manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Siemens
  6. •
  7. Circuit Breaker
  8. •
  9. Siemens 8DJH Manual

Siemens 8DJH Manual

Other manuals for 8DJH

4

Other Siemens Circuit Breaker manuals

Siemens I-T-E Sensitrip MD Series Owner's manual

Siemens

Siemens I-T-E Sensitrip MD Series Owner's manual

Siemens 3VF3 User manual

Siemens

Siemens 3VF3 User manual

Siemens AFCI Guide

Siemens

Siemens AFCI Guide

Siemens 3VT9100-4TN30 User manual

Siemens

Siemens 3VT9100-4TN30 User manual

Siemens 3RV1 Series User manual

Siemens

Siemens 3RV1 Series User manual

Siemens 3VT9500-8LC30 User manual

Siemens

Siemens 3VT9500-8LC30 User manual

Siemens 3VT9215-4TD30 User manual

Siemens

Siemens 3VT9215-4TD30 User manual

Siemens 3VA10-ED Series User manual

Siemens

Siemens 3VA10-ED Series User manual

Siemens 5ST303 Series User manual

Siemens

Siemens 5ST303 Series User manual

Siemens 3RV1.2 User manual

Siemens

Siemens 3RV1.2 User manual

Siemens 3VM10 ED Series User manual

Siemens

Siemens 3VM10 ED Series User manual

Siemens 3VA9588-0LB10 User manual

Siemens

Siemens 3VA9588-0LB10 User manual

Siemens 3WX3641-0JB00 User manual

Siemens

Siemens 3WX3641-0JB00 User manual

Siemens 3WX3647-5JE00 User manual

Siemens

Siemens 3WX3647-5JE00 User manual

Siemens 3WN6 User manual

Siemens

Siemens 3WN6 User manual

Siemens COM35 User manual

Siemens

Siemens COM35 User manual

Siemens HBLQR User manual

Siemens

Siemens HBLQR User manual

Siemens GER Programming manual

Siemens

Siemens GER Programming manual

Siemens 8DB10 User manual

Siemens

Siemens 8DB10 User manual

Siemens 3VA2 JP Series User manual

Siemens

Siemens 3VA2 JP Series User manual

Siemens 3VA9088-0VM30 User manual

Siemens

Siemens 3VA9088-0VM30 User manual

Siemens 8DA10 User manual

Siemens

Siemens 8DA10 User manual

Siemens 3WN6 User manual

Siemens

Siemens 3WN6 User manual

Siemens 8DA series User manual

Siemens

Siemens 8DA series User manual

Popular Circuit Breaker manuals by other brands

Acrel ASCB1 Series Installation and operation manual

Acrel

Acrel ASCB1 Series Installation and operation manual

ABB SACE Emax 2 E2.2 manual

ABB

ABB SACE Emax 2 E2.2 manual

Eaton NOVA LBS 15 Installation and operation instructions

Eaton

Eaton NOVA LBS 15 Installation and operation instructions

ABB SACE Emax E1 quick start guide

ABB

ABB SACE Emax E1 quick start guide

WEG FHU ACW125 installation instructions

WEG

WEG FHU ACW125 installation instructions

TERASAKI NHP TemBreak PRO P160 Series installation instructions

TERASAKI

TERASAKI NHP TemBreak PRO P160 Series installation instructions

hager TS 303 User instruction

hager

hager TS 303 User instruction

ETI EFI-4B Instructions for mounting

ETI

ETI EFI-4B Instructions for mounting

Gladiator GCB150 Installation instruction

Gladiator

Gladiator GCB150 Installation instruction

nader NDM3EU-225 operating instructions

nader

nader NDM3EU-225 operating instructions

Eaton 50DHP-VR Instruction handbook

Eaton

Eaton 50DHP-VR Instruction handbook

ABB SACE Emax 2 E6.2 Instruction handbook

ABB

ABB SACE Emax 2 E6.2 Instruction handbook

Gewiss 90 RCD Installation

Gewiss

Gewiss 90 RCD Installation

OEZ LFN Instructions for use

OEZ

OEZ LFN Instructions for use

