Sealite Atlantic-2600 Supplement

Version 2.2
ATLANTIC-2600
Ocean Buoy
Installation & Service Manual


Latest products and information available at www.sealite.com
3
ATLANTIC-2600
Ocean Buoy
Table of Contents
Introduction..........................................................................................Page 4
Sealite Buoy Division..........................................................................Page 4
Why Choose Polyethylene Buoys? ...................................................Page 4
Mooring Requirements & Regulations ..............................................Page 4
ATLANTIC-2600 Ocean Buoy..............................................................Page 5
ProductFeatures&TechnicalSpecications ..............................Page 5
Product Components...................................................................Page 7
Assembly Instructions .................................................................Page 8
Mooring Assembly Instructions..................................................Page 10
Mooring Diagram.......................................................................Page 11
Marine Buoy Maintenance ................................................................Page 12
Sealite Buoy Warranty ......................................................................Page 14
Version No. Description Date Author Approved
1.0 Manual Launch April 2011 C. Procter
1.1 Max Mooring Load adjustment May 2012 M. Walker
1.2 Breather Unit September 2013 P. Rainey
1.3 Mooring diagram update September 2015 D. Tomaszewicz
2.0 Contact details April 2016 J. Dore
2.1 Warranty V2-3 & Footer February 2016 S.Amirthalingam M.Nicholson
2.2 Remove spec and warranty November 2018

Latest products and information available at www.sealite.com
4
ATLANTIC-2600
Ocean Buoy
Introduction
Congratulations! By choosing to purchase a Sealite Buoy, you have become the
owner of one of the most advanced rotationally-moulded polyethylene marine buoys
in the world.
Sealite Pty Ltd has been manufacturing buoys for over 25 years, and particular care has been taken to
ensure your buoy gives years of service.
As a commitment to producing the highest quality products for our customers, Sealite has been
independentlycertiedascomplyingwiththerequirementsofISO9001:2008qualitymanagement
system.
By taking a few moments to browse through this booklet, you will become familiar with the versatility of
your buoy, and be able to maximise its operating function.
Sealite Buoy Division
Sealite marine buoys are manufactured on-site from rotationally-moulded UV-stabilised polyethylene,
and are designed to offer a low-maintenance, high visibility solution to marine navigation.
The Sealite buoy division provides turn-key production of navigation buoys. From tooling development,
rawmaterialsselection,andproduction,tonaltestingandinspection,Sealiteguaranteessuperior
quality and fast turn-around times.
Sealite’sbuoyproductsareavailableinawiderangeofcongurationsandsizes,andcanbe
economically shipped worldwide.
Why Choose Polyethylene Buoys?
• No painting
• Inhibits growth
• Increased interval between servicing
• Routine maintenance on location
• Easily repaired in the unlikely event of damage
• Lightweight for ease of deployment and maintenance
• Environmentally friendly – no use of toxic antifouling paint
4. Mooring Requirements & Regulations
Pleasecontactyourlocalauthorityforanyspecicrequirementsregardingthedeploymentofbuoys.
IALA also has guidelines and recommendations that should be followed.
All information given in this manual is advisory only. Please consult with your local authority before
deploying your buoy products.
Localconditionsthatneedtobeconsideredinclude:-
• Water depth
• Maximum currents
• Maximum wind speeds
• Sinker size and weight

Latest products and information available at www.sealite.com
5
ATLANTIC-2600
Ocean Buoy
Product Features & Technical Specications
Optional
self-contained lantern
Internal 10m2radar
reector
Convenient tether
points
Additional payload
Made from strong,
durable, UV-stabilized,
virgin polyethylene
Internal tie-bars to
interconnect lifting &
mooring points
Innovative
guidance
keel
IALA top mark
Guard rail
316-grade stainless steel
ladder & grab rail
Optional battery
compartment
Lifting points
Non slip deck
Rotationally-moulded
to 18mm wall thickness
Twin mooring
points
ATLANTIC-2600-ET
Model shown includes
extended tower
to 4.1mtr
ATLANTIC-2600 Ocean Buoy
The ATLANTIC-2600 is a robust, rotationally-moulded polyethylene navigation buoy designed
for offshore port and coastal applications.

