
LoadingtheTrencher
CAUTION
Attemptingtoloadorunloadthemachine
fromatrailerthatisnotsecurelyhitchedto
asuitablevehiclecouldcausethetrailerto
becomeunstable,andtipcausinginjuryto
youorbystanders.
Makesurethetrailerissecurelyhitchedto
asuitablevehicleparkedonalevelsurface
beforeattemptingtoloadorunloadthe
machine.
1.Removetheretainingstrapsandlowertheramp
totheground.
2.Removethetiedownbarpinandslidethebars
apart(Figure16).
Important:Allowthepinandchaintolayon
thecenterofthebedtoavoidrunningoverit
withthemachineanddamagingit.
g008374
Figure16
1.Tiedownbar2.Retainingpin
3.Startthetrencheraccordingtothedirectionsin
theOperator'sManualandruntheengineat
lowspeed.
4.Withthetrencherarmraisedinthetransport
positiondrivethemachineuptherampontothe
trailerbed.
5.Takecaretoloadthetrencherwiththetracks
betweenguiderailsonthetrailerbed(Figure
17).
6.Movethetrencherforwardslowlyuntilthefront
ofthemachinemeetstheforwardstoponthe
trailerbed.
g008375
Figure17
1.Forwardstop2.Guiderails
7.Turnthemachineoffandengagetheparking
brake.
8.Lowerthetrencherarmuntilitrestsonthefront
stop.
Note:Makesurethefrontcrosstubeofthe
trencherisfullyengagedtothefrontstopon
thetrailer.
9.Slidethetiedownbarstogetherthroughtherear
tiedownloops,aligningtheholestoallowfor
theretainingpin.Installthepin.
10.Raisetherampandusethestrapsandlynch
pinstosecureitinthetransportposition.
UnloadingtheTrencher
CAUTION
Attemptingtoloadorunloadthemachine
fromatrailerthatisnotsecurelyhitchedto
asuitablevehiclecouldcausethetrailerto
becomeunstable,andtipcausinginjuryto
youorbystanders.
Makesurethetrailerissecurelyhitchedto
asuitablevehicleparkedonalevelsurface
beforeattemptingtoloadorunloadthe
machine.
1.Removelynchpinssecuringtherampstraps.
Removethestrapsandslowlylowertheramp
totheground.
8