Eaton Power Defense PDG2 Instruction leaflet

Eaton

Eaton Power Defense PDG2 Instruction leaflet

Bticino L4412CM2 quick start guide

Bticino

Bticino L4412CM2 quick start guide

OEZ 3VA9-RS-4VBH1 Installation, service and maintenance instructions

OEZ

OEZ 3VA9-RS-4VBH1 Installation, service and maintenance instructions

Rockwell Automation Allen-Bradley 140G-G manual

Rockwell Automation

Rockwell Automation Allen-Bradley 140G-G manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

SIEMENS 8DJH Ring Main Operator Guide Circuit Breaker Panel
1
L
(Type 2)
CLOSE
OPEN
2756
b
a
CLOSE
OPEN
2756
CLOSE
OPEN
2756
WARNING
Check that the Ready For Service (gas) Gauge indicates GREEN before operation
DO NOT OPERATE switchgear if the pointer is in the RED region
1
Slide the Isolator/Earth Switch Control Gate down to
open the Earth Shutter. 2
Insert the Operating Lever and rotate anti-clockwise
to open the Earth Switch. 3
Remove the Operating Lever. Check the
Control Gate has returned to the mid position.
AFeeder Earthed u
Feeder Isolated u
1
Slide the right-hand Control Gate up to open the
Isolator Shutter.
4
(a) Remove the Operating Lever. Check the
Control Gate has returned to the mid position.
(b) Slide the left-hand Control Gate up to open the
Circuit Breaker Spring Charge Shutter.
2
Insert the Operating Lever and rotate clockwise
to close the Isolator Switch.
5
Insert the Operating Lever and rotate clockwise to
charge the Circuit Breaker Spring. It will click and hold
when rotated enough (70°).
Note: The aperture is sprung to eject the handle automatically.
It must be pushed in firmly and held to rotate.
3
For panels where the Circuit Breaker Spring Charge
mechanism is motorised, the spring is automatically
recharged immediately after the Circuit Breaker is
opened. In this case, steps 4 and 5 can be omitted.
6Remove the Operating Lever. Press the CLOSE
button VERY HARD.
BFeeder Isolated u
Feeder Connected u
These instructions detail mechanical operation of standard designs only
2
SIEMENS 8DJH Ring Main Operator Guide Circuit Breaker L Panel (Type 2)
SWITCHGEAR Division
CLOSE
OPEN
2756
CLOSE
OPEN
2756
CLOSE
OPEN
2756
Circuit Breaker CLOSE
push button
Circuit Breaker OPEN
push button
Earth Switch status indication (shown open)
Isolator Status indicator (shown open)
Circuit Breaker
Spring Charge
indicator
Circuit Breaker status
indication (shown open)
Isolator/Earth Switch Control Gate
Earth Switch Shutter
Isolator Switch Shutter
Circuit Breaker Spring
Charge Shutter
(clockwise to charge spring)
Circuit Breaker Spring Charge control gate
1Press the OPEN button VERY HARD.
1
Slide the Isolator/Earth Switch Control Gate down to
open the Earth Shutter.
2
Slide the right-hand Control Gate up to open the
Isolator Shutter.
2
Insert the Operating Lever and rotate clockwise to
close the Earth Switch.
3
Insert the Operating Lever and rotate anti-clockwise to
open the Isolator Switch.
3
Remove the Operating Lever. Check the
Control Gate has returned to the mid position.
CFeeder Connected u
Feeder Isolated u
DFeeder Isolated u
Feeder Earthed u
SG-L2 GUIDE-001 7/2/2019These instructions detail mechanical operation of standard designs only. This is a guide only, refer to manufacturers instructions for further important information.