Latest products and information available at www.sealite.com
6
ATLANTIC-2600
Ocean Buoy
ATLANTIC-2600
Standard Model
ATLANTIC-2600-ET
Model includes extended tower

Latest products and information available at www.sealite.com
7
ATLANTIC-2600
Ocean Buoy
ATLANTIC-2600 Product Components
Standard
Model
Extended
Tower
No Description Qty
1Atlantic Float Section 1 1
2Atlantic Float Section Side Panels 2 2
3Atlantic Tower 1 1
4Mid Section - 1
5Ladder 1 1
6Grab Rail 1 1
7Guard Rail 1 1
8DayMarkMountingPlate(Optional)
9Atlantic Lug Bushes 4 4
10 G316 S/S Bolt. M10x100mm Long 16 32
11 G316 S/S Flat Washer 32 64
12 G316 S/S Spring or Locking Washer 16 32
13 G316 S/S Plain Nut 16 32
14 G316S/SBoltM16x90mm 8 8
15 G316 S/S M16 Flat Washer 16 16
16 G316 S/S M16 Spring Washer 8 8
17 G316 S/S M16 Plain Nut 8 8
18 Galvanised Grade M Shackle Ø38 with
Ø44 pin, inside width 70mm x 137mm
2 2
19 Galvanised Grade S Shackle, Ø32mm 2 2
20 Galvanised Grade S Shackle, Ø38mm 1 1
21 Bridle Plate 1 1
G316 S/S = Grade 316 Stainless Steel
ATLANTIC-2600
Standard Model
ATLANTIC-2600-ET
Model includes extended tower

Latest products and information available at www.sealite.com
8
ATLANTIC-2600
Ocean Buoy
Side
Panel Assembly
Detail
Atlantic - 2600
Navigation Buoy
Use Stainless Steel M16 x 90 Bolt with
(x2) flat washers, (x1) spring washer
and (x1) nut. 8 places
Assembly Instructions
Check Components
• Unload all components from crate or container.
• Check all components are complete and correct.
Use table on the previous page for full list of
components.
Prepare the Float Section
• Position the Atlantic Float Section on
solid, level ground.
• Usingthe8xM16bolts,atwashers
spring washers and nuts; assemble the
oatsidepanelstothemainoatsection.
Prepare Tower Section
• Fit the grab rail to the tower section
• Fit the guard rail and top mark support
• Fit the top mark and the lantern to the top of the tower section
• Fitthemidsectiontothetower(extendedtowermodelonly)
• Fit the ladder assembly
• Fit any day mark brackets
• Fitthetowersectiontotheoatassemblyusing16xM10Bolts,washersandnuts
• FinalInspection:
o Check all bolts are tightened
o Check lantern is working correctly
o Checkbattery(iftted)issecuredproperly
o Checkbatterydoor(iftted)islatchedproperlytoformawatertightseal
• Ensurethelugbushesarettedtothemooringbushesofthebuoy
• Fit the mooring assembly to the mooring points

Latest products and information available at www.sealite.com
9
ATLANTIC-2600
Ocean Buoy
Sealite Breather Unit
How it Works
Inside the breather unit, is an air channel which forms in the shape of an S-Bend which runs from the
M16 threaded hole to a small hole located on the other side.
Thischannel,llswithwaterandspillsoutthroughthesmallhole,allowingthewatertoeffectively
drain from the buoy and at the same time, preventing water from entering into the buoy through the
small hole.
Installation Instructions for Breather Units (For Products which Contain Sealite’s Power Packs)
1. Unscrew the white plug located at the side/base of the buoy
2. Apply a small amount of marine grade silicon adhesive to the thread of the breather valve
3. Carefully screw in the breather unit ensuring that the arrow’s direction is pointing down.

