
7 Electrical installation 39
7.1 General electrical installation procedure 39
7.2 Insert the AC input cable 39
7.3 Connect the AC input cable 40
7.3.1 Connect the AC input cable, 1 phase (IEC portfolio) 40
7.3.2 Connect the AC input cable, 3 phase (IEC portfolio) 40
7.3.3 Secure the cables 41
7.4 Communication connections 42
7.4.1 Insert the Ethernet cable 42
7.4.2 Connect the Ethernet cable 42
7.4.3 Insert the wires for the smart meter communication 43
7.4.4 Connect the wires for the smart meter communication 43
7.4.5 Insert the Nano-M2M SIM card 44
7.5 Replace the EV charge cable 44
7.5.1 Replace the EV charge cable, 1 phase (IEC portfolio) 44
7.5.2 Replace the EV charge cable, 3 phase (IEC portfolio) 45
8 Commissioning 48
8.1 General commissioning procedure 48
8.2 Energize the EVSE 48
8.3 Set up the EVSE 48
9 Access to parts 50
9.1 Remove the cabinet cover 50
9.2 Install the cabinet cover 50
9.3 Remove the maintenance cover 51
9.3.1 Remove the maintenance cover (EVSE without display) 51
9.3.2 Remove the maintenance cover ( EVSE with display) 51
9.4 Install the maintenance cover 52
9.4.1 Install the maintenance cover (EVSE without display) 52
9.4.2 Install the maintenance cover (EVSE with display) 52
9.5 Remove the inner cover 53
9.5.1 Remove the inner cover (EVSE without display) 53
9.5.2 Remove the inner cover (EVSE with display) 53
9.6 Install the inner cover 54
9.6.1 Install the inner cover (EVSE without display) 54
9.6.2 Install the inner cover (EVSE with display) 54
10 Troubleshooting 55
10.1 Troubleshooting procedure 55
10.2 Troubleshooting table (IEC portfolio) 55
10.3 De-energize the EVSE 61