & 3457-GEH_
(this document package / CD)
7. 03GJ003: 3454-GEF, GEH & 3457-GEH_Rack-and-System_Install_Guide-
IBM_Cloud_Pak_for_Data_System-rev1.1_03GJ003_N47076M
8. 03GJ004: Customer Install Guide, 100G Switch 3454-CAC
9. 03GJ005: Customer Install Guide, 2U Chassis 3453-XXX
10. 03GJ006: Customer Install Guide, 1G Switch 3454-A3C
11. 03GJ007: Customer Install Guide, 25G Switch 3454-B8C 3454-C8C
12. 03GJ008: Customer Install Guide, Power Distribution Unit (PDU) 3454-FCE, FCG
13. 03GJ009: Customer Install Guide, 1U Chassis 3455-XXX
14. 29R2409_Important_Notices
15. G229-9054: IBM Systems Safety Notices translations Pub
These documents contain important safety and environmental information along with
specific installation instructions and specifications for the Cloud Pak for Data System
building blocks.
Cloud Pak for Data System 1G
management, hub switch description
The IBM Cloud Pak for Data Systems Management Hub Switch is a 1U, rack
mountable, data center switch that delivers up to 48 ports at 10/100/1000BASE-T and
up to four 10G SFP+ uplink ports. The switch comes as a pretested building block
loaded with software. The base system utilizes one switch, but expansion switches can
be included with the initial deployment or at a later date. Systems larger than ten 2U
chassis or twenty 1U chassis will utilize an extra 1G switch as a hub switch.
The switch can be installed in an IBM Cloud Pak rack or a customer supplied rack
meeting the guidelines in the Customer Install Guide, Rack and System document
included on the Safety and Regulatory CD shipped with your Cloud Pak for Data

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 14
System components. Additional details can be found in the Site Prep Guide at the IBM
Private Cloud for Data site.
The switch includes a fresh air duct kit that directs cold air from the front of the rack to
the power supply side inlets. The preferred method of mounting gangs two identical
switches together in the same 2U duct assembly as shown in the 1G Switch Stacked
Installation Procedure.
DO NOT BLOCK ANY INLET OR EXHAUST DUCTS, VENTS OR PORTS. Blocked
cooling access will adversely affect the performance of your Cloud Pak for Data
System and may void your warranty.
Power can be supplied by the available IBM Cloud Pak for Data System PDUs and line
cords or by customer supplied PDUs meeting the power requirements of the Cloud Pak
for Data System components.
If this is a customer install, IBM installation services will wire and power the system
once all racks, power and components are in place.
The front panel of the switch provides the following components:
LEDs that display the status of the switch and the network
One mini USB RS-232 console port that provides another means to configure the
switch module
Up to forty-eight 10/100/1000BASE-T ports
4 x 10G SFP+ uplink ports
The rear panel of the switch provides the following components:
Two redundant hot-swap power supplies (1x IEC 320 C14 connector on each
power supply)
Fresh air duct to pull cold air in from the front of the rack when installed in the
rear.
This switch provides the 1G management connections for the Cloud Pak for Data
System.

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 15
Cloud Pak for Data System 1G
management, hub switch hardware
specifications
Hardware specifications below provide information for Cloud Pak hardware, including:
dimensions, electrical power and cooling. .
All component installation documents are available on the Safety and Regulatory CD
that comes with your Cloud Pak for Data System components.
3454-A3C, Cloud Pak for Data System Management, Hub Switch (1G switch) [see
Notes 1, 2]
Table 1
Width Depth Height EIA
units
Weight Amperage
(Max)
Power
(Max)
Cooling
(Max)
440 mm
(17.3 in)
350 mm
(16.1 in)
45 mm
(1.70 in)
1 5.4 kg
(11.9 lb)
1.5 amps 300
watts
1000
BTU/Hr
Notes:
[1] The power supplies automatically accept any voltage within the 200-240 V AC,
50/60 Hz rated-voltage range. If dual power supplies are installed and operating, the
power supplies draw approximately equal current from the utility (electrical supply) and
provide approximately equal current to the load.
[2] Power draw and heat load vary greatly by configuration and work load. When you
plan for an electrical system, it is important to use the maximum values but actual power
and cooling will be less.

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 16
Operating Environment
Cloud Pak for Data System components are designed to work together as a system in
an ASHRAE A2 environment. .
Table 2: Operating Environment
Environment Recommended
operating
Allowable
operating
Nonoperating
ASHRAE
A2
Airflow Direction
Front
-
to
-
back
Temperature 18C – 27C (61F -
80F)
10C – 35C (50F-
95F) [1, 5]
5C – 45C (41F –
113F)
Humidity
25% - 60%
noncondensing [2,
4]
20% - 80%
noncondensing [2,
4]
8% - 85% [4]
Maximum
Operating Altitude
3050m (10,000 ft)
[1]
Shipping
Temperature
-40C – 60C (-40F –
140F) [3, 4]
Shipping relative
humidity
8% - 90% [4]
[1] Derate maximum allowable dry-bulb temperature by 1C (1.8F) per 300m (984 ft)
increase in altitude above 950m (2,953 ft)
[2] Maximum dewpoint 21°C (70°F)
[3] Short term temperature only for servers with SSDs
[4] Unit must acclimate to data center environment before unboxing to prevent
condensation.
[5] PDUs do not
have fresh air cooling and can function in 60C (140F) environments