Latest products and information available at www.sealite.com
10
ATLANTIC-2600
Ocean Buoy
Mooring Assembly Instructions
Check Components
• Unpack all Mooring and check all components are complete and correct.
Prepare & Attach Chain
• Fit and secure 1 x Ø38mm Shackle and 1 x Ø38mm Swivel Eye to the base of the bridle.
Note: All Shackles must be positively locked. For example use 3mm Stainless Steel wire to lock
the pin eye, or use a shackle pin with nut and split pin.
• Fit and secure a length of chain to the Swivel Eye using 1 x Ø38mm Shackle.
Note: Please use the guides below to determine the correct chain size and length.
• Fit and secure the Bridle to the Buoy using 2 x Ø32mm Shackles. Place Ø36mm washers to either
sideofthebridleplatetopacktheShackleforaneatt.
Attach Mooring Block
• Fit and secure the Chain to the Mooring Block.
• The Buoy is now ready for deployment.
Water Depth Recommended Chain Size
(from swivel to mooring block)
Metres Feet
6 to 14 20 to 46 44mm
14 to 22 46 to 72 38mm
22 to 32 72 to 105 32mm
32 to 50 105 to 164 25mm
50 to 75 164 to 246 22mm
Chain Size Guide
Recommended
Length of Chain
Maximum
Water Depth
Best Practice
(Upto6ktscurrent) 3 x Water Depth 50m
For Reduced Water Circle
(Current2ktsto4kts) 2.5 x Water Depth 75m
For Minimum Water Circle
(useonlywherecurrent<2kts)
Not less than
2 x Water Depth 75m
Chain Length Guide

Latest products and information available at www.sealite.com
11
ATLANTIC-2600
Ocean Buoy
ATLANTIC-2600 Mooring Diagram

Latest products and information available at www.sealite.com
12
ATLANTIC-2600
Ocean Buoy
Marine Buoy Maintenance
Sealite Marine Buoys are designed to require very little maintenance. We recommend the buoy be
inspected annually. Inspection may need to increase depending on the local conditions and the
position of the buoy.
IALA Recommendation AISM E-107 suggests moorings are inspected annually.
Marine Buoy – Annual Maintenance
• Visually inspect buoy for damage
• Inspect the top mark for any damage. Repair any broken or damaged section.
• Clean buoy of animal debris
Mooring – Annual Maintenance
• Check and clear the tail and ride chains from shells and algae.
• Check for wear on any shackle axis and check the tapered pins. Any worn shackles must be
replaced.
• Check the free movement of each swivel around its head. If any swivel head sticks it must be
replaced.
• Check every link of the thrash length of the chain. Check the diameter of the nips and sides and
also inspect the welds on every link.
• If depth allows, a worn riding chain may be reversed.
• Change a chain when any link shows excessive wear.
• Chain must be replaced if any link wears to less than 3/5 of the original diameter.
Mooring – Biannual Maintenance
• Inspect the ground chain and sinker.
Lanterns – Maintenance
• PleaserefertotheInstallationManualforthespecicMarineLanternttedtotheBuoy.

Latest products and information available at www.sealite.com
13
ATLANTIC-2600
Ocean Buoy
Notes

Latest products and information available at www.sealite.com
14
ATLANTIC-2600
Ocean Buoy
Refer to Sealite website:www.sealite.com
Sealite Buoy Warranty
Table of contents
Other Sealite Marine Equipment manuals
Popular Marine Equipment manuals by other brands

Raymarine
Raymarine i60 wind Installation & operation instructions

urmet domus
urmet domus 1043 installation manual

Simrad
Simrad IS80 Heading Repeater HR80 user manual

PYI
PYI FENDERTEX FX-BST-800 Assembly instructions

Argus Security
Argus Security SGWS-MOD/865 manual

Scanstrut
Scanstrut Scanpod SPR-1u-AM installation instructions