
Page 5 / 8
WL 3000
Liquid Cooling System
WL 3000
1201.38ae
Laird Technologies Liquid Cooling Systems
www.lairdtech.com
User
ManUaL
4 MainTenance
4.1 heaT exchanger
In order to achieve maximum cooling capacity, the heat exchanger of the cooling unit must be kept clean.
Check the heat exchanger every three months for cleanliness. If cleaning is required, perform the following:
1. Disconnect the cooling unit from the main power source.
2. Remove the side cover.
3. Clean the heat exchanger with compressed air, a damp cloth or shop vacuum.
4. Mount the side cover.
4.2 pUMp
then perform the following:
Note:
1. Disconnect the cooling unit from the main power source and external hoses.
2. Drain the coolant from the reservoir.
3. Remove the side cover.
4. Close the ball cock.
Note: Some coolant may run out from the pump. Collect in a suitable container.
8. Open the ball cock.
Note: Do not operate the cooling unit when the ball cock is closed, as this can damage the pump.
9. Mount the side cover and reposition the cooling unit on its legs.
System
Pressure