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 17
Rack Requirements
This section provides information on the space requirements for the rack which will house the
Cloud Pak for Data System Components.
Rack Space
Ensure that the rack in which you plan to install the system meets the space requirements
outlined in the following figure:
Figure 1: Top down view of installed switch with 4-point horizontal mounting

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 18
Location in the Rack
The base IBM Cloud Pak for Data System consists of four main components (1G switch, 25G
switch, two compute chassis) that are designed to be integrated in the same rack with PDUs.
The recommended component placement is shown in Figure 2 below. Other configurations can
be used if IBM Safety Notices translations Pub # G229-9054 rules are followed, and the lengths
of the supplied cables are not exceeded.
Figure 2. Front view of installed Cloud Pak component locations.
42
4U Blank Panel
41
40
39
38
2U Blank Panel
37
36 2U Blank Panel
35
34 PDU # 2 Right Power
33 Left Power PDU # 1
32
2U Blank Panel
31
30 1U Blank Panel
29
1U Blank Panel
28 1G Switch
27 1U Blank Panel
26
1U Blank Panel
25 25G Switch
24 1U Blank Panel
23
1U Blank Panel
22 1U Blank Panel
21 1U Blank Panel
12
1U Blank Panel
11 1U Blank Panel
10 1U Blank Panel
9
1U Blank Panel
8 1U Blank Panel
7 1U Blank Panel
6
Chassis 2
5
4 1U Blank Panel
3
Chassis 1
2
1 1U Blank Panel
Labeled “MGT1A”
Labeled “FAB1A”
Labeled “2”
Labeled “1”

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 19
Chassis #1 - Install this 2U server (marked #1) one rack unit (1U) above the
bottom of the rack.
Chassis #2 - Install this 2U server (marked #2) directly above Chassis #1.
25G Switch - The 25G switch (marked # 3) should be installed above the top-
most server. You may install the 25G switch in any convenient location. (see
Figure 2 for recommended switch location, U24)
1G Switch - The 1G switch (marked # 4) should be installed above the 25G
switch. You may install the 1G switch in any convenient location. (see Figure 2
for recommended switch location, U27)
PDUs – Install horizontally at U33/U34 for easy cable routing and service access.
Additional PDUs should be installed above the PDUs at locations U35/U36.
Spine switches should be installed in rack 3 at U30 and U31 per figure 4.
The hub switch is a 1G Cloud Pak for Data System management switch at U32
that is used in conjunction with the spine switches per figure 4.
Installation Notes:
The base system 2U chassis can be identified by looking at the chin label on the
left side of the chassis. One of the chassis is marked #1, while the other chassis
is marked #2. Expansion chassis are marked “EXPANSION”.
The base system 25G switch is marked #3 and the base system 1G switch is
marked #4. Expansion switches are marked “EXPANSION”.
If you intend to expand your system, you may want to leave enough space
to install additional expansion chassis and switches at a later date. Expansion
chassis and switches are ordered separately. Expansion chassis and switches
can be racked in any order, but the preferred locations are shown in Figure 3.

© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch 20
Figure 3: Front view, Cloud Pak system with optional expansion chassis, switches and PDUs.
42
4U Blank Panel
41
40
39
38
PDU # 6 Right Power
37 Left Power PDU # 5
36 PDU # 4 Right Power
35
Left Power PDU # 3
34 PDU # 2 Right Power
33 Left Power PDU # 1
32
2U Blank Panel
31
30 1U Blank Panel
29
1G Switch (marked "expansion")
28 1G Switch
27 1U Blank Panel
26
25G Switch (marked "expansion")
25 25G Switch
24 1U Blank Panel
23
1U Blank Panel
22 1U Blank Panel
21 1U Blank Panel
20
1U Blank Panel
19 1U Blank Panel
18 1U Blank Panel
17
1U Blank Panel
16 1U Blank Panel
15 Chassis 5 (marked 'expansion')
14
13 1U Blank Panel
12 Chassis 4 (marked 'expansion')
11
10 1U Blank Panel
9 Chassis 3 (marked 'expansion')
8
7 1U Blank Panel
6 Chassis 2
5
4 1U Blank Panel
3 Chassis 1
2
1 1U Blank Panel
Labeled “expansion”
Labeled “MGT1A”
Labeled “expansion”
Labeled “FAB1A”
Labeled “expansion”
Labeled “expansion”
Labeled “expansion”
Labeled “2”
Labeled “1”
This manual suits for next models
3
Table of contents
Other IBM Switch manuals

IBM
IBM RackSwitch G8000 User manual

IBM
IBM 8271 User manual

IBM
IBM Flex System EN2092 User manual

IBM
IBM SAN32M1 Manual

IBM
IBM 8237 User manual

IBM
IBM 8275-416 User manual

IBM
IBM 17353LX - 1x8 Console Switch User manual

IBM
IBM Storage Networking SAN128B-6 Manual

IBM
IBM 1735R16 User guide

IBM
IBM N Series User manual
Popular Switch manuals by other brands

IOGear
IOGear MiniView Ultra GCS138 installation manual

Network Technologies
Network Technologies UNIMUX series Installation and operation manual

SMC Networks
SMC Networks PFMC7501 Operation manual

tams elektronik
tams elektronik ARTEMIS manual

TechLogix Network
TechLogix Network TL-4X1-HD user manual

Comprehensive
Comprehensive CSW-HD201C user manual