
Table of contents
1 Introduction...................................................................................................................................................7
2 General scope of services ............................................................................................................................9
2.1 Routine test ............................................................................................................................11
2.2 Visual inspection ....................................................................................................................12
2.3 Function tests.........................................................................................................................13
2.4 Insulation test .........................................................................................................................14
3 Tests...........................................................................................................................................................15
3.1 Visual inspection ....................................................................................................................16
3.1.1 Rating plate ............................................................................................................................16
3.1.2 Housing degree of protection .................................................................................................16
3.1.3 Electrical cabinet components ...............................................................................................17
3.1.4 Cable installation....................................................................................................................17
3.1.5 Cable markings ......................................................................................................................18
3.1.6 Setting values of circuit breakers, if used...............................................................................18
3.1.7 Dimensions ............................................................................................................................18
3.1.8 Derating diagram....................................................................................................................19
3.1.9 List of the miniature circuit breakers and circuit breakers .....................................................19
3.1.10 Marine version........................................................................................................................19
3.2 Function test...........................................................................................................................21
3.2.1 Auxiliary voltages ...................................................................................................................21
3.2.2 Interrupted cable to the operator panel ..................................................................................21
3.2.3 DriveCLiQ connection, identification of the installed modules ...............................................21
3.2.4 Anti-condensation heating......................................................................................................22
3.2.5 Socket outlets and lighting .....................................................................................................22
3.2.6 Sensing the actual DC link voltage ........................................................................................23
3.2.7 Switching thresholds of the optional temperature evaluation device .....................................23
3.2.8 Safety shutdown (optional).....................................................................................................23
3.2.9 Temperature monitoring.........................................................................................................24
3.2.10 DC link voltage failure ............................................................................................................24
3.3 Function test with the test station motor.................................................................................26
3.3.1 Operation with the test station motor .....................................................................................26
3.3.2 Flying restart of the rotating test station motor.......................................................................26
3.3.3 Reduction of the output current..............................................................................................27
3.4 Cooling system test................................................................................................................28
3.4.1 Air flow direction.....................................................................................................................28
3.5 Insulation test .........................................................................................................................29
3.5.1 High-voltage test ....................................................................................................................29
3.5.2 Measuring the insulation resistance.......................................................................................30
Index...........................................................................................................................................................31
SINAMICS G150 6SL37102G E11 F72 F76 F79 L45 L50 L57 L68 M54 U11
Reference Manual Rev.201902141443 LV Umrichter 5