
3
MountingtheAttachment
FrametotheLiftArms
Partsneededforthisprocedure:
2Bolt(1/2–13x3/4inches)
2Lockwasher(1/2inch)
2Flatwasher(9/16x1–3/8inches)
2Hairpincotter
2Clevispin(5/16x1–22/25inches)
2Supportrod
2Bolt(1/2–13x1inch)
2Clevispin
2Bolt(3/8–16x1–3/4inches)
2Locknut(3/8–16inch)
1Rollpin(3/16x2–1/4inches)
1Attachmentframe
Procedure
1.Insertasupportrodintoeachendoftherear
tubeontheattachmentframe(Figure3).
Note:Makesurethethroughholeispositioned
atthetop.
2.Looselyattachthebottomofeachsupportrod
totheattachment-frametubewithabolt(1/2–13
x1inch),alockwasher(1/2inch),andaat
washer(9/16x1–3/8inches)asshowninFigure
3.
3.Positiontheattachmentframeunderthelift
arms.
4.MovetheliftlevertotheFLOATposition.Pusha
liftarmdownuntiltheholesintheliftarmlineup
withtheholesintheattachment-framebrackets
andthesupportrodscanbeinsertedintothe
liftarmpads(Figure3).
5.Securetheliftarmtotheattachmentframe
bracketswithaclevispin(Figure3).
6.Inserttheendofthehairpincotterintotheslot
intheattachmentframebrackettabtoretainthe
clevispin(Figure3).
g029543
Figure3
Rightliftarmshown
1.Bolt(1/2–13x3/4inches)7.Bolt(1/2–13x1inch)
2.Lockwasher(1/2inch)8.Clevispin
3.Flatwasher(9/16x1–3/8
inches)
9.Hairpincotter
4.Height-of-cutcollar10.Liftarm
5.Clevispin(5/16x1–22/25
inches)
11.Attachmentframe
6.Supportrod
7.Repeattheprocedureontheoppositeliftarm.
8.Startthetractionunitandraisetheattachment
frame.
9.Pushdownontherearoftheattachmentframe
andinsertthesupportrodsthroughthelift-arm
pads.
10.Installtheheight-of-cutcollarsontothesupport
rodsandsecurethemwiththeclevispinsand
hairpincotters(Figure3).
Note:Positiontheheadofclevispintowardthe
frontoftheattachmentframe.
11.Torquetheboltssecuringthesupportrodstothe
bottomoftheattachment-frametubeto75N⋅m
(102ft-lb)asshowninFigure3.
4