
ClimateWorx ProtoNode Start-up Guide
Page 4 of 46
TABLE OF CONTENTS
1Certifications........................................................................................................................................6
1.1 BTL Mark –BACnet®Testing Laboratory.......................................................................................6
1.2 LonMark Certification......................................................................................................................6
2Introduction..........................................................................................................................................7
2.1 ProtoNode Gateway .......................................................................................................................7
3Setup for ProtoNode............................................................................................................................8
3.1 Record Identification Data ..............................................................................................................8
3.2 Point Count Capacity and Registers per Device ............................................................................8
3.3 Configuring Device Communications .............................................................................................9
3.3.1 Input COM Settings on all Devices Connected to the ProtoNode ............................................9
3.3.2 Set Modbus Node-ID for each Device attached to the ProtoNode ...........................................9
3.4 Selecting the Desired Field Protocol ............................................................................................10
3.5 BMS Network Settings: MAC Address, Device Instance and Baud Rate ....................................11
3.5.1 BACnet MS/TP (FPC-N34): Setting the MAC Address for BMS Network ..............................11
3.5.2 BACnet MS/TP (FPC-N34): Setting the Baud Rate for BMS Network....................................12
3.5.2.1 Baud Rate DIP Switch Selection.....................................................................................12
4Interfacing ProtoNode to Devices....................................................................................................13
4.1 ProtoNode FPC-N34 and FPC-N35 Showing Connection Ports..................................................13
4.2 Device Connections to ProtoNode ...............................................................................................14
4.2.1 Biasing the Modbus RS-485 Device Network.........................................................................15
4.2.2 End of Line Termination Switch for the Modbus RS-485 Device Network..............................16
4.3 BACnet MS/TP or Metasys N2 (FPC-N34): Wiring Field Port to RS-485 Network......................17
4.4 LonWorks (FPC-N35): Wiring LonWorks Devices to the LonWorks Terminal.............................17
4.5 Power-Up ProtoNode....................................................................................................................18
5Use ProtoNode Web Configurator to Setup the Gateway .............................................................19
5.1 Connect the PC to ProtoNode via the Ethernet Port....................................................................19
5.2 Connecting to ProtoNode Web Configurator................................................................................20
5.3 Selecting Profiles for Devices Connected to ProtoNode..............................................................20
5.4 BACnet/IP and Modbus TCP/IP: Setting IP Address for Field Network.......................................22
6BACnet MS/TP and BACnet/IP: Setting Node_Offset to Assign Specific Device Instances.....24
7How to Start the Installation Over: Clearing Profiles.....................................................................25
8LonWorks (FPC-N35): Commissioning ProtoNode on a lonworks Network ...............................26
8.1 Commissioning ProtoNode FPC-N35 on a LonWorks Network...................................................26
8.1.1 Instructions to Download XIF File from ProtoNode FPC-N35 Using Browser........................26
9BACnet Explorer ................................................................................................................................28
Appendix A. Troubleshooting..................................................................................................................29
Lost or Incorrect IP Address ............................................................................................29Appendix A.1. Viewing Diagnostic information........................................................................................30Appendix A.2. Check Wiring and Settings...............................................................................................31Appendix A.3. LED Diagnostics for Communications Between ProtoNode and Devices.......................32
Appendix A.4. Take Diagnostic Capture with the FieldServer Toolbox ..................................................33Appendix A.5. Update Firmware .............................................................................................................36Appendix A.6. BACnet: Setting Network_Number for more than one ProtoNode on Subnet.................36Appendix A.7. Securing ProtoNode with Passwords ..............................................................................37Appendix A.8.
Appendix B. Vendor Information - ClimateWorx ...................................................................................38
M52 Controller Modbus RTU Mappings to BACnet, Metasys N2, Modbus TCP/IP andAppendix B.1.
LonWorks ................................................................................................................................................38
Appendix C. “A” Bank DIP Switch Settings ...........................................................................................42
“A” Bank DIP Switch Settings ..........................................................................................42Appendix C.1.