|o
o
4o "
’7.
FACTOR525 PEC DEC ATT. ASSEMBLYINSTRUCTIONS(LEVEL 2) __
LOOSENthe 3/8 X4 1N. BOLTthat ~ssembles the two (2) PULLEYS,and two (2) I/2 IN. SPACERS
the BASEdirectly behind the FRONTUPRIGHT.Removethe 3/8 IN. LOCKNUT,and the 3/8 IN.
WASHER..Slide the BOLTout enoughto removethe two (2) 1/2 IN. SPACERS.Replace if.it I/2 IN.
SPACERSwith one (I) .~-I~ X I IN. PULLEY,as shownin (VIEWB-B). Slide BOLTback
Replace the 3/8 IN. WASHER.,and 3/8 IN. NUT. TIGHTENCONNECTIONSECURELY.
SECURELYassemble one (I) 4-I/2 X 1 IN. PULLEYto the single hole in the BASEdirectly behind the
FRONTUPRIGHTas shown in (VIEWB-B) on drawing, using one (I) 3/8 XI-3/4 IN. BOLT,two
3/8 IN. WASHERS,and one (1) 3/8 IN. LOCKNUT.
To assemble the LOOPCABLE,follow the cable routing diagram on drawing, and use the following
steps:
Assemble one end of the LOOPCABLEto the LEFTARMADVANCEand the other cad ofthe
LOOP CABLE to the RIGHT ARMADVANCE(MAKE SURE THAT LOOP CABI3E IS
ROUTED BETWEENTHE AB CRUNCHCABLE AND THE FRONT UPRIGHT) as shown
on drawing, using~.wo (2) 318 IN. NUT,four (4) 3/8 IN. WASHERS,and two (2) 3/8 IN.
HEIGItT LOCK NUT. (TIGHTEN THE CONNECTION ENOUGHTO REMOVE’rile
PLAY, YET AL].,OWING THE LOOP TO MOVEFREELY)
¯Drape the CABLEover the both PULLEYSon the CENTERPULLEYBI~.CKET. (THIS
WILL FORM A LOOP IN THE CENTER OF THE CABLE)
¯Position CABLERETAININGCLIPS in a 45 DEGREEposition over the PULLEYSand
CABLES,and tighten the two (2) PULLEYconnections SECURELY.SEE DRA’~/ING.
To assemble the LINKCABLE,follow the cable routing diagram on drawing, and use the iblt~wing steps:
®LOOSELYassemble the PULLt:YBRACKETto the LINKCABLEas shown in (DE’.[’AIL E)
drawing, using two (2) I/4 IN. WASI-tER,and two (2) 1/4-28 IN. NUTS.(LOCATEPULLEY
BRACKET HALF WAY UP ONTItETItREADSOFTHELINKCABLE" DO NOT
TIGHTEN NUTS AT TItlS TIME)
,, Slip one (1) 4-1/2 X I IN. PULLEYinto the LOOPofthe LOOPCABLEcreated from routing
STEP3. (VIEWD-D) While holding fl~at PULLEYin the LOOP,SECURELYassemble the
PULLEYBtL4.CKETover the PULLEYas shown in (DETAILE) on drawing, using one (1) 318
2 IN. BOLT,two (2) 3,’8 IN. \VASI-I~RS,and one (I) 3~8 IN. LOCK
¯Route the LINKCABLEas shown on drawing. (ALSOSEE VIEWB-B)
oRunthe LINKCABLEthrough the pre-deterrnined hole of ~he D-RINGas shownin (’.DETAILA)
and attach one (I) D-RINGCABLECLIParound the ball end of the LINKCABLE.
Attach one (I) SHOCKCORDto the D-RINGCABLECLIP on the end of the LINKCABLEas shovrn
in (DETAILA).
Route the SHOCKCORDup and around the: pro-determined 2 IN. PULLEYabove the D-RINGas shown
in (VIEWC-C). and down~o the BASE.
Attach one (1) SWIVELto the end of the SHOCKCORD.Slip ti;e end of the SWIVELover the L-PIN
on the BASE,and position the SWIVELdirectl: over the FIRSTPULLEYas shown in (VIEWB-B)
drawing.
oO