1. On both wall proles drill three 4.5mm holes through the lip. Place them 7mm in from the
edge and approximately 100mm from each end and the other positioned in the centre.
• Drill the holes from the back (through the face that goes to the wall) - deburr all
holes.
2. Place both Wall Proles 10mm in from the outside of the tray. Make sure that both Wall
Proles are completely vertical using a spirit level and mark the wall through the holes with a
pencil.
3. Drill the wall with a 6mm Masonry Drill Bit (not supplied) where the Wall Proles are to be
positioned. Fit the Wall Plugs supplied (if going in to a brick or block wall). If going into a
plasterboard wall you will need to purchase appropriate wall xings. Wipe clear all debris from
the Tray before referring to the next stage.
4. Take one Wall Prole and position it on the Tray, place a bead of Bathroom Sealant (not
supplied) the width of the Wall Prole between the tiled wall and tray. Fit Screw Bases to
the 40mm screws (supplied) and secure the Wall Prole to the wall. Do not over tighten the
screws into the Wall Prole as this will misshape the Wall Prole. Ensure the Wall Prole
stays completely vertical throughout this procedure using a Spirit Level.
• NOTE: Only one Wall Prole is tted at this time, the other Wall Prole is tted later.
• NO sealant should be present between the Wall Proles and the tiled walls
vertically prior to screw xing.
5. Seal the gap between the Tray and Wall Prole with a Bathroom Sealant (not supplied).
• Failure to carry out Stages 4 & 5 can result in serious water damage and is not
covered by the Guarantee.
Step 3 - Wall Prole Positioning
Drill this
face
10mm
②
①
⑤
Screw Base
7mm
①④
Step 4 - Installing the Door, Handle and Fixing the 2nd Wall Prole
Width
of
Wall
Prole
1. Dismantle the Handle Assembly and re-assemble onto the Door Glass. Make sure the Hole Bush
is tted between the screw and glass and the Black Gaskets are tted each side of the Door.
2. Remove the bottom seals stored on the vertical hinge side of the glass and t the appropriate
length bottom seal either side of the pivot block on the bottom of the glass.
3. Prior to xing the 2nd wall prole apply a bead of Bathroom Sealant (not supplied) the width of the
wall prole where it meets the tiled wall and tray at the bottom.
4. Place the Door over the already tted (1st) wall prole which you decided in Step 2 and push fully
together.
5. Place the 2nd Wall Prole over the other end of the Door as far as it will go and then push it
back to the wall. Fit the screw bases to the 40mm screws and screw x through the lip and t the
coloured cover caps.
6. Carefully lift the Door Assembly and seal the gap on the inside between the Tray and Wall Prole
with a Bathroom Sealant (not supplied).
• IMPORTANT: Failure to carry out Stages 3 and 6 can result in serious water damage
and is not covered under the terms of the guarantee.
• Ensure that the pivot end of the enclosure is tted to your 1st wall prole.
• The wall proles must be completely vertical (the bubble on the Spirit Level must be in
the centre of the 2 lines).
Gaskets
Screw
NOTE: The stages below will require 2 people to carry them out.
On stage 6 when lifting the Door Assembly to seal the inside of
the 2nd wall prole place a wooden chock or similar between
the enclosure and the top of the tray to prevent it from falling
and causing injury (carefully remove when done).
Width
of
Wall
Prole
Door hidden
for clarity
①
③
⑤