1. Fit handle to the door inline with the
centre door framework using 4 x 25 mm black
screws.
Remove all travel protection blocks from
bottom edge of panels.
1. Ensure that your base is firm and
absolutely level.
2. Lay floor of building on base.
3. Place back panel onto the floor ensuring
the cladding has overhung the floor. Place
side panel next to this and join together from
the inside using 2 x 60 mm screws.
4. Place remaining side panel in position. Join
together from the inside using 2 x 60mm
screws.
5. Join front panel to side panels using 2 x 60
mm screws.
1. Place large roof panel in position and
secure using 4 x 40 mm nails along each side
into framework of panels.
1. Place verandah floor in front of building.
2. Trim uprights of balustrade as required.
3. Place
balustrade in
position.
Secure
balustrade to
verandah floor
using 2 x 80
mm screws
per
balustrade.
1. Place verandah roof in position. Secure to
the front of roof already in place using 4 x 60
mm screws. Make sure you do not tighten the
screws right up as you want the roof to hang
down.
2. Secure upright posts of balustrade to roof
panel from the outside using 2 x 60 mm
screws per upright.
1. Measure and cut 3 x 1970 mm length
strips.
2. Lay one piece of felt along the lowest edge
of the large roof panel allowing an overhang
of approx. 50 mm on all sides. Secure the felt
using felt nails spaced at approx. 100 mm
intervals. Repeat at the front of the building.
Do not nail across the roof until the final piece
of felt that covers the gap is in place.
3. Place the final piece of felt in position, this
piece will overhang the other two pieces.
Nail into position along both edges of this
piece and at both ends.
1. Fix the corner strips in position where the
panels meet using 3 x 40 mm nails per strip.
1, Secure wall panels to the floor on the
inside of the building through framework into
floor bearers using 2 x 60 mm screws per
panel.
1, Nail the fascia boards in position using 3 x
40 mm nails per piece.
2. Trim off any excess felt with cutting knife
against the edge of the fascia board.
1. Place glazing material into the aperture of
each window.
2. Hold into position with four pieces of bead-
ing. Secure into position using 2 x 15 mm
panel pins per piece of beading.
VENT - push fit vents into
the apertures of the back
wall.
A Front Panel
B Floor & Walls
C Main Roof Assembly
D Balustrade
E Verandah Roof
F Felt Roof
G Corner strips
H Secure Walls to Floor
I Fascia & Diamonds
J Door Catch
K Glazing
. Assembly Completion Checklist
1. Drill 2 holes into the wood block and
secure to inside of door opening flush with the
aperture using 2 x 60 mm screws.
2. Secure door catch to inside of door approx.
centrally along side the wood block and
secure using 2 x 25 mm screws.
3. Close the door and attach the door catch
together and mark the required position of the
door catch housing. Secure using 2 x 25 mm
screws.
1Check and ensure that no raised grain or splinters
are evident on timber components. Sand down any
raised grain or splinters using fine grade sandpaper.
2Check that all screw, nail and pin heads are properly
tapped home and are not proud of the timber surface.
3Check and ensure that no screws, nails or pins
protrude through any panel.
4 Check and ensure that all parts are properly secured
against reasonable force.
5Do not apply decorative wood finish/treatments to wet
or damp timber. Please observe the instructions of
the wood finish/treatment manufacturer.
6 Adults need to check the playhouse regularly and
maintain the playhouse in good condition to provide a
safe environment. Do not use if damaged. If damaged
the playhouse should be properly and safely repaired
before further use by children.