
Pioneering Gas Sensing Technology.
ionscience.com Part No: 908225 V1.0
1.
Power
The ION ARA DOCK4 bump test and calibration station has two power sources. A 12V DC
mains power supply and an internal rechargeable battery.
The internal rechargeable battery provides approximately 5 hours of continuous
operation when fully charged (based on 4 x ARA’s inserted).
The ION ARA DOCK4 will automatically switch itself o between tests if inactive for
2 minutes. This can be adjusted via ION ARA Dock4Manager software.
The power LED is green when it has sucient charge or connected to mains power.
Setup and Installation
1. Loosen the lid cover bolts with a 3mm hexagonal wrench and open the lid to gain
access to the calibration gas compartment.
2. Insert the calibration gas into the housing and screw clockwise until seated.
Secure the cylinder with the bottle strap. Close the lid and fasten the cover bolts.
3. The calibration pressure gauge will indicate the amount of gas available.
4. Press the power button. The ION ARA DOCK4 bump test and calibration station is now
ready to use.
NOTE: These can be adjusted via ION ARA DOCK4 Manager and IR Link
Battery low Normal operation No USB
Default Gas Concentrations
The recommended default calibration gas concentrations are below:
ION ARA Models: Gas Type: Gas Concentrations:
ARA100, ARA100H Hydrogen Sulfide (H2S) 25 ppm
ARA200, ARA200H Carbon Monoxide (CO) 100 ppm
ARA300 Oxygen (O2) 18% Vol
ARA400 Sulfur Dioxide (SO2) 10 ppm
Power Button and Status Colours
Powers up the ION ARA DOCK4 bump test and calibration station.
ARA DOCK4 Bump Test &
Calibration Station
Quick start guide