
4.Installation Steps
4.1
Mark and drill bores by using the
installation template first, then fix the
mortise into the door frame.
4.2 Tighten the 4 screws to fix the mortise
on the door.
4.3 Fix 4 screw bolts on the front escutcheon 4.4 place square shaft and pressure spring
into the bore .
4.5 Pass the connection wire through the top
bore. 4.6 Install the mounting plate with fixing
screws tightly against the door surface.
4.7 Place pressure spring and square shaft
in the back escutcheon in proper order.
4.8 Insert the connecting wires of front escutcheon into
the related sockets of the back escutcheon. Then align
and insert the square shaft into mortise hole, make
the back escutcheon against the door closely.
4.9
Install the batteries and the battery cover.
Covers the rubber plug, then install the
striker assembly to finish installation. 4.10 Please check if they are working properly.
Place the pressure
spring inside the shaft
square larger end first
Place the pressure
spring inside the shaft
square larger end first